Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069C948 + (ML20069C948)
- 05000324/LER-1981-022-03, Primary Containment Atmospheric Control Suppression Pool Level Indicator, 2-CAC-LI-2601-3,gave Erratic Indication Level.Caused by Blockage in Water Supply Throttle Valve + (ML20069C955)
- ML20069C982 + (ML20069C982)
- ML20069C997 + (ML20069C997)
- ML20069D002 + (ML20069D002)
- ML20069D005 + (ML20069D005)
- ML20069D007 + (ML20069D007)
- ML20069D008 + (ML20069D008)
- ML20069D009 + (ML20069D009)
- ML20069D013 + (ML20069D013)
- ML20069D014 + (ML20069D014)
- ML20069D017 + (ML20069D017)
- ML20069D026 + (ML20069D026)
- 05000395/LER-1983-013, Forwards LER 83-013/03L-0.Detailed Event Analysis Encl + (ML20069D027)
- NRC-94-4114, Forwards Prorpietary & Nonproprietary Addl Info in Support of Westinghouse Response to RAI 952.44-952-46.Proprietary Info Withheld (Ref 10CFR9.17(a)(4)) + (ML20069D036)
- 05000324/LER-1983-021-03, /03L-0:on 830301,HPCI Sys Declared Inoperable When Instrument 2E41-dPIS-N005 Showed Negative Indication While Redundant Instrument 2E41-dPIS-N004 Indicated Zero.Caused by Instrument drift.N005 Calibr & Returned to Svc + (ML20069D038)
- ML20069D042 + (ML20069D042)
- 05000395/LER-1983-013-03, /03L-0:on 830113 & 19,condensate Storage Tank Level Transmitters LT-3631 & LT-3631A Failed Due to Frozen Instrument Lines.Caused by Temp Sensing Element Not Being Located Per Design Specs.Element Relocated + (ML20069D045)
- ML20069D049 + (ML20069D049)
- ML20069D053 + (ML20069D053)
- 05000395/LER-1983-012, Forwards LER 83-012/03L-0.Detailed Event Analysis Encl + (ML20069D054)
- ML20069D055 + (ML20069D055)
- ML20069D057 + (ML20069D057)
- ST-HL-AE-4798, Responds to NRC Re Violation Noted in Insp Rept 50-498/94-09 Re Separation Betweeen Scaffolding & Equipment. Corrective Actions:Scaffold Cross Member Touching Essential Cooling Water Pump 1A Discharge Piping Adjusted + (ML20069D058)
- 05000395/LER-1983-012-03, /03L-0:on 830210,flow Indicator for Steam Generator a Feedwater Flow FI-477 Failed Low.Caused by Failure of Power Supply FQY-477.Circuit Board Replaced + (ML20069D068)
- 3F0594-15, Responds to NRC Re Violations Noted in Insp Rept 50-302/93-16.Corrective Action:Developing an Operations Study Book Entry + (ML20069D072)
- ML20069D075 + (ML20069D075)
- ML20069D076 + (ML20069D076)
- ML20069D087 + (ML20069D087)
- ML20069D096 + (ML20069D096)
- ML20069D097 + (ML20069D097)
- ML20069D099 + (ML20069D099)
- 05000302/LER-1983-007, Forwards LER 83-007/03L-0 + (ML20069D100)
- 05000395/LER-1983-011, Forwards LER 83-011/03L-0.Detailed Event Analyis Encl + (ML20069D114)
- 05000302/LER-1983-007-03, /03L-0:on 830209,reactor Bldg Pressure Indicator Discovered Inoperable.Caused by Instrument Drift.Transmitter Recalibr.Pressure Transmitters Will Be Replaced During Next Refueling Outage + (ML20069D117)
- 05000333/LER-1993-019, :on 930923,potential Design Inadequacies in Control Room Ventilation Sys Occurred.Caused by Inadequate Design Control & Documentation by Engineering Organizations. CRV Placed in Isolate Mode of Operation + (ML20069D118)
- ML20069D120 + (ML20069D120)
- 05000361/LER-1983-017, Forwards LER 83-017/03L-0 + (ML20069D122)
- ML20069D126 + (ML20069D126)
- 05000395/LER-1983-011-03, /03L-0:on 830208 & 17,during Mode 1 Operation, Nuclear Sampling Sys Valves 9398 A,B & C Failed to Close. Caused by Limit Switch Failure on One Valve & Crud Buildup on Other Valve Seats.Crud Dislodged.Limit Switches Repaired + (ML20069D127)
- 05000361/LER-1983-017-03, /03L-0:on 830124,exam Confirmed Continuing Alarms on Containment High Range Radiation Monitor RI-7820 Were Defeating Function.Caused by 2 R/Hr Setpoint Being Too Close to Normal Reading.Tech Spec Amend to Be Submitted + (ML20069D133)
- LD-94-038, Informs That Vendor Providing Detailed Markup of Draft Document Entitled, Certified Design Matl/Itaac Review Guidance to Nei,In Response to NRC + (ML20069D134)
- PLA-7847, Submittal of Revised Topical Report to Support License Amendment Requesting Application of Advanced Framatome Methodologies + (ML20069D135)
- LD-94-037, Amends ,Informing NRC of Change in Organizational Alignment of ABB C-E Nuclear Fuels,Which Has Become Part of ABB C-E Nuclear Operations.Figure II-2 of CENPD-210,Rev 7A, Outlining New Organization Encl + (ML20069D136)
- ML20069D137 + (ML20069D137)
- ML20069D142 + (ML20069D142)
- ML20069D143 + (ML20069D143)
- ML20069D144 + (ML20069D144)
- 05000416/LER-1983-055, Forwards LER 83-055/03L-0 + (ML20069D145)
- 2CAN059406, Forwards Response to Violations Noted in Insp Repts 50-313/94-03 & 50-368/94-03.Corrective Actions:Review Conducted for Relay Work Order Planning Phase,Authorized for Work & Scheduled to Work + (ML20069D146)
- ML20069D148 + (ML20069D148)