Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000366/LER-1984-029, :on 840810,sliding Fire Door for 600-volt Station Svc Switchgear Room 2-C Obstructed by Door of Switchgear Cabinet 2H21-P051.Caused by Personnel Error. Personnel Cautioned + (ML20100E828)
- ML20100E835 + (ML20100E835)
- ML20100E843 + (ML20100E843)
- FVY-84-140, Forwards Rev 2 to FSAR for Vermont Updated Yankee Nuclear Power Plant,Consisting of Updated Pages Reflecting Plant Conditions 6 Months Prior to 840531 Filing + (ML20100E913)
- ML20100E946 + (ML20100E946)
- ML20100E961 + (ML20100E961)
- ML20100E970 + (ML20100E970)
- ML20100E976 + (ML20100E976)
- ML20100E977 + (ML20100E977)
- ML20100E979 + (ML20100E979)
- RBG-19-607, Forwards Response to Instrumentation & Control Sys Branch Request for Addl Info Re SER Confirmatory Item 43,Table 1.4 Re Emergency Response & Info Sys.Encl Changes to FSAR Text Will Be Incorporated Into Future Amend + (ML20100E981)
- ML20100E983 + (ML20100E983)
- ML20100E987 + (ML20100E987)
- ML20100E993 + (ML20100E993)
- ML20100E994 + (ML20100E994)
- ML20100E997 + (ML20100E997)
- IR 05000275/2020301 + (ML20100F010)
- ML20100F022 + (ML20100F022)
- ML20100F041 + (ML20100F041)
- ML20100F045 + (ML20100F045)
- ML20100F057 + (ML20100F057)
- ML20100F059 + (ML20100F059)
- ML20100F061 + (ML20100F061)
- ML20100F066 + (ML20100F066)
- ML20100F068 + (ML20100F068)
- NRC-84-0128, Forwards Revised FSAR Page 3.8-53 Re Structural Steel Welding for Review & Approval.Deviation Acceptable Because Convexity Has No Detrimental Effect on Structural Capacity of Weld Provided All Parameters or Weld Maintained + (ML20100F072)
- RBG-19-604, Forwards Response Finalizing SER Confirmatory Item 39,Table 1.4 Re Safety Relief Valve Relief Function.Changes Will Be Incorporated in Future FSAR Amend + (ML20100F073)
- ML20100F080 + (ML20100F080)
- ML20100F086 + (ML20100F086)
- ML20100F090 + (ML20100F090)
- ML20100F094 + (ML20100F094)
- ML20100F095 + (ML20100F095)
- ML20100F096 + (ML20100F096)
- ML20100F105 + (ML20100F105)
- ML20100F106 + (ML20100F106)
- ML20100F108 + (ML20100F108)
- ML20100F110 + (ML20100F110)
- PLA-4423, Forwards Change II to Physical Security Plan.Encl Withheld (Ref 10CFR73.21) + (ML20100F135)
- ML20100F140 + (ML20100F140)
- ML20100F142 + (ML20100F142)
- ML20100F160 + (ML20100F160)
- 05000361/LER-1985-021, :on 850219,fuel Handling Isolation Sys Trains a & B Actuated Due to Increased Radioactive Gaseous Activity in Fuel Handling Bldg.Caused by Open Vent Valve. Procedure Revised to Require Open Vent Tagging + (ML20100F161)
- PLA-2366, Responds to NRC Re Violations Noted in Enforcement Conference Rept 50-388/84-34.Corrective Actions: Mods to Activate Control Room Annunciator on Loss of Dc Control Power Under Evaluation + (ML20100F172)
- W3P84-3344, Discusses Generic Ltr 83-28,Sections 4.2.3 & 4.2.4 Re Life Cycle Testing & Periodic Replacement Requirements for Reactor Trip Breakers (RTB).C-E Program for Breaker Performance Assures Reliable Rtb Performance + (ML20100F174)
- ML20100F182 + (ML20100F182)
- ML20100F185 + (ML20100F185)
- W3P84-3247, Forwards Clarification of Info Submitted by Re Test Descriptions within Subsection 14.2.12.2 of FSAR Chapter 14,indicating Portions That Would Be Performed After Fuel Load.Changes Will Be Implemented in Future Amend + (ML20100F191)
- ML20100F195 + (ML20100F195)
- ML20100F197 + (ML20100F197)
- ML20100F204 + (ML20100F204)
- RC-96-0032, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20100F205)