- 0CAN028301, Application for Amend to Licenses DPR-51 & NPF-6,revising Tech Specs to Change in-core Detector Surveillance Requirements & to Correct Various Typographical,Title & Ref Errors + (ML20071C017)
- ML20071C020 + (ML20071C020)
- 1CAN028305, Discusses Understanding Re 821210 Order for Mod to OL Concerning Inadequate Core Cooling,Per 830127 Meeting W/Nrc. Util 830117 Request for Extension of Deadline for Hearing Requests Will Be Withdrawn.Nrc Confirmation Requested + (ML20071C021)
- ML20071C024 + (ML20071C024)
- ML20071C025 + (ML20071C025)
- ML20071C031 + (ML20071C031)
- ML20071C034 + (ML20071C034)
- ML20071C035 + (ML20071C035)
- ML20071C039 + (ML20071C039)
- 05000338/LER-1983-004, Forwards LER 83-004/03L-0 + (ML20071C042)
- ML20071C048 + (ML20071C048)
- 05000338/LER-1983-004-03, /03L-0:on 830125,svc Water Supply Valves MOV-SW- 103B & C & Discharge Valve MOV-SW-104C to Recirculation Spray HXs Would Not Open.Caused by Problems in Valve Operators.Valves Removed & Cleaned + (ML20071C055)
- 05000271/LER-1983-004, Forwards LER 83-004/03L-0 + (ML20071C057)
- ML20071C059 + (ML20071C059)
- ML20071C060 + (ML20071C060)
- ML20071C066 + (ML20071C066)
- 05000271/LER-1983-004-03, /03L-0:on 830120,flowmeter on Containment Air Monitor Read Zero Due to Leakage Past Detector O-ring Seal Into Reactor Bldg.Cause Not determined.O-ring Reseated + (ML20071C069)
- ML20071C073 + (ML20071C073)
- 05000280/LER-1983-003, Forwards LER 83-003/01T-0 + (ML20071C075)
- 05000244/LER-1983-007, Forwards LER 83-007/03L-0 + (ML20071C079)
- ML20071C087 + (ML20071C087)
- 05000280/LER-1983-003-01, /01T-0:on 830209,MOV-SW-103A,B,C & D & MOV-SW-203A,C & D Failed to Open Upon Demand from Control Room.Caused by Corrosion on Motors of MOV-SW-103C & 203C & Torque Switch of 103B.Valves Repaired + (ML20071C089)
- 05000244/LER-1983-007-03, /03L-0:on 830117,water Level in Pressurizer Dropped Below 12% Level.Caused by RCS Cooldown Following Trip.Level Returned to 19.5% within 15 Minutes + (ML20071C090)
- AECM-83-037, Informs That Discharge Basin Automated Sample Gathering Sys Failed to Operate Properly When Energized.Failed Sys Under Investigation.Operability Expected Prior to Next Reactor Criticality + (ML20071C094)
- 05000244/LER-1983-009, Forwards LER 83-009/03L-0 + (ML20071C102)
- AECM-83-019, Submits Corrected Copy of Response to NRC Ltr Re Violations Noted in IE Insp Rept 50-416/82-53.Corrective Actions: Automated Sample Gathering Sys Installed & Expected to Be Tested & Operational by 830201 + (ML20071C105)
- 05000244/LER-1983-009-03, /03L-0:on 830119,boric Acid Transfer Pump B Tripped Immediately After Start.Caused by Failed Control Power Fuses.Fuses Replaced + (ML20071C112)
- ML20071C114 + (ML20071C114)
- AECM-82-562, Responds to NRC Re Violations Noted in IE Insp Rept 50-416/82-53.Corrective Actions:Util Believes No Violation Existed & 8 H Sample Collection Frequency Justified & Conservative + (ML20071C116)
- ML20071C119 + (ML20071C119)
- ML20071C124 + (ML20071C124)
- W3P83-0502, Responds to Re Seismic Qualification of Equipment.No Containment Structure Mounted Equipment Qualified by Single Frequency Method + (ML20071C127)
- ML20071C133 + (ML20071C133)
- ML20071C134 + (ML20071C134)
- ML20071C139 + (ML20071C139)
- 05000324/LER-1983-012, Forwards LER 83-012/03L-0 + (ML20071C146)
- ML20071C149 + (ML20071C149)
- 2CAN028305, Forwards INPO Assessment of Regulatory Response & Commitment Control Program,In Response to & Order to Satisfy Requirement of Article IV of Order + (ML20071C151)
- ML20071C152 + (ML20071C152)
- 05000324/LER-1983-012-03, /03L-0:on 830121,surveillance Revealed Control Air Pressure of Diesel Generator 3 Below Tech Spec Limit.Caused by Crud Accumulation in Diesel Control Air Moisture Drain Trap Filter.Filter Replaced + (ML20071C155)
- AECM-83-436, Responds to NRC Re Violations Noted in IE Insp Rept 50-416/82-67.Corrective Actions:Procedures & FSAR Re Verification of Trip Setpoints Revised & Surveillance Review Program Established + (ML20071C157)
- ML20071C161 + (ML20071C161)
- ML20071C164 + (ML20071C164)
- ML20071C172 + (ML20071C172)
- ML20071C174 + (ML20071C174)
- ML20071C177 + (ML20071C177)
- ML20071C183 + (ML20071C183)
- ML20071C185 + (ML20071C185)
- ML20071C187 + (ML20071C187)
- 05000318/LER-1983-007, Followup LER 83-007/01T-0:on 830203,de-energization of Reactor Protection Sys (RPS) Channels Caused PORV & Pressurizer Quench Tank Rupture Disk to Open.Caused by Blown Fuse in RPS Channel a Due to Crossed Leads in Inverter 21 + (ML20071C188)
- AECM-83-0092, Advises That Rev to Plant Administrative Procedure 01-S-06-1 Will Be Issued by 830310.Submittal Responds to Violation Noted in IE Insp Rept 50-416/82-76 + (ML20071C194)