Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116M551 + (ML20116M551)
- 3F1192-11, Requests NRC Approval of Temporary non-code Repair to Moderate Energy Portions of Closed Cycle Cooling Sys,Per Generic Ltr 90-05 + (ML20116M554)
- ML20116M556 + (ML20116M556)
- ML20116M557 + (ML20116M557)
- ML20116M561 + (ML20116M561)
- 05000311/LER-1996-006-02, :on 960717,sample Flow to non-radioactive Liquid Radwaste Monitor Was Not Adequate to Meet Plant Ts.Cause of Event Is Under Investigation.Design of 2R37 Sample Line Has Been Revised + (ML20116M565)
- ML20116M566 + (ML20116M566)
- ML20116M568 + (ML20116M568)
- ML20116M572 + (ML20116M572)
- ML20116M574 + (ML20116M574)
- 3F0896-12, Forwards 90-Day Inservice Inspection Summary Report IAW 1983 Edition of ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA-6000 Which Includes NIS-1 Form & Summary of Exams Performed Since Preceding Summary Rept + (ML20116M577)
- ML20116M579 + (ML20116M579)
- ML20116M610 + (ML20116M610)
- 2CAN089607, Monthly Operating Rept for July 1996 for ANO-2 + (ML20116M616)
- ML20116M617 + (ML20116M617)
- ML20116M618 + (ML20116M618)
- 3F0896-01, Monthly Operating Rept for Jul 1996 for Crystal River Unit 3 + (ML20116M627)
- 05000374/LER-1985-013-04, :on 850328,during Performance of Group V Isolation Sys Functional Test LES-PC-05,Group Vi,Div 2 Isolation Occurred.Caused by Relay deenergization.LES-PC-05 Being Revised to Prevent Recurrence + (ML20116M631)
- ML20116M648 + (ML20116M648)
- U-602625, Monthly Operating Rept for July 1996 for Clinton Power Station,Unit 1 + (ML20116M662)
- 1CAN089603, Monthly Operating Rept for July 1996 for ANO-1 + (ML20116M664)
- ML20116M670 + (ML20116M670)
- ML20116M672 + (ML20116M672)
- ML20116M676 + (ML20116M676)
- ML20116M679 + (ML20116M679)
- 05000301/LER-1992-005, Forwards LER 92-005-00,per TS 15.4.2.A.7(a) After Each ISI, Number of Tube Plugged or Repaired in Each SG Shall Be Reported to Commission as Soon as Practical. Rept Also Reported Per TS Table 15.4.2-1 & TS 15.4.2.A.7(b) + (ML20116M687)
- ST-HL-AE-1241, Forwards Amend 46 to FSAR for South Texas Project Units 1 & 2 + (ML20116M696)
- ML20116M700 + (ML20116M700)
- ML20116M707 + (ML20116M707)
- 05000301/LER-1992-005-01, :on 921022,SG Tube Degradation Revealed.Tubes Plugged + (ML20116M709)
- ML20116M712 + (ML20116M712)
- ML20116M719 + (ML20116M719)
- ML20116M720 + (ML20116M720)
- ML20116M735 + (ML20116M735)
- ML20116M737 + (ML20116M737)
- ML20116M739 + (ML20116M739)
- NRC-96-0073, Monthly Operating Rept for Ju1 1996 for Fermi 2 + (ML20116M752)
- ML20116M759 + (ML20116M759)
- ML20116M764 + (ML20116M764)
- ML20116M765 + (ML20116M765)
- ML20116M767 + (ML20116M767)
- U-600017, Clarifies Use of Phrase W/Generic Implications in Third Criterion for Termination of Util Overinsp Program Discussed in .Further Reinsp for Nonconforming Condition Unique to Item Would Not Be Productive + (ML20116M777)
- ML20116M778 + (ML20116M778)
- RBG-37750, Forwards Reactor Containment Bldg Integrated Leak Rate Test Summary Technical Rept + (ML20116M788)
- ML20116M790 + (ML20116M790)
- ML20116M800 + (ML20116M800)
- ML20116M803 + (ML20116M803)
- ML20116M805 + (ML20116M805)
- ML20116M811 + (ML20116M811)
- TXX-9254, Discusses Performing Inspections of All Unit 1 Rccas After No More than Seven Equivalent Annual Cycles of Operation Due to Accelerated Wear + (ML20116M813)
- ML20116M826 + (ML20116M826)