Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092G785 + (ML20092G785)
- ML20092G787 + (ML20092G787)
- ML20092G791 + (ML20092G791)
- ML20092G793 + (ML20092G793)
- 05000282/LER-1984-002-01, :on 840521,air Hose Routed Through Shield Bldg Doors Causing Breach of Integrity.Caused by Procedure Error. Airlock Leakage Test Procedure Revised to Emphasize Integrity Requirements + (ML20092G797)
- ML20092G798 + (ML20092G798)
- ML20092G802 + (ML20092G802)
- ML20092G807 + (ML20092G807)
- ML20092G808 + (ML20092G808)
- ML20092G809 + (ML20092G809)
- ML20092G811 + (ML20092G811)
- ML20092G812 + (ML20092G812)
- ML20092G816 + (ML20092G816)
- ML20092G820 + (ML20092G820)
- ML20092G821 + (ML20092G821)
- ML20092G823 + (ML20092G823)
- ML20092G824 + (ML20092G824)
- ML20092G826 + (ML20092G826)
- 05000327/LER-1984-035, :on 840521 & 0602,turbine Trip Occurred Due to Failure of Bearing.Caused by Thermocouple Shorting to Ground.Thermocouple Replaced + (ML20092G827)
- ML20092G828 + (ML20092G828)
- ML20092G829 + (ML20092G829)
- ML20092G835 + (ML20092G835)
- ML20092G838 + (ML20092G838)
- ML20092G839 + (ML20092G839)
- ML20092G840 + (ML20092G840)
- ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station + (ML20092G844)
- ML20092G847 + (ML20092G847)
- ML20092G851 + (ML20092G851)
- ML20092G855 + (ML20092G855)
- ML20092G858 + (ML20092G858)
- ML20092G859 + (ML20092G859)
- ML20092G860 + (ML20092G860)
- ML20092G861 + (ML20092G861)
- RC-95-0236, Comment Opposing Draft RG DG-1043,Proposed Rev 2 to RG 1.49, NPP Simulation Facilities for Use in Operator Exams + (ML20092G865)
- ML20092G870 + (ML20092G870)
- ML20092G871 + (ML20092G871)
- AECM-84-0315, Application for Amend to License NPF-13,changing Tech Specs in Hydrologic & Geotechnical Engineering & Meteorology & Effluent Treatment Sys Branch Areas of Review + (ML20092G873)
- ML20092G874 + (ML20092G874)
- ML20092G879 + (ML20092G879)
- ML20092G881 + (ML20092G881)
- ML20092G882 + (ML20092G882)
- ML20092G884 + (ML20092G884)
- 1CAN068405, Forwards Response to 840507 Request for Addl Info Re Core Exit Thermocouple Sys.Readings from wide-range,hot-leg Temp Indications of Reactor Protection Sys Will Be Incorporated Into Inadequate Core Cooling Guidelines + (ML20092G888)
- B15362, Submits Response to Issue on Behalf of Activities at Unit 3. Written Response to Issue Requested to Be Submitted within 60 Days from Date of NRC Ltr + (ML20092G889)
- ML20092G893 + (ML20092G893)
- ML20092G895 + (ML20092G895)
- ML20092G896 + (ML20092G896)
- 05000456/LER-1995-007-05, :on 950713,testing of DG Voltage Regulator in 1988 Was Inadequate Due to Mgt Deficiency.Developed Procedure Which Verified Performance of Voltage Regulator & Governor Under Transient Loading Conditions + (ML20092G899)
- ML20092G905 + (ML20092G905)
- ML20092G911 + (ML20092G911)
- BECO-LTR-95-095, Forwards Response to 950821 RAI Re Proposed TS Change Affecting Scram Insertion Times & Mcpr.Proprietary Info Also Encl.Proprietary Info Withheld + (ML20092G913)