Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079A873 + (ML20079A873)
- ML20079A876 + (ML20079A876)
- ML20079A880 + (ML20079A880)
- ML20079A894 + (ML20079A894)
- BECO-LTR-94-137, Ack Receipt & Review of SALP Board Rept for Period Covering 930314-941008 + (ML20079A898)
- 05000423/LER-1991-012, :on 910503,spurious Control Bldg Isolation Signals Occurred.Caused by Radiation Monitor Power Supply Failure.Single Channel Area Monitor Board Replaced & Satisfactorily Tested + (ML20079A912)
- 05000354/LER-1991-007-01, :on 910505,filtration,recirculation & Ventilation Sys Units Discovered Inoperable During Surveillance Test.Caused by Blown Heater Control.Blown Fuses Replaced & Unit Returned to Operable Status + (ML20079A913)
- 05000298/LER-1991-002, :on 910324,reactor Water Cleanup Isolation Occurred Due to High Sys Temp.Caused by Inadequate Design. Design Process for Plant Changes Strengthened Since Design Completed + (ML20079A915)
- 05000339/LER-1991-002-03, :on 910514,automatic Start of 2H Emergency Diesel Generator Occurred Caused by de-energization of 2H Emergency Bus.Caused by Personnel Error.Abnormal Procedure Loss of Electrical Power Entered + (ML20079A917)
- ML20079A918 + (ML20079A918)
- 05000271/LER-1994-016, :on 941130,unisolable Svc Water Piping Leaks Resulting in Inoperability of Ws Subsystems & Alternate Cooling Subsystem.Ut Insps Have Been Completed on Similar Piping in SW Sys W/O Other Problems + (ML20079A919)
- 05000366/LER-1991-014, :on 910508,discrepancy Noted Between TS 3.9.10 & Design of High Density Fuel Storage Sys Racks in Spent Fuel Pool.Caused by Less than Adequate Design Change Safety Evaluation.Change to TS 3.10.D Will Be Sent + (ML20079A921)
- 05000277/LER-1991-011-01, :on 910508,discovered That ST 16.2.1, Fire Sys Weekly Check Inadvertently Deferred Beyond TS Time Limit. Caused by Misleading Test Frequency Listed on Test.Test Revised & Event Reviewed W/Personnel + (ML20079A923)
- 05000285/LER-1991-009, Corrected Ltr Forwarding LER 91-009-00.Memo Stationery Inadvertently Used Instead of Letterhead Stationery for Cover Ltr + (ML20079A925)
- ML20079A927 + (ML20079A927)
- 05000354/LER-1991-009-01, :on 910508,full Reactor Protection Sys Actuation Occurred Due to Electronic Spiking of Intermediate Range Monitor G.Caused by Equipment Malfunction.Monitor Replaced Prior to Plant Return to Power + (ML20079A928)
- 05000325/LER-1991-012, :on 910503,unexpected ESF Actuation Occurred While Hanging Clearance.Caused by Personnel Error.Involved Clearance Ctr Personnel Counseled & Review of Event Conducted in Operations Real Time Training + (ML20079A930)
- 05000325/LER-1991-013, :on 910507,coincident Hpic/Rcic Discovered Inoperable.Caused by Loss of RCIC High Steam Flow Transmitter.Tightening of Leaking Fitting & Venting & Filling of Sensing Lines Performed + (ML20079A931)
- ML20079A934 + (ML20079A934)
- 05000425/LER-1991-007-02, :on 910507,automatic Reactor Trip Occurred. Caused by Generator Loss of Field.Design Change Implemented to Allow Plant Computer to Monitor Status of Generator Field Shorting Breaker + (ML20079A935)
- ML20079A937 + (ML20079A937)
- ML20079A941 + (ML20079A941)
- 05000374/LER-1991-001-01, :on 910110,high Pressure Core Spray Pump Room & Turbine Bldg Fire Rated Barrier Discovered Degraded During Insp.Caused by Failure to Install Fire Barriers.Establish Hourly/Continuous Fire Watch + (ML20079A944)
- BSEP-94-0522, Forwards Response to NRC Re Violations Noted in Insp Repts 50-324/94-32 & 50-325/94-32 on 941001-1104. Corrective Actions:Work Supervisor Has Been Counseled Re Weaknesses in Preplanning for Job + (ML20079A947)
- 05000263/LER-1991-010, :on 910507,reaction Protection Sys Actuation Occurred.Caused by Spurious Increase of Intermediate Range Monitor Signals.Investigation Initiated.Procedures Revised + (ML20079A948)
