Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136E997 + (ML20136E997)
- IA-85-747, Responds to FOIA Request for FOIA Request 85-682 & NRC Response.Forwards FOIA-85-682.W/o Encl + (ML20136E997)
- ML20136E998 + (ML20136E998)
- ML20136E999 + (ML20136E999)
- ML20136F001 + (ML20136F001)
- 05000293/LER-1985-029, :on 851018,HPCI Inverter Circuit Failure Alarm & ATWS Trouble Alarm Received in Control Room Due to Breaker Trip.Caused by Fluctuation of Input Voltage.Hpci Inverter Previously Modified + (ML20136F003)
- ML20136F004 + (ML20136F004)
- IR 05000354/1985056 + (ML20136F006)
- ML20136F009 + (ML20136F009)
- ML20136F011 + (ML20136F011)
- ML20136F012 + (ML20136F012)
- IA-85-681, Responds to FOIA Request for Info Re Insp Repts & Enforcement Correspondence from 1975 to Present for Serono Diagnostics in Braintree,Randolph & Weymouth,Ma.Forwards App a Documents + (ML20136F012)
- ML20136F014 + (ML20136F014)
- ML20136F015 + (ML20136F015)
- ML20136F016 + (ML20136F016)
- 05000304/LER-1985-023-06, :on 851016,during Performance of Technical Staff Special Procedure Involving Dropping ESF Electrical Buses,Containment Isolation Valves Closed.Caused by Procedure Deficiency + (ML20136F018)
- ML20136F019 + (ML20136F019)
- ML20136F021 + (ML20136F021)
- ML20136F022 + (ML20136F022)
- ML20136F025 + (ML20136F025)
- ML20136F026 + (ML20136F026)
- ML20136F030 + (ML20136F030)
- ML20136F031 + (ML20136F031)
- ML20136F032 + (ML20136F032)
- ML20136F034 + (ML20136F034)
- HBL-85-061, Submits Rept Re Investigation of Radwaste Shipments for Which Notification of Receipt Not Received within 20 Days After Transfer.Formal Notification of Receipt of 851118 & 19 Shipments Received on 851211 & 10,respectively + (ML20136F035)
- ML20136F036 + (ML20136F036)
- ML20136F037 + (ML20136F037)
- ML20136F038 + (ML20136F038)
- 05000361/LER-1985-050, :on 851018,reactor Trip on Loss of Load Occurred.Caused by Turbine Trip Generated by Spurious High Drain Tank Level on Moisture Separator Reheater T096.Failed Pipe Nipple Replaced + (ML20136F039)
- ML20136F040 + (ML20136F040)
- HBL-85-058, Cancels 851203 & 10 Advance Notifications of Nuclear Waste Shipment.Advance Notification Not Needed Since Quantity of Radioactive Matl Contained in Shipment Does Not Exceed Quantities Listed in 10CFR71.97(b)(3) + (ML20136F042)
- ML20136F044 + (ML20136F044)
- ML20136F046 + (ML20136F046)
- ML20136F047 + (ML20136F047)
- 05000348/LER-1997-001-01, :on 970206,TS Ventilation Sys Deficiencies Discovered.Caused by Cognitive Personnel Error.Applicable Procedures Addressing Inadequate Flow Test Revised & Responsible Person Coached on Event + (ML20136F048)
- ML20136F050 + (ML20136F050)
- ML20136F051 + (ML20136F051)
- ML20136F052 + (ML20136F052)
- ML20136F056 + (ML20136F056)
- ML20136F057 + (ML20136F057)
- ML20136F061 + (ML20136F061)
- ML20136F062 + (ML20136F062)
- ML20136F063 + (ML20136F063)
- ML20136F064 + (ML20136F064)
- ML20136F066 + (ML20136F066)
- ML20136F072 + (ML20136F072)
- ML20136F073 + (ML20136F073)
- 05000327/LER-1985-049-02, :on 851206,waste Gas Hydrogen & Oxygen Analyzer Monthly Functional Test Not Performed in Oct.Caused by Scheduling Methods Utilized.Scheduling Method Improved to Prevent Recurrence + (ML20136F080)
- ML20136F083 + (ML20136F083)
- ML20136F084 + (ML20136F084)