Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072G558 + (ML20072G558)
- ML20072G559 + (ML20072G559)
- ML20072G561 + (ML20072G561)
- ML20072G565 + (ML20072G565)
- ML20072G568 + (ML20072G568)
- ML20072G569 + (ML20072G569)
- ML20072G577 + (ML20072G577)
- ML20072G581 + (ML20072G581)
- ML20072G590 + (ML20072G590)
- 05000461/LER-1994-006, :on 940607,emergency DG Was Not Loaded to at Least 3869 Kw as Required by TS During Tests.Caused by Personnel Error.Replaced Optical Isolator Power Supply & Calibrated Optical Isolator Loop + (ML20072G607)
- ML20072G614 + (ML20072G614)
- ML20072G615 + (ML20072G615)
- 05000338/LER-1983-033-03, /03L-0:on 830523,w/Unit 2 in Mode 5,pressurizer PORV PCV-2455c Lifted Three Times to Mitigate RCS Pressure Transient Caused by Inadvertent SI Actuation.Caused by Inadequate Instrumentation Procedures + (ML20072G616)
- ML20072G617 + (ML20072G617)
- ML20072G623 + (ML20072G623)
- 05000498/LER-1994-010, :on 940719,Unit 1 Failed to Fully Meet Surveillance Requirements of TS 4.7.4, Essential Cooling Water Sys. Caused by Misuse of Equipment Procedures. Revised Procedure Was re-performed for Unit 1 + (ML20072G624)
- ML20072G625 + (ML20072G625)
- ML20072G629 + (ML20072G629)
- TXX-3688, Forwards Annual Financial Repts 1982 + (ML20072G634)
- ML20072G639 + (ML20072G639)
- ML20072G642 + (ML20072G642)
- ML20072G643 + (ML20072G643)
- ML20072G649 + (ML20072G649)
- ML20072G658 + (ML20072G658)
- 0CAN028303, Submits First Monthly Progress Rept on Regulatory Response & Commitment Control Program.Interim Guidelines Implemented. Next Status Rept Scheduled for 830314 + (ML20072G659)
- 05000362/LER-1983-006, Forwards LER 83-006/01T-0 + (ML20072G665)
- ML20072G666 + (ML20072G666)
- ML20072G671 + (ML20072G671)
- ML20072G674 + (ML20072G674)
- ML20072G678 + (ML20072G678)
- 05000331/LER-1994-011, :on 940718,recognized That Surveillance Test Requirement to Demonstrate Operability of a Channel RBM Had Not Been Performed.Caused by Personnel Error.Faulty Rod Select Switch in RMCS Was Replaced + (ML20072G679)
- ML20072G680 + (ML20072G680)
- ML20072G686 + (ML20072G686)
- ML20072G689 + (ML20072G689)
- ML20072G694 + (ML20072G694)
- ML20072G697 + (ML20072G697)
- L-94-062, Forwards Description of Work Activities That Will Occur in Central & Secondary Alarm Stations & Submitted in Accordance w/10CFR50.54(P) + (ML20072G702)
- ML20072G708 + (ML20072G708)
- ML20072G710 + (ML20072G710)
- ML20072G712 + (ML20072G712)
- ML20072G713 + (ML20072G713)
- ML20072G718 + (ML20072G718)
- RC-94-0215, Requests Meeting W/Nrc on 940929 to Discuss Implementation of Instrumentation Calibr Monitoring Program for Plant + (ML20072G724)
- B14899, Provides Addl Info Re Proposed Rev to TS of Millstone Unit 2.Proposed Changes Would Allow Millstone Unit 2 to Take Advantage of re-evaluation of Design of 125 Volt Dc Sys + (ML20072G735)
- ML20072G748 + (ML20072G748)
- ML20072G749 + (ML20072G749)
- ML20072G767 + (ML20072G767)
- B14930, Proposed Tech Specs Increasing Time That RHR Pump May Be out-of-svc Before Plant Shutdown Is Required to Be Initiated + (ML20072G768)
- ML20072G785 + (ML20072G785)
- ST-HL-AE-4860, Forwards STP Unit 2 Cycle 4 Startup Testing Summary Rept, Per TS 6.9.1.1.During Recent Cycle 3 to Cycle 4 Refueling outage,56 Feed Fuel Assemblies W/Integral Fuel Burnable Absorbers Installed + (ML20072G789)
- ML20072G791 + (ML20072G791)