Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078A853 + (ML20078A853)
- ML20078A860 + (ML20078A860)
- 05000321/LER-1983-087-03, /03L-0:on 830819,Fire Doors C3,15 & 2R52 Would Not Close & Latch & Door R24 Damaged.Caused by Component Failure.Fire Watches Established.Doors C3,15 & R24 Repaired on 830824 + (ML20078A862)
- 05000317/LER-1980-038-03, Control Room Air Conditioning Compressor 12 Tripped & Would Not Restart.On 800801 Compressor Tripped on Overcurrent.Caused by Amps Higher than Specs.Load Demand Adjusted + (ML20078A870)
- 05000389/LER-1983-048-03, /03L-0:on 830816,Channel a Qualified Safety Parameter Display Sys Subcooled Margin Monitor Failed. Caused by Feedback of Noise from Plasma Display Unit Tripping Computer.Trips Reset + (ML20078A877)
- ML20078A878 + (ML20078A878)
- ML20078A881 + (ML20078A881)
- ML20078A883 + (ML20078A883)
- 05000325/LER-1983-032-03, /03L-0:on 830824,25 & 29 During Shutdown,Startup & Power Operation,Control Rods Had No Indications at Identified Positions.Caused by Failure of Control Rod Position Indication Probe Connectors + (ML20078A887)
- ML20078A896 + (ML20078A896)
- 05000325/LER-1983-040-01, /01T-0:on 830904,during Performance of RCIC Steam Line High D/P Channel Calibr & Functional Test,Hpci Sys Isolated.Caused by Test Procedure Error.Procedure Revised + (ML20078A900)
- ML20078A923 + (ML20078A923)
- 05000324/LER-1983-083-01, /01T-0:on 830905,supply Valve 2-FP-V39 to Deluge Sys of Both Standby Gas Treatment Sys Found Shut. Auxiliary Operator Assigned to Hang Tag on 2-PWT-V5 Mistakenly Closed & Tagged 2-FP-V39 + (ML20078A925)
- ML20078A931 + (ML20078A931)
- 05000416/LER-1983-125-01, /01T-0:on 830903,overload Protection Devices for Three Isolation Valves Failed.Caused by Valve Wiring Not Being Terminated Per Design Documents.Deficiencies Corrected + (ML20078A933)
- ML20078A944 + (ML20078A944)
- ML20078A946 + (ML20078A946)
- ML20078A947 + (ML20078A947)
- ML20078A948 + (ML20078A948)
- HL-4694, Forwards Revised Physical Security Plan.Plan Withheld Per 10CFR73.71 + (ML20078A958)
- 05000302/LER-1994-008, :on 941011,inattention to Detail Caused Incompleted Surveillance Test within Designated Time Period & Resulted in Violation of Ts.Conducted Presentation on Attention to Detail,Communication & Teamwork + (ML20078A959)
- ML20078A960 + (ML20078A960)
- ML20078B039 + (ML20078B039)
- ML20078B073 + (ML20078B073)
- ML20078B078 + (ML20078B078)
- ULNRC-03131, Informs That Util Will Implement Current Order Timing Mod & Current Order Surveillance Test,As Described in Listed WOG Documents During Refuel 7 (Mar-May 1995) in Response to NRC 941215 RAI Re GL 93-04 + (ML20078B082)
- ML20078B085 + (ML20078B085)
- ML20078B098 + (ML20078B098)
- ML20078B103 + (ML20078B103)
- 05000302/LER-1994-014, :on 941031,determined That RB Fan/Cooler Operation Develops Cooling Sys Flow Imbalance Due to Personnel Error.Design Basis Configuration Document Will Be Revised + (ML20078B136)
- ML20078B139 + (ML20078B139)
- ML20078B150 + (ML20078B150)
- ML20078B153 + (ML20078B153)
- ML20078B154 + (ML20078B154)
- ML20078B155 + (ML20078B155)
- NRC-95-0002, Forwards 940707 Internal DE Memo Re Facility Turbine Generator Event of 931225,at Request of T Colburn. Understands That Reason Memo Requested Was Because Memo Discussed Info About Shaft Bow + (ML20078B169)
- GO2-83-815, Final Deficiency Rept 251 Re Limitorque Motor Operators W/ Motors from Baldor Electric Co Unqualified Per IEEE 382-1972.Initially Reported on 830422.Limitorque Will Replace Motors W/Units That Meet NUREG-0588 Requirements + (ML20078B170)
- ML20078B195 + (ML20078B195)
- ML20078B202 + (ML20078B202)
- 05000354/LER-1994-013-01, :on 940915,control Room Shift Manning Requirements of TS 6.2.2.a Were Not Met.Caused by Personnel Error.Administrative Procedure Revised & Operators Trained + (ML20078B204)
- 3F1094-02, Forwards Crystal River Unit 3 Operational Safeguards Response Evaluation Rept.Rept Withheld + (ML20078B235)
- ML20078B244 + (ML20078B244)
- HL-4716, Submits Proposed Operator Licensing Examination Schedule for FY95-98 + (ML20078B271)
- 05000457/LER-1994-006-09, :on 940920,chemical & Volume Control Sys Snubber Was Removed in Order to Work on Adjacent Containment Spray Valve.Caused by Programmatic Deficiency. Work Control Procedure Will Be Revised + (ML20078B276)
- BSEP-95-0012, Forwards Nonproprietary Version of Brunswick Steam Electric Plant,Unit 1 Feedwater Nozzle Fracture Mechanics Analysis, NEDC-30634,Rev 1.Requests That Copies of Document Originally Submitted by Util Be Destroyed + (ML20078B300)
- ML20078B304 + (ML20078B304)
- ML20078B307 + (ML20078B307)
- 05000325/LER-1994-012-01, :on 940922,declared HPCI Inoperable Due to Failure of Lube Oil Cooling Water Supply Valve Control Power Fuse.Caused by Inadequate self-checking & Job Scope Walkdown.Disciplined Involved Workers + (ML20078B310)
- 05000454/LER-1994-014-04, :on 940915,declared DG Inoperable in Mode 5 Due to Misinterpretation of TS Requirements.Revised Procedures & Electronic Work Control Sys + (ML20078B312)
- ML20078B321 + (ML20078B321)
- NRC-94-0095, Confirms All Actions in Response to NRC Bulletin 93-002, Suppl 1 Completed + (ML20078B322)