Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133A035 + (ML20133A035)
- ML20133A037 + (ML20133A037)
- ML20133A039 + (ML20133A039)
- ML20133A040 + (ML20133A040)
- IR 05000382/1996009 + (ML20133A041)
- ML20133A042 + (ML20133A042)
- ML20133A043 + (ML20133A043)
- ML20133A045 + (ML20133A045)
- IR 05000312/1985008 + (ML20133A046)
- ML20133A048 + (ML20133A048)
- ML20133A049 + (ML20133A049)
- ML20133A051 + (ML20133A051)
- ML20133A052 + (ML20133A052)
- 05000482/LER-1985-047, :on 850622,hourly Fire Watch Patrol Not Performed in Several Areas of Auxiliary Bldg.Caused by Personnel Error.Individual Dismissed & Hourly Fire Watch Patrols Performed by Permanent Personnel + (ML20133A053)
- ML20133A054 + (ML20133A054)
- ML20133A055 + (ML20133A055)
- 05000282/LER-1996-019, :on 961127,spent Fuel Storage Racks Outside Design Basis Due to Boraflex Degradation.Boric Acid Has Been Placed in Immediate Vicinity of Spent Fuel Pool in Event Manual Addition Is Required + (ML20133A056)
- ML20133A057 + (ML20133A057)
- ML20133A060 + (ML20133A060)
- ML20133A061 + (ML20133A061)
- IR 05000298/1996019 + (ML20133A062)
- ML20133A063 + (ML20133A063)
- ML20133A064 + (ML20133A064)
- ML20133A065 + (ML20133A065)
- ML20133A066 + (ML20133A066)
- ML20133A068 + (ML20133A068)
- ML20133A069 + (ML20133A069)
- IA-85-296, Responds to FOIA Request for Encl to NRC 840912 Request for Addl Info Sent to Re Inservice Insp Program.Forwards Document.Document Also Being Placed in PDR + (ML20133A069)
- ML20133A070 + (ML20133A070)
- ML20133A071 + (ML20133A071)
- ML20133A073 + (ML20133A073)
- ML20133A074 + (ML20133A074)
- ML20133A075 + (ML20133A075)
- ML20133A077 + (ML20133A077)
- ML20133A078 + (ML20133A078)
- 3F1296-17, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-15.Corrective Actions:Event Has Been Reviewed with Personnel Responsible for Preparation + (ML20133A079)
- ML20133A080 + (ML20133A080)
- ML20133A083 + (ML20133A083)
- ML20133A084 + (ML20133A084)
- ML20133A086 + (ML20133A086)
- ML20133A087 + (ML20133A087)
- ML20133A091 + (ML20133A091)
- ML20133A092 + (ML20133A092)
- ML20133A094 + (ML20133A094)
- ML20133A096 + (ML20133A096)
- ML20133A097 + (ML20133A097)
- ML20133A098 + (ML20133A098)
- 05000461/LER-1996-019, :on 961120,inadequate Surveillance Procedures Were Noted Due to Misinterpretation of TS Bases Results in Source Range Monitor Reactor Period Display Not Verified. Procedures CPS 9031.13 Will Be Revised + (ML20133A100)
- ML20133A103 + (ML20133A103)
- ML20133A105 + (ML20133A105)
- ST-HL-AE-5521, Forwards Summary of Safety Evaluation of Changes,Tests & Experiments Conducted at STP + (ML20133A106)
- ML20133A107 + (ML20133A107)