Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20071F917 + (ML20071F917)
- 05000285/LER-1978-036, Forwards LER 78-036/03L-0 + (ML20071F923)
- 05000285/LER-1978-036-03, /03L-0 on 781101:auxiliary Feedwater Check Valve FW-164 Found to Be Oriented in Wrong Position.Caused by Missing Valve Disk Plate Which Was Subsequently Located & Recovered + (ML20071F928)
- ML20071F933 + (ML20071F933)
- ML20071F934 + (ML20071F934)
- ML20071F935 + (ML20071F935)
- ML20071F937 + (ML20071F937)
- ML20071F938 + (ML20071F938)
- ML20071F946 + (ML20071F946)
- 05000333/LER-1978-090, Forwards LER 78-090/03L-0 + (ML20071F947)
- ML20071F959 + (ML20071F959)
- ML20071F962 + (ML20071F962)
- ML20071F974 + (ML20071F974)
- ML20071F982 + (ML20071F982)
- ML20071F986 + (ML20071F986)
- ML20071F990 + (ML20071F990)
- ML20071F992 + (ML20071F992)
- ML20071G018 + (ML20071G018)
- ML20071G042 + (ML20071G042)
- ML20071G047 + (ML20071G047)
- ML20071G057 + (ML20071G057)
- ML20071G062 + (ML20071G062)
- 05000285/LER-1978-035, Forwards LER 78-035/03L-0 + (ML20071G064)
- 05000285/LER-1978-035-03, /03L-0 on 781113:during Test of Ventilation Isolation Actuation Signal,Lockout 86B1/VIAS Did Not Trip. Cause Unidentified,Since Relay Retested & Found to Be Operating Normally.Relays Will Continue to Be Tested + (ML20071G070)
- 05000285/LER-1978-037, Forwards LER 78-037/03L-0 + (ML20071G074)
- 05000285/LER-1978-038, Forwards LER 78-038/01T-0 + (ML20071G082)
- 05000285/LER-1978-038-01, /01T-0 on 781127:Diesel Generator 2 Failed to Auto Close Onto the Bus;Breaker Mode Switch Contracts 27-27c Failed to Make Contact.Caused by Contact Failure + (ML20071G085)
- IR 05000285/2019005 + (ML20071G087)
- ML20071G091 + (ML20071G091)
- ML20071G093 + (ML20071G093)
- LD-94-047, Forwards Replacement Page for System 80+ Emergency Operations Guidelines + (ML20071G095)
- ML20071G097 + (ML20071G097)
- ML20071G098 + (ML20071G098)
- 05000285/LER-1978-037-03, /03L-0 on 781116:during Refueling,All Limitorque Valves Were Inspec for Proper Staking of the Lock Nut on the Motor operator.30 of 65 Valves Exhibited Unstaked Lock Nuts.Lock Nuts Were Staked IAW Manufacturers Instructions + (ML20071G101)
- ML20071G108 + (ML20071G108)
- ML20071G113 + (ML20071G113)
- PMNS20200214, Meeting Between the NRC Staff and the Nuclear Energy Institute + (ML20071G118)
- ML20071G122 + (ML20071G122)
- ML20071G124 + (ML20071G124)
- PMNS20200187, Meeting Between the NRC Staff and Westinghouse Electric Company + (ML20071G127)
- ML20071G129 + (ML20071G129)
- ML20071G130 + (ML20071G130)
- 05000333/LER-1978-085, Forwards LER 78-085/04X-1 + (ML20071G132)
- 05000333/LER-1978-085-04, /04X-1 on 781006:3rd Quarter Release of Halogens & Particulates Greater than Tech Specs.Caused by Steam Leaks & Fuel Pin Clad Performance + (ML20071G139)
- ML20071G145 + (ML20071G145)
- ML20071G151 + (ML20071G151)
- ML20071G154 + (ML20071G154)
- ML20071G155 + (ML20071G155)
- ML20071G158 + (ML20071G158)
- RBG-40695, Provides Details Re Statement Contained in Insp Rept 50-458/94-03 Which Describes Some MOV Actions Planned for Refueling Outage (Rf) 5,as Discussed W/Nrc on 940324 (Before Commencement of RF5) + (ML20071G161)
- NRC-94-0057, Requests That Service List for Correspondence Re Fermi 2 Be Revised to Reflect Appointment of LS Goodman to Position of Director - Nuclear Licensing.Remaining Info for Director - Nuclear Licensing Entry on Svc List Unchanged + (ML20071G165)