Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093M192 + (ML20093M192)
- ML20093M195 + (ML20093M195)
- ML20093M206 + (ML20093M206)
- ML20093M239 + (ML20093M239)
- ML20093M241 + (ML20093M241)
- ML20093M251 + (ML20093M251)
- ML20093M252 + (ML20093M252)
- ML20093M253 + (ML20093M253)
- ML20093M254 + (ML20093M254)
- ML20093M259 + (ML20093M259)
- ML20093M261 + (ML20093M261)
- ML20093M265 + (ML20093M265)
- ML20093M269 + (ML20093M269)
- ML20093M270 + (ML20093M270)
- SNRC-1086, Provides Emergency Response Capability Implementation Schedule for Suppl 1 to NUREG-0737, Requirements for Emergency Response Capability. Phase II of Safety Parameter Display Sys Operational Upon Startup from First Outage + (ML20093M281)
- ML20093M282 + (ML20093M282)
- B11332, Forwards Change to FSAR Re Model Damping Values Utilized for Dynamic Analysis of Piping Sys,Per 840913-14 Meetings + (ML20093M283)
- ML20093M284 + (ML20093M284)
- ML20093M287 + (ML20093M287)
- ML20093M291 + (ML20093M291)
- ML20093M292 + (ML20093M292)
- ML20093M293 + (ML20093M293)
- ML20093M296 + (ML20093M296)
- ML20093M297 + (ML20093M297)
- 1CAN108407, Advises That Response to Generic Ltr 81-21 Re Natural Circulation Cooldown Delayed Until End of Nov Due to Postponed B&W Owners Group Analysis Committee Sept 1984 Meeting & New Developments Concerning Issue + (ML20093M302)
- B11341, Requests 2-wk Extension to Respond to NRC 840813 Request for Assurance within 60 Days That Facility Designed & Constructed Per FSAR Commitments.Addl Time Necessary to Prepare Supporting Matl for Full & Complete Response + (ML20093M315)
- ML20093M319 + (ML20093M319)
- ML20093M326 + (ML20093M326)
- ML20093M330 + (ML20093M330)
- ML20093M332 + (ML20093M332)
- 2CAN108405, Requests Reimbursement of Fee for 830927 Tech Spec Change Request Re Hydrogen Analyzer Calibr,Based on NRC 840801 Conclusion That Present Calibr Requirement Would Afford More Accurate Measurement + (ML20093M339)
- ML20093M343 + (ML20093M343)
- ML20093M344 + (ML20093M344)
- ML20093M348 + (ML20093M348)
- ML20093M350 + (ML20093M350)
- ML20093M351 + (ML20093M351)
- ML20093M359 + (ML20093M359)
- ML20093M360 + (ML20093M360)
- ML20093M366 + (ML20093M366)
- ML20093M370 + (ML20093M370)
- ML20093M371 + (ML20093M371)
- ML20093M376 + (ML20093M376)
- ML20093M378 + (ML20093M378)
- ML20093M395 + (ML20093M395)
- ML20093M399 + (ML20093M399)
- 3F1084-13, Discusses Temporary Storage of Two Neutron Sources in Spent Fuel Pool A.B&W Evaluation Indicated No Hazard to Neutron Production Level or Spent Fuel Pool Criticality Safety. Evaluation Encl + (ML20093M400)
- ML20093M405 + (ML20093M405)
- ML20093M412 + (ML20093M412)
- ML20093M414 + (ML20093M414)
- LD-84-060, Forwards Minor Mods to CESSAR Chapter 14 to Facilitate Improved Testing Procedure.Changes Only Affect Tests Performed After Fuel Loading & Do Not Affect NRC Requirements.Mods Will Be Incorporated Into Amend to CESSAR + (ML20093M415)
- ML20093M425 + (ML20093M425)