Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096H615 + (ML20096H615)
- ML20096H619 + (ML20096H619)
- ML20096H626 + (ML20096H626)
- ML20096H631 + (ML20096H631)
- ML20096H632 + (ML20096H632)
- 05000416/LER-1992-002-03, :on 920320,determined That Actuators for Suppression Pool Makeup Sys Dump Valves Undersized,Per Generic Ltr 89-10.Caused by Use of Min Flowrate in Actuators.Torque Switch Setting Reset + (ML20096H633)
- ML20096H635 + (ML20096H635)
- ML20096H644 + (ML20096H644)
- ML20096H648 + (ML20096H648)
- ML20096H650 + (ML20096H650)
- ML20096H657 + (ML20096H657)
- ML20096H662 + (ML20096H662)
- ML20096H672 + (ML20096H672)
- ML20096H675 + (ML20096H675)
- ML20096H687 + (ML20096H687)
- ML20096H696 + (ML20096H696)
- ML20096H700 + (ML20096H700)
- ML20096H706 + (ML20096H706)
- ML20096H709 + (ML20096H709)
- ML20096H714 + (ML20096H714)
- RA-96-0015, Transmits Three Copies of Rev 31 to Industrial Security Plan for Plant.Plan Withheld + (ML20097A003)
- ML20097A013 + (ML20097A013)
- ML20097A018 + (ML20097A018)
- ML20097A019 + (ML20097A019)
- SBK-L-20049, Relief Request 3IIR-7, Proposed Alternative to Deter Examinations Beyond the 1 Year Code Allowable + (ML20097A021)
- RA-20-0087, Response to Request for Additional Information Regarding Request for Alternative in Accordance with 10CFR 50.55a(z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period + (ML20097A026)
- ML20097A037 + (ML20097A037)
- ML20097A053 + (ML20097A053)
- ML20097A072 + (ML20097A072)
- ML20097A084 + (ML20097A084)
- ML20097A090 + (ML20097A090)
- ML20097A093 + (ML20097A093)
- ML20097A111 + (ML20097A111)
- ML20097A115 + (ML20097A115)
- LD-92-069, Forwards Rept NPX80-IC-DR-791-02, Human Factors Engineering Stds,Guidelines & Bases for Nuplex 80+. Rept Provides Info to Suppl Previous RAI Responses on Human Factors Engineering of Control Room,In Fulfillment of 920417 Commitments + (ML20097A118)
- ML20097A125 + (ML20097A125)
- ML20097A127 + (ML20097A127)
- ML20097A129 + (ML20097A129)
- RBG-42414, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-458/95-25.Corrective Actions:Condition Rept 95-1145 Was Initiated to Document Described Condition & Implement Corrective Actions + (ML20097A133)
- ML20097A135 + (ML20097A135)
- 05000458/LER-1996-002, :on 960105,return Piping Weld for RHR Was Missing from Suppression Pool Level.Caused by Lack of Fusion on C Steel Side of Weld.Reassembled Pipe in Sys During Scheduled Maint Period Outage + (ML20097A138)
- NRC-92-0067, Forwards Rev 19 to Physical Security Plan.Rev Withheld + (ML20097A149)
- ML20097A150 + (ML20097A150)
- ML20097A157 + (ML20097A157)
- 05000446/LER-1996-001, :on 960107,allowed Outage Time Was Exceeded in Conjunction W/Enforcement Discretion for RCS Instrument Channel.Caused by Action Statement Requirements Not Being Met + (ML20097A159)
- ML20097A163 + (ML20097A163)
- ML20097A164 + (ML20097A164)
- 05000458/LER-1995-013-02, :on 951228,operation Was Outside TS Limits Due to Trip,Maint & Repair of EDG Ii.Repaired Lube Oil Cooler Leak + (ML20097A169)
- NG-96-0063, Application for Amend to License DPR-49,proposing Rev to Ts. Proposed Change Will Revise CR Scram Insertion Time Testing Limits + (ML20097A172)
- ML20097A178 + (ML20097A178)
- JPN-96-005, Forwards Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode + (ML20097A183)