Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133A670 + (ML20133A670)
- ML20133A672 + (ML20133A672)
- ML20133A674 + (ML20133A674)
- 2CAN129612, Requests Exemption from Requirements of Section Iii.O of 10CFR50,App R to Extent That It Requires Oil Collection Sys for Reactor Coolant Pumps to Be Capable of Collecting Lube Oil from All Potential Unpressurized Leakage Sites + (ML20133A676)
- ML20133A678 + (ML20133A678)
- PNO-I-85-071A, on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage + (ML20133A679)
- ML20133A680 + (ML20133A680)
- ML20133A682 + (ML20133A682)
- ML20133A683 + (ML20133A683)
- ML20133A684 + (ML20133A684)
- 2CAN129610, Proposed Tech Specs Revising Bases Associated w/ANO-2 TS 3/4.7.8 to Enable on-line Testing of Selected Snubbers by Clarifying Intent of TS + (ML20133A685)
- ML20133A688 + (ML20133A688)
- ML20133A689 + (ML20133A689)
- ML20133A690 + (ML20133A690)
- ML20133A691 + (ML20133A691)
- ML20133A692 + (ML20133A692)
- ML20133A693 + (ML20133A693)
- ML20133A694 + (ML20133A694)
- ML20133A695 + (ML20133A695)
- 3F1296-21, Suspected Operation Outside 10CFR50, App R Design Basis Involving fire-induced Failures + (ML20133A696)
- ML20133A697 + (ML20133A697)
- ML20133A698 + (ML20133A698)
- ML20133A701 + (ML20133A701)
- ML20133A703 + (ML20133A703)
- ML20133A705 + (ML20133A705)
- 05000354/LER-1995-033-14, Forwards LER 95-033-14.Design Change Package Will Be Completed Which Will Revise RBM Bypass Setpoint Calculation + (ML20133A706)
- ML20133A707 + (ML20133A707)
- ML20133A710 + (ML20133A710)
- ML20133A711 + (ML20133A711)
- ML20133A713 + (ML20133A713)
- ML20133A714 + (ML20133A714)
- ML20133A716 + (ML20133A716)
- ML20133A717 + (ML20133A717)
- U-600266, Forwards High Energy Line Break/Moderate Energy Line Break, Supplementary Review for Illinois Power Co. Rept Suppls Independent Design Review.All Issues Satisfactorily Addressed + (ML20133A720)
- ML20133A721 + (ML20133A721)
- ML20133A722 + (ML20133A722)
- ML20133A723 + (ML20133A723)
- IR 05000302/1985030 + (ML20133A725)
- ML20133A726 + (ML20133A726)
- ML20133A730 + (ML20133A730)
- PNO-III-97-001, on 961231,package Received in Saginaw,Mi Nuclear Pharmacy Exceeded DOT Limits.Mfg Intends to Proceed W/Investigation to Determine Cause of Problem.State of Mi & Ofc of Nuclear Matl Safety & Safeguards Notified + (ML20133A731)
- ML20133A733 + (ML20133A733)
- ML20133A734 + (ML20133A734)
- ML20133A735 + (ML20133A735)
- ML20133A737 + (ML20133A737)
- ML20133A738 + (ML20133A738)
- ML20133A740 + (ML20133A740)
- ML20133A742 + (ML20133A742)
- ML20133A743 + (ML20133A743)
- ML20133A747 + (ML20133A747)
- ML20133A749 + (ML20133A749)