List of results
- 05000260/LER-1985-007-03, :on 850627,alternate Feeder Breaker Failed to Close,Resulting in Secondary Containment Isolation & Loss of Reactor Protection Sys Motor Generator.Caused by Breaker Failure Due to Loosened Bolts.Bolts Tightened + (ML20133A789)
- ML20133A790 + (ML20133A790)
- ML20133A791 + (ML20133A791)
- ML20133A793 + (ML20133A793)
- ML20133A794 + (ML20133A794)
- ML20133A797 + (ML20133A797)
- ML20133A798 + (ML20133A798)
- ML20133A799 + (ML20133A799)
- ML20133A800 + (ML20133A800)
- ML20133A801 + (ML20133A801)
- ML20133A804 + (ML20133A804)
- ML20133A805 + (ML20133A805)
- ML20133A806 + (ML20133A806)
- ML20133A809 + (ML20133A809)
- ML20133A810 + (ML20133A810)
- ML20133A811 + (ML20133A811)
- 05000456/LER-1996-013-06, :on 961205,area Radiation Monitor Setpoints Were Incorrect.Caused by Personnel Error Due to Inadequate Work Practices & Inattention to Detail.Effectiveness Review of These CAs Will Be Performed + (ML20133A812)
- ML20133A813 + (ML20133A813)
- ML20133A815 + (ML20133A815)
- ML20133A818 + (ML20133A818)
- ML20133A819 + (ML20133A819)
- ML20133A820 + (ML20133A820)
- ML20133A821 + (ML20133A821)
- ML20133A823 + (ML20133A823)
- ML20133A824 + (ML20133A824)
- NRC-96-0105, Loss of Shutdown Cooling Due to Inadvertent Closing of Residual Heat Removal Pump Shutdown Cooling Inboard Containment Isolation Valve Due to Interruption of Valve Control Logic + (ML20133A825)
- ML20133A830 + (ML20133A830)
- ML20133A838 + (ML20133A838)
- ML20133A840 + (ML20133A840)
- 05000250/LER-1985-015-01, :on 850626,voluntary Unit Cooldown Initiated Using Guidance of Tech Spec 3.0.1 Due to Detection of RCS Leak.Cause of 850625 Reactor Vessel O-ring Leakage Still Under Investigation + (ML20133A844)
- BECO-LTR-96-108, Forwards Rev 11D of Pilgrim Nuclear Power Station Colr + (ML20133A845)
- ML20133A846 + (ML20133A846)
- ML20133A849 + (ML20133A849)
- ML20133A851 + (ML20133A851)
- ML20133A852 + (ML20133A852)
- ML20133A855 + (ML20133A855)
- ML20133A857 + (ML20133A857)
- ML20133A859 + (ML20133A859)
- B16117, Completes 961018 Commitment to Identify Specific Design/ Operation Mod Required to Be Made to Ensure Availability of SBO Generator Any Time During Postulated 8 H Loop by 961231 + (ML20133A864)
- ML20133A866 + (ML20133A866)
- ML20133A871 + (ML20133A871)
- ML20133A873 + (ML20133A873)
- ML20133A875 + (ML20133A875)
- ML20133A877 + (ML20133A877)
- ML20133A878 + (ML20133A878)
- ML20133A880 + (ML20133A880)
- ML20133A882 + (ML20133A882)
- ML20133A884 + (ML20133A884)
- ML20133A887 + (ML20133A887)
- PNO-V-85-050, on 850726,while Preparing to Cool Down from 55-day Hot Functional Test Run,Alarm Received That Breaker Control Switch Operated W/O Authorization from Remote to Local Position.Cause Under Investigation + (ML20133A888)