Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100G714 + (ML20100G714)
- ML20100G716 + (ML20100G716)
- ML20100G718 + (ML20100G718)
- ML20100G719 + (ML20100G719)
- ML20100G720 + (ML20100G720)
- ML20100G721 + (ML20100G721)
- ML20100G722 + (ML20100G722)
- RC-96-0040, Forwards VC Summer Nuclear Station FFD Rept for Period of Jul-Dec 1995.Rept Includes Required Tests Results,Data Analyses & Summary of Mgt Actions Taken as Result of Testing + (ML20100G724)
- ML20100G725 + (ML20100G725)
- ML20100G730 + (ML20100G730)
- 0CAN029603, Forwards ANO FFD Program Performance Data for Period of Jul-Dec 1995,per 10CFR26.71(d) + (ML20100G731)
- ML20100G740 + (ML20100G740)
- ML20100G751 + (ML20100G751)
- ML20100G759 + (ML20100G759)
- ML20100G764 + (ML20100G764)
- ML20100G770 + (ML20100G770)
- RBG-20-500, Forwards Proposed Changes to NRC Second Draft of Tech Specs. Brief Description of Proposed Change,Justification for Change & marked-up Pages from Second Draft Also Encl + (ML20100G783)
- B11503, Application for Amend to License DPR-65,revising Tech Specs Re Chlorine Setpoints,Control Room Emergency Ventilation Sys Flow Rate,Insertion of Control Room Monitoring & Elimination of Date Associated W/Reg Guide 1.95.Fee Paid + (ML20100G790)
- NRC-96-0008, Forwards Response to Questions on Proposed EDG TS Change + (ML20100G797)
- ML20100G800 + (ML20100G800)
- 05000255/LER-1996-002-01, :on 960116,initiated TS Required Shutdown Due to Safeguards Cable Fault.Root Cause of Failure Under Investigation.Const Cable Installation Spec Will Be Revised & Testing of Faulted Cable Will Be Performed + (ML20100G807)
- ML20100G815 + (ML20100G815)
- ML20100G819 + (ML20100G819)
- ML20100G826 + (ML20100G826)
- ML20100G831 + (ML20100G831)
- L-2020-064, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information + (ML20100G832)
- ML20100G833 + (ML20100G833)
- ML20100G835 + (ML20100G835)
- ML20100G836 + (ML20100G836)
- 05000369/LER-1985-009-01, :on 850219,estmated 1 Cubic Ft of Contaminated Spent Resin Released from Vent.Resin Discovered on 850220 on Roof of Auxiliary Bldg & Other Bldgs.Caused by Personnel Error + (ML20100G843)
- ML20100G853 + (ML20100G853)
- 05000331/LER-1985-006, :on 850303,while Resetting Isolations & Alarms Resulting from Instrument Panel a Being Deenergized,Standby Diesel Generator a Which Had Not Been Locked Began to auto-start.Generator Secured + (ML20100G857)
- BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 + (ML20100G858)
- ML20100G861 + (ML20100G861)
- ML20100G864 + (ML20100G864)
- BECO-LTR-96-011, Provides FFD Program Performance Data for Pilgrim Nuclear Power Station,For Period Jul-Dec 1995 + (ML20100G865)
- ST-HL-AE-5291, Forwards Semiannual FFD Program Performance Rept for STP Units 1 & 2,covering Period Jul-Dec 1995,per 10CFR26.71(d) + (ML20100G870)
- 05000277/LER-1996-001-01, :on 960118,licensed Thermal Power Slightly Exceeded Due to Unaccounted for CRD Water Flow.Caused by Failure to Consider Impact of Addl Flow on Core Thermal Power.Mod Design Process Will Be Enhanced.W/Undated Ltr + (ML20100G878)
- ML20100G880 + (ML20100G880)
- ML20100G885 + (ML20100G885)
- ML20100G887 + (ML20100G887)
- ML20100G888 + (ML20100G888)
- ML20100G890 + (ML20100G890)
- ML20100G902 + (ML20100G902)
- ML20100G903 + (ML20100G903)
- ML20100G907 + (ML20100G907)
- ML20100G917 + (ML20100G917)
- ML20100G918 + (ML20100G918)
- ML20100G927 + (ML20100G927)
- ML20100G933 + (ML20100G933)
- ML20100G938 + (ML20100G938)