Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091P713 + (ML20091P713)
- 05000321/LER-1984-003-01, :on 840508,fuel Rod F1 Determined to Be in bowed-to-contact Condition Outside Gap Criterion Calculate Design Mcpr.Caused by Crud Induced Localized Corrosion.Fuel Bundle Not Returned to Svc in Reactor + (ML20091P715)
- 05000362/LER-1984-019-01, :on 840505,post-maint Testing Not Performed Following Packing Adjustment to Reduce Leakage on Containment Isolation Valves 3HV9205 & 3HV9212.Caused by Personnel Error.Operations Personnel Briefed + (ML20091P717)
- ML20091P720 + (ML20091P720)
- 2CAN089505, Rev to 950404 Application for Amends to Licenses DPR-51 & NPF-6 Re RCP Flywheel Insps.Change Would Allow Util to Delay Ultrasonic Volumetric Exam of Flywheel for RCP 2P32A for One Cycle + (ML20091P722)
- ML20091P731 + (ML20091P731)
- NLS8400159, Responds to 840419 Generic Ltr 84-11 Re Insps for IGSCC & Interim Leakage Detection.Requirements Imposed by 830901 Confirmatory Order Meet Intent of Leak Detection & Leakage Limits.Lists Components to Be Replaced + (ML20091P735)
- ML20091P742 + (ML20091P742)
- 05000336/LER-1995-029, :on 950728,determined That Insufficient RBCCW Flow Would Be Provided to ESF Rooms Ventilation Sys HX Following Sump Recirculation Actuation Signal.Repositioned Coolers X-36A & X-36B Discharge Valves + (ML20091P744)
- ML20091P750 + (ML20091P750)
- JPN-92-006, Special Rept:On 911116,nonfunctional Fire Barrier Penetration Seal Not Restored to Operable Status within 7 Days.Application to Extend Fire Barrier Penetration Surveillance Until 920515 Submitted.Ler 91-024-00 Encl + (ML20091P753)
- ML20091P768 + (ML20091P768)
- ML20091P781 + (ML20091P781)
- ML20091P790 + (ML20091P790)
- ML20091P792 + (ML20091P792)
- ML20091P794 + (ML20091P794)
- ML20091P797 + (ML20091P797)
- ML20091P799 + (ML20091P799)
- ML20091P800 + (ML20091P800)
- ML20091P806 + (ML20091P806)
- 05000336/LER-1995-031, :on 950803,CEA Not Able to Be Aligned W/Group in 1 H Required by TS Due to Power Supply Failure.Actions Specified in AOP 2556, CEA Malfunction,Section 4.3, Dropped Rod + (ML20091P811)
- 05000265/LER-1992-001-01, :on 920101,main Turbine Manually Tripped.Group I Primary Containment Isolation & Reactor Scram Occurred. Caused by Pressure Wave in Msl.Isolation Trip Logic Will Be Revised During Next Outage + (ML20091P817)
- ML20091P818 + (ML20091P818)
- 05000458/LER-1991-023, :on 911226,reactor Water Cleanup Pumps Outboard Suction Valve Received an Isolation Signal from Liquid Control Sys & Pumps Tripped on Low Flow.Caused by Procedure Inadequacy.Test Procedure Changed + (ML20091P821)
- 05000362/LER-1984-013, :on 840330 & 0401,following Reactor Shutdown for Maint,Rcs Sample Analysis Indicated That RCS Specific Activity Exceeded 1.0 Uci/G Dose Equivalent I-131.Cause Indicative of Iodine Spiking Following Power Change + (ML20091P824)
- TXX-3663, Forwards Relief Request D-3 Re Integral Attachments & F-1 Re Component Supports to Be Included as Part of Previously Transmitted Preservice Insp Plan + (ML20091P829)
- 05000362/LER-1984-015-01, :on 840427,0505 & 07,analysis of RCS Sample Indicated That Specific Activity Exceeded 1.0 Uci/G Dose Equivalent I-131.Cause Not Stated.Personnel Instructed to Perform Sampling within Required 4 H Period + (ML20091P831)
- ML20091P843 + (ML20091P843)
- NG-84-2219, Responds to NRC Re Violations Noted in IE Insp Rept 50-331/84-05.Corrective Actions:All Operations Shift Supervisors Scheduled to Receive Annual Emergency Preparedness Training During 840604-0720 + (ML20091P857)
- ML20091P872 + (ML20091P872)
- ML20091P879 + (ML20091P879)
- ML20091P882 + (ML20091P882)
- ML20091P890 + (ML20091P890)
- 05000425/LER-1991-001-04, :on 920110,CVI Occurred Due to Radiation Monitor Failure W/No Abnormal Radiation Condition.Caused by Apparent Failure of Dectector Tube Assembly. Assembly Replaced & Evaluation Conducted + (ML20091P893)
- ML20091P897 + (ML20091P897)
- ML20091P902 + (ML20091P902)
- ML20091P909 + (ML20091P909)
- ML20091P915 + (ML20091P915)
- ST-HL-AE-3958, Requests That Implementation Dates for Listed TS Changes Be Scheduled as Outlined + (ML20091P922)
- ML20091P924 + (ML20091P924)
- BVY-92-007, Confirms That Util Has Completed Administrative Implementation Requirements to Utilize ERDS to Transmit Emergency Data.Procedures Have Been Modified & Mgt Controls Have Been Implemented to Assure Continuing Quality of Data + (ML20091P925)
- 05000305/LER-1984-011, :on 840510 & 11,shield Bldg Recirculation Fan 1A Found Operating W/Associated Dampers Open.No Apparent Cause Evident.Auxiliary Contact on Fan Motor Starter Replaced + (ML20091P927)
- A09805, Informs That Review of Issues Re Employee Concerns for Allegation RI-91-A-0070 Complete.Comments Encl + (ML20091P929)
- NLS8400162, Responds to Request for Info Re NUREG-0737,Item II.K.3.16, Reduction of Challenges & Failures of Relief Valves & Addresses Questions on Recommended Mods.All Target Rock three-stage Safety Relief Valves Replaced + (ML20091P939)
- A09768, Informs That Review of Issues Re Employee Concerns for Allegation RI-91-A-0079 Complete.Comments Encl + (ML20091P944)
- ML20091P945 + (ML20091P945)
- A09698, Informs That Review of Issues Re Employee Concerns for Allegation RI-91-A-0162 Complete.Comments Encl + (ML20091P953)
- 05000374/LER-1991-013, :on 911007,breaker for Supply Fan Tripped & Smoke Observed Coming Out of Switchgear .236X Compartment 302B.Caused by Overheating of Relay,Resulting in Mechanical Binding.Relay Replaced + (ML20091P958)
- ML20091P959 + (ML20091P959)
- A09819, Informs That Review of Issues Re Employee Concerns for Allegation RI-91-A-0163 Complete.Comments Encl + (ML20091P961)
- ML20091P963 + (ML20091P963)