Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000457/LER-1994-006-09, :on 940920,chemical & Volume Control Sys Snubber Was Removed in Order to Work on Adjacent Containment Spray Valve.Caused by Programmatic Deficiency. Work Control Procedure Will Be Revised + (ML20078B276)
- BSEP-95-0012, Forwards Nonproprietary Version of Brunswick Steam Electric Plant,Unit 1 Feedwater Nozzle Fracture Mechanics Analysis, NEDC-30634,Rev 1.Requests That Copies of Document Originally Submitted by Util Be Destroyed + (ML20078B300)
- ML20078B304 + (ML20078B304)
- ML20078B307 + (ML20078B307)
- 05000325/LER-1994-012-01, :on 940922,declared HPCI Inoperable Due to Failure of Lube Oil Cooling Water Supply Valve Control Power Fuse.Caused by Inadequate self-checking & Job Scope Walkdown.Disciplined Involved Workers + (ML20078B310)
- 05000454/LER-1994-014-04, :on 940915,declared DG Inoperable in Mode 5 Due to Misinterpretation of TS Requirements.Revised Procedures & Electronic Work Control Sys + (ML20078B312)
- ML20078B321 + (ML20078B321)
- NRC-94-0095, Confirms All Actions in Response to NRC Bulletin 93-002, Suppl 1 Completed + (ML20078B322)
- ML20078B331 + (ML20078B331)
- ML20078B337 + (ML20078B337)
- ML20078B341 + (ML20078B341)
- ML20078B342 + (ML20078B342)
- ML20078B344 + (ML20078B344)
- ML20078B345 + (ML20078B345)
- ML20078B348 + (ML20078B348)
- 05000301/LER-1994-002-01, :on 940713,quarterly TS Test of PORV Block Valve Not Performed.Caused by Improper Temporary Change to IST Procedure IT-25.Temporary Change Approved on 940707 + (ML20078B354)
- ML20078B356 + (ML20078B356)
- ML20078B359 + (ML20078B359)
- ML20078B362 + (ML20078B362)
- 05000321/LER-1994-011, :on 940930,unplanned Automatic Start of EDG Occurred Due to Personnel Error.Involved Electrician Made Aware of Mistake & Consequences + (ML20078B370)
- LD-83-143, Responds to NRC Re Violations Noted in IE Insp Rept 50-528/83-31.Corrective Actions:Startup Personnel to Ensure All Procedure Action Statements Complete.Const Power Cable Removed & Returned to Const for Disposition + (ML20078B371)
- ML20078B381 + (ML20078B381)
- PY-CEI-NRR-1876, Responds to NRC Re Violations Noted in Insp Rept 50-440/94-11 on 940707-0818.Corrective Actions:Event Has Been Reviewed W/I&C Personnel Involved W/Planning of Work Order Package + (ML20078B382)
- 05000306/LER-1994-004-02, :on 941220,discovered That CWS Snubber Was Not Tested as Required.Caused by Oversight by Project Engineer. Removed Snubber for Further Testing & Installed Replacement Snubber + (ML20078B394)
- ML20078B398 + (ML20078B398)
- GO2-83-837, Revised Final Deficiency Rept 271 Re Anchor Darling Valves W/Antirotation Collars (LPCS-V-121).Startup Problem Rept M-2720 Issued to Document deficiency.L-shaped Key Used for Valves Subj to Heavy Vibration + (ML20078B400)
- LD-83-103, Amends Re Route for Irradiated Reactor Fuel Shipments Between West Valley,Ny & Facility.Approval of Alternative Route Requested + (ML20078B410)
- ML20078B415 + (ML20078B415)
- ML20078B419 + (ML20078B419)
- PY-CEI-NRR-1836, Provides Description of Incident & Investigation Conclusions Re 940615 Telephone Rept Made to Region III Concerning Finding of Incorrect Info in Util ,Reporting Completion of Ipe.Rept Made on 940615 Withdrawn + (ML20078B427)
- ML20078B435 + (ML20078B435)
- ML20078B439 + (ML20078B439)
- ML20078B447 + (ML20078B447)
- 05000461/LER-1994-009, :on 941220,operator Failed to Initiate Operability of Offsite Ac Power Sources within One H After Declaring Div 3 EDG Inoperable Due to Oversight.Event Reviewed & Findings Discussed + (ML20078B457)
- BECO-LTR-94-110, Forwards Responses to Questions Raised by NRC During 941004 Meeting Re Pilgrim Shroud Safety Assessment + (ML20078B459)
- ML20078B463 + (ML20078B463)
- ML20078B467 + (ML20078B467)
- ML20078B471 + (ML20078B471)
- ML20078B478 + (ML20078B478)
- ML20078B479 + (ML20078B479)
- ML20078B481 + (ML20078B481)
- ML20078B483 + (ML20078B483)
- ML20078B497 + (ML20078B497)
- ML20078B498 + (ML20078B498)
- ML20078B504 + (ML20078B504)
- ML20078B508 + (ML20078B508)
- ML20078B519 + (ML20078B519)
- 05000298/LER-1994-022, :on 940919,TS Maximum Flow Limitation for LPCI Sys Were Not Proven by Existing Sp 6.3.5.1.Caused by non-compliance W/Ts Surveillance Requirements.Design Change Acceptance Testing Performed + (ML20078B528)
- 05000362/LER-1983-053-03, /03L-0:on 830816,boronometer 3AE0203 Declared Inoperable Following Downward Drifting Readings.Caused by High Linear Amplifier Setting & High Voltage Adjustment. Boronometer Recalibr + (ML20078B529)
- ML20078B533 + (ML20078B533)
- PY-CEI-NRR-1872, Forwards Completed NRC Form 536,providing Update of Estimate Number of Candidates to Be Examined During Site Visits for FY95-98 & Estimate Number of Candidates That Will Participate in Generic Fundamentals Exam for FY95 + (ML20078B534)