Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20077G930 + (ML20077G930)
- ML20077G931 + (ML20077G931)
- RBG-35251, Application for Amend to License NPF-47,revising Test Frequency Requirements for Diesel Generators Identified in Tech Spec 3/4.8.1.1 + (ML20077G933)
- ML20077G935 + (ML20077G935)
- ML20077G938 + (ML20077G938)
- ML20077G949 + (ML20077G949)
- L-83-387, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/83-09 & 50-251/83-09.Corrective Actions: Training Dept Will Review Requirements Re Resetting Horn Disable Light W/Licensed Operators + (ML20077G958)
- ML20077G960 + (ML20077G960)
- ML20077G962 + (ML20077G962)
- ML20077G963 + (ML20077G963)
- L-83-411, Informs That Util Completed Balance of Actions Requested in Action Item 4 of IE Bulletin 82-02 Re Maint Procedures for Threaded Fasteners + (ML20077G964)
- RBG-15-547, Interim Deficiency Rept DR-118 Re Insufficient Penetration of Welds for Platform Channels on Primary Shield Wall.Addl QA Info Needed to Complete Evaluation.Interim or Final Rept Will Be Provided by 830914 + (ML20077G965)
- BVY-91-062, Forwards Suppl to Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters,1990,Including Annual Radiological Impact on Man for 1990 + (ML20077G972)
- ML20077G974 + (ML20077G974)
- ML20077G976 + (ML20077G976)
- 2CAN069116, Forwards Arkansas Nuclear One,Unit II Reactor Containment Integrated Leakage Rate Test. Test Performed During Eighth Refueling Outage + (ML20077G978)
- ML20077G980 + (ML20077G980)
- ML20077G986 + (ML20077G986)
- ML20077G989 + (ML20077G989)
- ML20077G990 + (ML20077G990)
- ML20077G994 + (ML20077G994)
- ML20077G995 + (ML20077G995)
- ML20077G997 + (ML20077G997)
- ML20077G999 + (ML20077G999)
- ML20077H001 + (ML20077H001)
- SNRC-1815, Requests limited-scope Exemption from Operator License Requirements of 10CFR55 & Interim Relief Pending Disposition of Exemption + (ML20077H003)
- ML20077H005 + (ML20077H005)
- ML20077H009 + (ML20077H009)
- ML20077H014 + (ML20077H014)
- ML20077H016 + (ML20077H016)
- ML20077H021 + (ML20077H021)
- ML20077H022 + (ML20077H022)
- ML20077H026 + (ML20077H026)
- ML20077H027 + (ML20077H027)
- ML20077H031 + (ML20077H031)
- ML20077H035 + (ML20077H035)
- ML20077H037 + (ML20077H037)
- ML20077H038 + (ML20077H038)
- ML20077H039 + (ML20077H039)
- ML20077H042 + (ML20077H042)
- ML20077H059 + (ML20077H059)
- ML20077H060 + (ML20077H060)
- ML20077H061 + (ML20077H061)
- ML20077H065 + (ML20077H065)
- ML20077H068 + (ML20077H068)
- ML20077H069 + (ML20077H069)
- 1CAN069104, Application for Amend to License DPR-51,replacing Existing Footnote in Tech Spec 3.8.15 to Allow Spent Fuel Cask to Be Handled by Auxiliary Bldg Crane for Period 911015-920131 for Shipment of Two Spent Fuel Rods Utilizing 17-ton Cask + (ML20077H070)
- ML20077H072 + (ML20077H072)
- RBG-15-572, Interim Deficiency Rept DR-119 Re Failure of Threaded Weld Studs During Const of Cable Tray Supports.Initially Reported on 830517.Results of Addl QA Evaluation by Ae Pending.Next Rept by 830907 + (ML20077H073)
- ML20077H074 + (ML20077H074)
- L-83-407, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/83-16 & 50-251/83-16.Corrective Actions:Spent Fuel Pit Bridge Crane Operating Instructions & Periodic Test Procedures Revised + (ML20077H075)