Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069G961 + (ML20069G961)
- ML20069G963 + (ML20069G963)
- ML20069G964 + (ML20069G964)
- ML20069G965 + (ML20069G965)
- 05000338/LER-1982-061-03, /03L-0:on 820917,during Chemistry Log Review, Specific Activity of Primary Coolant Exceeded Tech Specs. Caused by Migration of I-131 Through Pinhole Leaks in Fuel Cladding.Specific Activity Returned to Acceptable Limits + (ML20069G975)
- ML20069G976 + (ML20069G976)
- 05000315/LER-1982-084, Forwards LER 82-084/04L-0 + (ML20069G981)
- 05000315/LER-1982-084-04, /04L-0:on 820912,unplanned Gas Release Detected by Elevated Vent Stack Gaseous Monitor.Caused by Leak on Waste Gas Oxygen Analyzer.Leak Repaired + (ML20069G991)
- 05000373/LER-1982-103, Forwards LER 82-103/03L-0 + (ML20069H000)
- ML20069H002 + (ML20069H002)
- ML20069H005 + (ML20069H005)
- 05000373/LER-1982-103-03, /03L-0:on 820919,Hi Rad Alarm Sounded.Operator Checked Chart Recorder & Noticed a RHR Svc Water Radiation Monitor Read Downscale.Alarm Caused by Trip in Power Supply to Monitor.Power Supply Reset + (ML20069H007)
- ML20069H013 + (ML20069H013)
- ML20069H019 + (ML20069H019)
- ML20069H023 + (ML20069H023)
- ML20069H025 + (ML20069H025)
- ML20069H027 + (ML20069H027)
- RBG-14-482, Suppls 811002 Response to IE Bulletin 80-16, Potential Misapplication of Rosemount,Inc Models 1151 & 1152 Pressure Transmitters W/Either a or D Output Codes. Final Rept to Be Submitted 830503,subj to GE Evaluation Completion + (ML20069H029)
- ML20069H030 + (ML20069H030)
- ML20069H031 + (ML20069H031)
- 05000305/LER-1982-029-01, /01X-1:on 820927,discovered That Monthly Testing Requirements Exceeded for Containment Radiation Monitors R-11 & R-12.Caused by Postponement of Test Due to Backup Radiation Monitor Being Out of Svc & Personnel Oversight + (ML20069H034)
- 05000305/LER-1982-031-03, /03L-0:on 820913,train 1B of Shield Bldg Vent Failed to Switch to Recirculation Mode After Drawing Vacuum. Recirculation Damper Failed to Open Due to Broken Hydraulic Pump on electro-hydraulic Damper Actuator.Operator Replac + (ML20069H036)
- ML20069H038 + (ML20069H038)
- ML20069H039 + (ML20069H039)
- ML20069H040 + (ML20069H040)
- 05000346/LER-1979-076, Forwards Revised LER 79-076/03X-1 + (ML20069H042)
- ML20069H043 + (ML20069H043)
- ML20069H044 + (ML20069H044)
- 05000346/LER-1979-076-03, Core Flood Tank 1-1 Level Alarm Received.Caused by Faulty Amplifier in Level Transmitter LT-CF3B2,resulting in Incorrect Reading. Amplifier Replaced & Transmitter Recalibr + (ML20069H046)
- ML20069H059 + (ML20069H059)
- ML20069H065 + (ML20069H065)
- ML20069H068 + (ML20069H068)
- ML20069H070 + (ML20069H070)
- 05000267/LER-1983-007, Forwards RO 83-007 & LER 83-007/03L-0 + (ML20069H073)
- ML20069H074 + (ML20069H074)
- ML20069H075 + (ML20069H075)
- ML20069H081 + (ML20069H081)
- ML20069H082 + (ML20069H082)
- ML20069H086 + (ML20069H086)
- ML20069H089 + (ML20069H089)
- L-82-441, Forwards Revision 1 to 10CFR50,App R Fire Protection Review, Correcting Typographical & Editorial Errors + (ML20069H095)
- ML20069H100 + (ML20069H100)
- RBG-40628, Forwards Rev 11 to Emergency Plan,Incorporating Changes Required by EPA-400-R-92-001 Manual & New 10CFR20 Changes. Clarity of Emergency Plan Also Improved + (ML20069H104)
- ML20069H106 + (ML20069H106)
- ML20069H114 + (ML20069H114)
- 05000267/LER-1983-006, Forwards LER 83-006/03L-0.Detailed Event Analysis Encl + (ML20069H118)
- 05000327/LER-1982-117, Forwards LER 82-117/03L-0 + (ML20069H122)
- U-602299, Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram + (ML20069H125)
- ML20069H128 + (ML20069H128)
- RBG-14-645, Interim Deficiency Rept Dr 98 Re Potential Failure of SBM Control Switches Mfg by Ge.Initially Reported on 830217. Investigation Incomplete.Interim or Final Rept Will Be Submitted by 830624 + (ML20069H131)
- 05000267/LER-1983-007-03, /03L-0:on 830215,instrument Power Invertor 1B Failed.Caused by Blown 150 Amp Fuse.Reactor Manually Scrammed,Instrument Bus 2 re-energized & Fuse Replaced + (ML20069H134)