Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-19857, Final Deficiency Rept DR-173 Re Shop Radiographs for Welds on Main Steam Pipe Elbows Supplied by Ge.Welds Reradiographed After Weld Ripple Ground.Item Not Reportable Per 10CFR50.55(e) + (ML20113H032)
- ML20113H054 + (ML20113H054)
- ML20113H105 + (ML20113H105)
- ML20113H120 + (ML20113H120)
- ML20113H126 + (ML20113H126)
- 05000247/LER-1984-024, :on 841218,erroneous Weld Channel Pressurization Line Connection Discovered.Caused by Personnel Error.Contractor QC Procedures Enhanced to Prevent Further Occurences + (ML20113H130)
- ML20113H151 + (ML20113H151)
- 3F0185-05, Informs of Intention to Pursue Large Bore Snubber Optimization Program Utilizing Generic Methodology of BAW-1847, Leak-Before-Break Evaluation of Margins..., Per 850114 Telcon.Concurrence Requested by May 1985 + (ML20113H153)
- 05000373/LER-1984-089-01, :on 841225,high Ammonia Alarm Received in Control Room Ventilation/Auxiliary Electric Equipment Room Ventilation Sys.Cause Could Not Be Determined.Alarm Reset + (ML20113H159)
- 05000315/LER-1984-035, :on 841221,during Review of 18-month Surveillance Test Procedure for Ice Condenser Intermediate Deck Doors,Seven Doors Exceeded Tech Spec Requirement.Doors Lubricated & Tested + (ML20113H162)
- ML20113H172 + (ML20113H172)
- ML20113H179 + (ML20113H179)
- ML20113H186 + (ML20113H186)
- ML20113H191 + (ML20113H191)
- ML20113H205 + (ML20113H205)
- ML20113H214 + (ML20113H214)
- B14199, Responds to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Containment Temp Monitored for Sudden Temp Increases + (ML20113H215)
- ML20113H216 + (ML20113H216)
- ML20113H220 + (ML20113H220)
- 05000461/LER-1992-007-01, :on 920623,determined That Previously Performed Testing for Loss of Power Not in Accordance W/Ts.Caused by Misinterpretation of Test Requirements by Writers. Procedures Will Be Revised Per TS + (ML20113H233)
- ML20113H295 + (ML20113H295)
- ML20113H301 + (ML20113H301)
- ML20113H304 + (ML20113H304)
- ML20113H308 + (ML20113H308)
- ML20113H333 + (ML20113H333)
- ML20113H336 + (ML20113H336)
- ML20113H338 + (ML20113H338)
- ML20113H341 + (ML20113H341)
- ML20113H369 + (ML20113H369)
- 3F0185-08, Application for Amend to License DPR-72,changing Tech Specs to Provide Operability & Surveillance Requirements for Emergency Feedwater Sys Automatic & Manual Initiation Channels.Fee Paid + (ML20113H374)
- ML20113H395 + (ML20113H395)
- TXX-4396, Forwards Update to Justification for Interim Operation for Equipment Environ Qualification Packages.Packages Will Not Be Completed by 850331 Due to Test Complications.Safety Evaluation Should Reflect New Deadline of 851130 + (ML20113H407)
- ML20113H418 + (ML20113H418)
- ML20113H428 + (ML20113H428)
- 05000271/LER-1992-018, :on 920627,during Repairs,Ups Trouble Alarm Received.Caused by Design Weakness in UPS Control Circuitry.Circuitry Was Reviewed & Mod Will Be Implemented Into Both UPS Units + (ML20113H431)
- 05000333/LER-1992-037, :on 920626,determined That Two RHR & Two CR Containment Isolation Valves Would Not Allow Remote Control Closure.Caused by Design Error.Design Mods to Identified Valves in Progress + (ML20113H433)
- 05000445/LER-1992-017, :on 920626,main Steam Supply Valves to AFW Turbine Not Quarterly Close stroke-time Tested.Caused by Procedure Error.Review of Inservice Test Valve Data Will Be Conducted + (ML20113H434)
- 05000369/LER-1992-009, :on 920625,reactor Trip Occurred,Due to Removal of Solid State Protection Sys Fuse.Caused by Inappropriate Action & Mgt Deficiency.Frequency of Preventive Maint Increased + (ML20113H436)
- 05000259/LER-1992-003-03, :on 920626,RPS Bus B de-energized Causing Actuation of Several Esfs.Caused by 1B2 Circuit Protector Trip.Rps Bus B Transferred to Alternate Power source.1B1 & 1B2 Circuit Protectors Also Being Monitored + (ML20113H439)
- 05000333/LER-1992-036, :on 920626,determined That RCIC Vacuum Breaker Line Inadequately Protected Against HELB Effects.Caused by Erroneous Design Basis Analysis.Restraint Will Be Installed on RCIC Steam Supply Line + (ML20113H441)
- 05000328/LER-1992-008-01, :on 920627,reactor Tripped Due to Coincident Logic of Overtemp,Differential Temp Reactor Protection. Caused by RCS RTD Out of Svc Due to Receipt of Spurious Alarm.Rtd Removed from Scan + (ML20113H444)
- ML20113H445 + (ML20113H445)
- 05000321/LER-1992-020, :on 920710,main CR Environ Control Sys Automatically Transferred to Pressurization Mode When CR Air Intake Radiation Monitor Tripped.Caused by Instrument Setpoint Drift.Trip Setpoint Adjusted + (ML20113H446)
- 05000458/LER-1992-010, :on 920624,radiation Protection Technician Encountered Two Mechanical Maint Craftsmen in High Radiation Area.Caused by Failure to Heed Physical Barriers. Personnel Disciplined & Retrained + (ML20113H447)
- TXX-4399, Forwards Updated Engineering & Const Status Rept.Pages Deleted for Items Whose Deferral Beyond Fuel Load Has Been Accepted by NRC + (ML20113H448)
- ML20113H449 + (ML20113H449)
- ML20113H452 + (ML20113H452)
- ML20113H455 + (ML20113H455)
- ML20113H458 + (ML20113H458)
- 05000482/LER-1992-011, :on 920626,discovered That Testing Frequency for EDG B Had Not Been Increased to at Least Once Per Seven Days,Per Tss.Caused by Personnel Error.Procedure Adm 01-0244 EDG Reliability... Will Be Revised + (ML20113H474)
- ML20113H477 + (ML20113H477)