Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117M599 + (ML20117M599)
- ML20117M603 + (ML20117M603)
- ML20117M618 + (ML20117M618)
- ML20117M619 + (ML20117M619)
- ML20117M622 + (ML20117M622)
- ML20117M624 + (ML20117M624)
- ML20117M628 + (ML20117M628)
- ML20117M633 + (ML20117M633)
- ML20117M634 + (ML20117M634)
- NSD-NRC-96-4745, Provides Info Required for Closure Re Status of Dser Open Items Re Piping Analysis + (ML20117M638)
- ML20117M643 + (ML20117M643)
- ML20117M645 + (ML20117M645)
- ML20117M649 + (ML20117M649)
- ML20117M652 + (ML20117M652)
- ML20117M654 + (ML20117M654)
- ML20117M660 + (ML20117M660)
- NSD-NRC-96-4747, Forwards Revised Drafts of SSAR Chapter 18 Table of Contents,Section 18.12 Inventory & Subsection 18.2.4 Human Factors Engineering Issues Tracking + (ML20117M662)
- ML20117M663 + (ML20117M663)
- 3F0696-02, Monthly Operating Rept for May 1996 for Crystal River Unit 3 + (ML20117M666)
- NRC-96-0068, Comments on Proposed Rule, Reporting Reliability & Availability Info for Risk-Significant Sys & Equipment + (ML20117M675)
- NSD-NRC-96-4818, Forwards non-proprietary Rev 1 to WCAP-13559, Operational Assessment for AP600 + (ML20117M676)
- ML20117M678 + (ML20117M678)
- ML20117M683 + (ML20117M683)
- BSEP-85-0914, Forwards Rev 19 to Emergency Response Plan & Revised Emergency Procedures,Including Rev 4 to PEP-04.2 Re Emergency Facilities & Equipment & Rev 5 to PEP-03.1.3 Re Use of Communications Equipment + (ML20117M684)
- ML20117M686 + (ML20117M686)
- NRC-96-0066, Provides Documentation of Util Responses to NRC Questions Asked During 960530 Telcon Re Combustion Tg 11 Unit 1 Reliability & Sys Refurbishment + (ML20117M687)
- ML20117M691 + (ML20117M691)
- ML20117M693 + (ML20117M693)
- ML20117M698 + (ML20117M698)
- PY-CEI-NRR-2062, Forwards Monthly Operating Rept for May 1996 for Perry Nuclear Power Plant & Revised Monthly Rept for Apr 1996 + (ML20117M701)
- ML20117M702 + (ML20117M702)
- ML20117M704 + (ML20117M704)
- ML20117M708 + (ML20117M708)
- ML20117M711 + (ML20117M711)
- 1CAN069606, Submits follow-up Info Re Open Containment Personnel Airlock During Core Alterations TS Change Request Requested by + (ML20117M720)
- ML20117M724 + (ML20117M724)
- 05000424/LER-1996-001, :on 960220,nuclear Svc Cooling Water Sys Determined Inoperable Due to Pipe Fatigue.All Discharge Line Weld Indications &/Or Cracks Have Been Repaired & Design Changes Have Been Implemented + (ML20117M727)
- ML20117M734 + (ML20117M734)
- ML20117M746 + (ML20117M746)
- ML20117M747 + (ML20117M747)
- 05000443/LER-1996-006, :on 960816,discovered Missed Surveillance Re Verification of Time Constant of Nis Rate Trip Circuit. Caused by Procedural Inadequacy.Revised Procedures for Performing Analog Channel Operability Test + (ML20117M755)
- ML20117M756 + (ML20117M756)
- ML20117M763 + (ML20117M763)
- ML20117M769 + (ML20117M769)
- ML20117M773 + (ML20117M773)
- 05000482/LER-1996-008, :on 960516,declared Essential Service Water Room Ventilation Inoperable.Caused by Inadequate Procedure. Revised Stn IC-465 & Counseled Personnel + (ML20117M779)
- ML20117M782 + (ML20117M782)
- ML20117M783 + (ML20117M783)
- ML20117M784 + (ML20117M784)
- ML20117M785 + (ML20117M785)
- ML20117M787 + (ML20117M787)