Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BECO-LTR-96-011, Provides FFD Program Performance Data for Pilgrim Nuclear Power Station,For Period Jul-Dec 1995 + (ML20100G865)
- ST-HL-AE-5291, Forwards Semiannual FFD Program Performance Rept for STP Units 1 & 2,covering Period Jul-Dec 1995,per 10CFR26.71(d) + (ML20100G870)
- 05000277/LER-1996-001-01, :on 960118,licensed Thermal Power Slightly Exceeded Due to Unaccounted for CRD Water Flow.Caused by Failure to Consider Impact of Addl Flow on Core Thermal Power.Mod Design Process Will Be Enhanced.W/Undated Ltr + (ML20100G878)
- ML20100G880 + (ML20100G880)
- ML20100G885 + (ML20100G885)
- ML20100G887 + (ML20100G887)
- ML20100G888 + (ML20100G888)
- ML20100G890 + (ML20100G890)
- ML20100G902 + (ML20100G902)
- ML20100G903 + (ML20100G903)
- ML20100G907 + (ML20100G907)
- ML20100G917 + (ML20100G917)
- ML20100G918 + (ML20100G918)
- ML20100G927 + (ML20100G927)
- ML20100G933 + (ML20100G933)
- ML20100G938 + (ML20100G938)
- BECO-LTR-96-010, Provides Suppl Info on Reactor Pressure Vessel Augmented Exam Requested by NRC in 951207 Telcon + (ML20100G950)
- 0CAN029612, Forwards Corrected Page 15 of 17 of Attachment to 960213 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Correcting Last Sentence of Last Paragraph as Listed + (ML20100G954)
- ML20100G956 + (ML20100G956)
- ML20100G967 + (ML20100G967)
- 05000395/LER-1996-001, :on 960119,discovered Condition Not Covered by Plant Operating Emergency Procedures.Caused by Personnel Error.Use of Charging/Si Pump C on ESF Train B Administratively Restricted + (ML20100G969)
- ML20100G970 + (ML20100G970)
- ML20100G994 + (ML20100G994)
- 3F0296-09, Requests Exemption from Section III.G.2 of 10CFR50,App R Re Certain Redundant Cables & Equipment in Reactor Containment Bldg at Facility + (ML20100H005)
- 05000446/LER-1996-002, :on 960126,noted That TS Surveillance for Turbine Overspeed Missed Due to Oversight in Rescheduling Required Surveillance by Cognizant Personnel.Test Completed on 960126 & Event Reviewed as Lesson Learned + (ML20100H007)
- LIC-96-0015, Requests NRC Approval to Implement Provisions of ASME Code Case N-533 in Lieu of Requirements Stated in Article IWA-5242(a),re Insulation Removal for Class 1 pressure- Retaining Bolted Connections + (ML20100H009)
- 05000395/LER-1996-002, :on 960126,voluntary Entry Into TS 3.0.3 Made to Recover Train a Chillwater Due to Equipment Problem on Chiller a Which Was Supplying Train a ESF Equipment.No Specific Corrective Action for Event Warranted + (ML20100H010)
- ML20100H025 + (ML20100H025)
- 05000454/LER-1985-026, :on 850228,radiation Monitor 1PR11J Left Isolated from Containment Atmosphere After Maint Activity on Valve 1PR001B.Administrative Controls Implemented to Ensure Sys Integrity/Proper Restoration After Maint + (ML20100H030)
- ML20100H049 + (ML20100H049)
- ML20100H050 + (ML20100H050)
- ML20100H051 + (ML20100H051)
- 3F0296-08, Provides Brief Discussion of Facility Refueling Outage 10 Activities of Mutual Interest + (ML20100H053)
- ML20100H060 + (ML20100H060)
- 05000261/LER-1985-010, :on 850301,reactor Tripped from 52% Power Due to Loss of Feed Flow to Steam Generator B.Caused by Air Line Separation from Feedwater Regulating Valve Due to Valve Vibrations.Valve Internals to Be Replaced + (ML20100H061)
- 05000325/LER-1985-013, :on 850307 & 22,control Bldg HVAC Sys Manually Isolated Due to Receipt of High Chlorine Alarms at Chlorination Sys Storage Location.Cause Not Determined + (ML20100H065)
- 05000416/LER-1995-012, :on 951102,discovered That Allowable Opening Area for CR Envelope Boundary Exceeded.Caused by Inaffective or Incomplete C/A of Previous CR Envelope Event.Wos for Control Bldg Verified & Access Panels Labeled + (ML20100H066)
- ML20100H068 + (ML20100H068)
- ML20100H077 + (ML20100H077)
- NLS8500048, Public Version of Rev 3 to General Ofc Guidelines Manual for Emergency Response Activities + (ML20100H080)
- 05000269/LER-1985-003-01, :on 850222,emergency Safeguard Features Actuation Sys Setpoint for Initiation of HPI Set Too Low. Caused by sensor-instrumentation Error.Hpi Actuation on Low RCS Pressure Setpoint Reset + (ML20100H084)
- ML20100H085 + (ML20100H085)
- ML20100H086 + (ML20100H086)
- ML20100H088 + (ML20100H088)
- ML20100H092 + (ML20100H092)
- ML20100H096 + (ML20100H096)
- U-602556, Forwards Initial Operator Exam Schedule Requested in NRC Administrative Ltr 96-01.Next Operator Requalification Exam as Listed + (ML20100H098)
- 3F0296-16, Forwards Completed NRC Form 536, Operator Licensing Exam Data for Facility as Requested in Administrative Ltr 96-01, Including Info Re Estimated Number of Candidates to Be Examined During Visits to Site + (ML20100H104)
- 05000251/LER-1985-021, :on 840920,turbine Runback & Reactor Trip Occurred Upon Nis Rod Drop Signal.Caused by Failure of Inverter 4A to Provide Power to Vital 120-volt Instrument Bus,Panel 4P07,due to Blown Fuse + (ML20100H105)
- HL-5116, Forwards Proposed Operator Licensing Schedule for FY96-99. Informs That 1996 Dates for Licensed Operator Requalification Exams Scheduled for Wks of 960812,26,0909, 23 & 1007 + (ML20100H106)
- ML20100H112 + (ML20100H112)