- 05000259/LER-1991-006-02, :on 910507,unplanned ESF Actuation Occurred When Control Room Emergency Ventilation Sys Initiated. Caused by Design Which Made It Difficult to Perform Work. Util Will Evaluate Need for Design Change + (ML20079A949)
- ML20079A950 + (ML20079A950)
- 05000354/LER-1991-008-01, :on 910507,reactor Scram on Low Water Level Occurred.Caused by Personnel Error.Counseling Controls Technician Re self-verification & Attention to Detail & Implementing Design Change + (ML20079A951)
- 05000414/LER-1991-007-01, :on 910510,tech Spec 3.0.3 Entered as Result of Both Trains of Auxiliary Building Ventilation Filtered Sys Being Inoperable.Caused by Inappropriate Action Due to Lack of Attention to Detail + (ML20079A954)
- 05000413/LER-1991-012, :on 910505,air Sucked from Ice Condenser During Core Alterations Due to Deficient Communication Between Cro & Ice Machine Operator.Ice Making & Charging Sys Procedure OP/O/B/6200/16 Will Be Revised + (ML20079A961)
- ML20079A964 + (ML20079A964)
- ML20079A967 + (ML20079A967)
- 05000333/LER-1991-006-01, :on 910507,manual Reactor Shutdown Occurred Due to Inoperability of Both Low Pressure Coolant Injection Subsystems.Caused Mechancial Failure of One Valve in Each of Two Sys.Root Cause Investigation Started + (ML20079A971)
- 05000482/LER-1991-006, :on 910512,auxiliary Feedwater Actuation & Control Room Ventilation Isolation Occurred When Power Supply in ESF Actuation Sys Failed.Caused by Faulty 15 Volt Power Supply.Power Supply Replaced + (ML20079A974)
- 05000334/LER-1991-013, :on 910510,pressurizer Code Safety Valve Lift Setting Discovered Less than Tech Spec Limits.Caused by Failure of Valves to Lift within Setpoint.Beaver Valley Test Procedure Criteria Reevaluated + (ML20079A976)
- ML20079A979 + (ML20079A979)
- B13834, Application for Amend 47 to License NPF-49,modifying Tech Spec 4.6.4.2.b.4, Electric Hydrogen Recombiners, to Provide Variable Acceptance Criteria for Flow Testing Containment Pressures + (ML20079A999)
- ML20079B003 + (ML20079B003)
- 05000382/LER-1991-007-01, :on 910510,review of Calculation EC-E89-007 Revealed That Electronic Sensor Current Transformer Rating on 480-volt safety-related Bus Incorrect.Caused by Failure to Verify Amperage Rating.New Bus Installed + (ML20079B006)
- B15067, Application for Amend to License NPF-49,modifying SR 4.8.1.1.2.g.3 That Will Permit DG Full Load Rejection Tests to Be Performed at Realistic Plant Conditions Using Power Factor to Envelope Calculated Power Factor + (ML20079B013)
- 05000368/LER-1991-013-01, :on 910512,fire Watches Released from Inoperable Fire Barriers Prematurely.Caused by Inadequate Documentation Re Posting Requirements.Approval by Fire Protection Required Prior to Release in Future + (ML20079B017)
- DCL-91-152, Forwards Substitution Page for Change 3 to Rev 17 for Physical Security Plan,Submitted 901019.Encl Withheld (Ref 10CFR73.21) + (ML20079B022)
- BSEP-94-0517, Transmits 1993 Annual Rept Per 10CFR50.59(b)(2), for Brunswick Nuclear Plant + (ML20079B023)
- ML20079B029 + (ML20079B029)
- ML20079B032 + (ML20079B032)
- 05000333/LER-1994-009-01, :on 941129,partial Invalid Primary Containment Isolation as Result of Personnel Error During Electrical Bus Power Source Transfer.Operations Personnel Restored Sys to Normal in Accordance W/Plant Procedures + (ML20079B038)
- ML20079B046 + (ML20079B046)
- HL-4760, Forwards Response to NRC Re Violations Noted in Insp Repts 50-321/94-27 & 50-366/94-27.Corrective Actions: Event Was Investigated Per Requirements of Plant Administrative Control Procedure 10AC-MGR-004-0S + (ML20079B061)
- ML20079B063 + (ML20079B063)
- BSEP-94-0513, Forwards Brunswick Nuclear Plant Three-Yr Business Plan Performance Improvement Initiatives & Projects + (ML20079B077)
- ML20079B081 + (ML20079B081)