Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134M013 + (ML20134M013)
- ML20134M014 + (ML20134M014)
- ML20134M015 + (ML20134M015)
- ML20134M016 + (ML20134M016)
- ML20134M017 + (ML20134M017)
- ML20134M018 + (ML20134M018)
- ML20134M019 + (ML20134M019)
- ML20134M020 + (ML20134M020)
- U-600239, Interim Potential Deficiency Rept 55-84-18 Re ASTM A-36 Plate Matl.Interim Repts Submitted on 850401 & 0703.Safety Significance Evaluation Completed.Addl 30 Days Needed to Finalize Investigation & Submit Final Rept + (ML20134M021)
- ML20134M023 + (ML20134M023)
- BSEP-97-0069, Identifies Five Major Issues as Result of Util Review & Addl Independent Reviews by NRC Re CREVS + (ML20134M025)
- ML20134M027 + (ML20134M027)
- NRC-96-0116, Submits 10-day Followup Rept Describing Results of Confirmatory Test & Insp Items,As Well as Closeout Summary for Util Response to NRC Bulletin 95-002 + (ML20134M028)
- ML20134M030 + (ML20134M030)
- BSEP-97-0039, Responds to RAI Re Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over SR Equipment + (ML20134M032)
- ML20134M033 + (ML20134M033)
- ML20134M034 + (ML20134M034)
- ML20134M036 + (ML20134M036)
- 2CAN029701, Responds to RAI Re TS Change on Extension of PPS Surveillance Test Interval to 123 Days + (ML20134M037)
- ML20134M038 + (ML20134M038)
- 05000341/LER-1995-008, Provides Commitment Made Re Suppl to LER 95-008 Concerning Nonconservative Bias in Heat Balance Methodology for Calculating Core Thermal Power + (ML20134M039)
- ML20134M041 + (ML20134M041)
- ML20134M042 + (ML20134M042)
- ML20134M043 + (ML20134M043)
- ML20134M044 + (ML20134M044)
- 05000482/LER-1996-011, :on 961016,determined That TS Clarification (TSC) 009-05 Was Inappropiate to Circumstances.Cause Indeterminate.Deleted & Removed TSC 009-05 from Control Room Required Reading + (ML20134M045)
- 2CAN029709, Submits follow-up Info Re TS Bases,Enabling on-line Testing of Selected Snubbers + (ML20134M046)
- RBG-43394, Monthly Operating Rept for Oct 1996 for River Bend Station Unit 1 + (ML20134M047)
- ML20134M048 + (ML20134M048)
- ML20134M049 + (ML20134M049)
- ML20134M050 + (ML20134M050)
- ML20134M051 + (ML20134M051)
- ML20134M052 + (ML20134M052)
- ML20134M053 + (ML20134M053)
- U-600240, Interim Potential Deficiency Rept 55-85-05 Re Inadequate Design Change Control by Zack Co.Sargent & Lundy,Inc Requires Addl Time to Perform Safety Significance Evaluation.Final Rept Will Be Submitted in Approx 30 Days + (ML20134M054)
- ML20134M055 + (ML20134M055)
- ML20134M057 + (ML20134M057)
- ML20134M058 + (ML20134M058)
- 05000341/LER-1996-008, :on 951213,one Megawatt Thermal Nonconservative Bias Found in Core Thermal Power Calculation.Caused by Heat Pump Seal Purge Flow Being Considered Insignificant During Original Heat Balance & Thermal Power Calculation + (ML20134M060)
- 05000213/LER-1985-019, :on 850726,ex-core Nuclear Instrumentation Power Range Channel 33 Spiked,Causing Actuation of Dropped Rod Load Runback Circuit.Caused by Failure of Gain Adjustment Potentiometer + (ML20134M061)
- ML20134M062 + (ML20134M062)
- ML20134M063 + (ML20134M063)
- ML20134M064 + (ML20134M064)
- ML20134M065 + (ML20134M065)
- ML20134M066 + (ML20134M066)
- 0CAN119608, Forwards Errata Sheet for Relief Requests for non-code Repair of Service Water Piping & Generic Relief + (ML20134M067)
- ML20134M068 + (ML20134M068)
- ML20134M069 + (ML20134M069)
- ML20134M070 + (ML20134M070)
- 1CAN029701, Informs That Listed Individuals No Longer Have Need to Maintain Operating License,Iaw 10CFR50.74 & Requests That Licenses for Individuals Be Withdrawn + (ML20134M072)
- ML20134M073 + (ML20134M073)