Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079A138 + (ML20079A138)
- ML20079A149 + (ML20079A149)
- ML20079A158 + (ML20079A158)
- ML20079A163 + (ML20079A163)
- RC-95-0046, Requests Discontinuation of Seismic Monitoring Network Around Plant,On Basis That Min Requirements of OL Condition 2.C (24) Have Been Satisfied + (ML20079A165)
- ML20079A166 + (ML20079A166)
- ML20079A178 + (ML20079A178)
- AECM-90-0179, Responds to NRC Re Violations Noted in Insp Rept 50-416/90-15.Corrective Actions:Procedure 02-S-01-5 Changed to Require Control Power Fuses & Fuse Replacements Be Recorded in Log Book + (ML20079A179)
- BECO-90-116, Submits Commitment to Change Procedure 1.2.1, Operations Review Committee, Per 900809 Proposed Amend to Tech Spec Section 6 + (ML20079A182)
- ML20079A185 + (ML20079A185)
- BECO-90-115, Responds to Generic Ltr 90-03 Re Vendor Interface for safety-related Components,Per 840427 & s.Vendor Program Based on Vendor Equipment Technical Info Program,Per Nuclear Util Task Action Committee Rept INPO 80-010 + (ML20079A188)
- ML20079A193 + (ML20079A193)
- ML20079A214 + (ML20079A214)
- ML20079A223 + (ML20079A223)
- ML20079A229 + (ML20079A229)
- ML20079A230 + (ML20079A230)
- ML20079A235 + (ML20079A235)
- ML20079A238 + (ML20079A238)
- ML20079A244 + (ML20079A244)
- ML20079A246 + (ML20079A246)
- ML20079A256 + (ML20079A256)
- ML20079A268 + (ML20079A268)
- ML20079A272 + (ML20079A272)
- ML20079A274 + (ML20079A274)
- ML20079A285 + (ML20079A285)
- ELV-02162, Monthly Operating Repts for Sept 1990 for Vogtle Electric Generating Plant Units 1 & 2 + (ML20079A304)
- ML20079A307 + (ML20079A307)
- ML20079A323 + (ML20079A323)
- ML20079A327 + (ML20079A327)
- HL-4785, Fitness for Duty Performance Data for six-month Reporting period,Jul-Dec 1994 + (ML20079A332)
- ML20079A341 + (ML20079A341)
- HL-4787, 1994 Annual Operating Period + (ML20079A342)
- LIC-90-0762, Advises That Completion Date to Revise AOP-16 Per Violations Noted in Insp Rept 50-285/90-14 Extended Until 901101 + (ML20079A376)
- JAFP-95-0082, Special Rept:On 950109,inoperability of Fire Suppression Features Associated W/Listed Areas Noted.Low Carbon Dioxide Concentration Deficiency Will Be Corrected by Changing Discharge Timer Setpoint + (ML20079A381)
- ML20079A404 + (ML20079A404)
- ML20079A418 + (ML20079A418)
- ML20079A451 + (ML20079A451)
- ML20079A455 + (ML20079A455)
- AECM-90-0181, Forwards Response to NRC Comments on Project Systematic Motor Actuator Reliability Testing,Per NRC + (ML20079A461)
- ML20079A465 + (ML20079A465)
- NG-94-4632, Forwards Response to NRC Request for Addl Info Re MSIV Leakage Control Sys TS Amend Request (RTS-232) + (ML20079A471)
- NRC-90-0151, Discusses Status of Outstanding Generic Ltr 88-14 Item. NRC Will Be Notified When Implementation of Outstanding Item Complete + (ML20079A477)
- ML20079A482 + (ML20079A482)
- ML20079A493 + (ML20079A493)
- NRC-94-0090, Forwards Relief Request VR-59 for IST Program for Pumps & Valves to Resolve Listed Inspector follow-up Item Noted in Insp Rept 50-341/94-09.ISI Program Revised to Include Relief Request + (ML20079A497)
- ML20079A504 + (ML20079A504)
- ML20079A505 + (ML20079A505)
- ML20079A534 + (ML20079A534)
- ML20079A536 + (ML20079A536)
- ML20079A558 + (ML20079A558)
- ML20079A566 + (ML20079A566)