Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20067B717 + (ML20067B717)
- GO2-82-945, Interim Deficiency Rept Re Controls for Remote Shutdown Panel & Pump Discharge Switch.Initially Reported on 820819 & 0820,respectively.Switches & Valves Will Be Relocated.Next Rept Will Be Submitted on 830228 + (ML20067B718)
- ML20067B721 + (ML20067B721)
- ML20067B723 + (ML20067B723)
- 05000333/LER-1982-049, Forwards LER 82-049/03L-0 + (ML20067B724)
- ML20067B729 + (ML20067B729)
- 05000333/LER-1982-049-03, /03L-0:on 821027,during Tech Spec Surveillance Requirement Review,Scram Discharge Vol Vents & Drains Not Cycled on Quarterly Basis.Caused by Supervisory Personnel Error.Addl Surveillance Procedure Developed + (ML20067B737)
- ML20067B741 + (ML20067B741)
- 05000272/LER-1982-083-03, /03L-0:on 821102,during Routine Shutdown Operation,Temp Recorder for Air temp-delta T Channels Was Not Printing.Caused by Failure of Pinion Gear on Chart Drive Motor.Motor Replaced + (ML20067B743)
- ML20067B746 + (ML20067B746)
- 05000317/LER-1982-065, Forwards LER 82-065/03L-0 + (ML20067B753)
- 05000272/LER-1982-085, Forwards LER 82-085/01T-0.Detailed Event Analysis Encl + (ML20067B757)
- 05000317/LER-1982-065-03, /03L-0:on 821025,electrical Bus Supplying Power to Containment Atmosphere Particulate & Gaseous Radioactivity Monitoring Sys de-energized.Caused by Ground on Tendon Insp Platform Power Cable,Induced by High Winds + (ML20067B765)
- 05000272/LER-1982-085-01, /01T-0:on 821113,due to Resulting Loss of F & G Group Buses,Automatic Starting Feature of 1 & 2 Diesel Fire Pumps Disabled.Caused by Planned Maint on Station Power Transformer 12.Maint Completed & Power Restored + (ML20067B774)
- 05000272/LER-1982-086, Forwards LER 82-086/03L-0.Detailed Event Analysis Encl + (ML20067B778)
- ML20067B779 + (ML20067B779)
- 05000272/LER-1982-086-03, /03L-0:on 821027,five Fire Barrier Penetrations Found non-functional During Routine Surveillance.Caused by Inadequate Sealing.Original Surveillance Procedure Failed to Specifically Identify Penetrations.Procedure Revised + (ML20067B783)
- ML20067B801 + (ML20067B801)
- ML20067B809 + (ML20067B809)
- ML20067B813 + (ML20067B813)
- 0CAN118223, Requests Extension to 830228 for Submittal of App I Revisions + (ML20067B816)
- ML20067B831 + (ML20067B831)
- ML20067B834 + (ML20067B834)
- ML20067B836 + (ML20067B836)
- ML20067B848 + (ML20067B848)
- 3F0294-13, Revises Commitment Communicated in Re Requalification Training for Fire Brigade Members + (ML20067B849)
- ML20067B851 + (ML20067B851)
- ML20067B856 + (ML20067B856)
- ML20067B875 + (ML20067B875)
- NLS9100066, Forwards Addl Info Re Station Blackout,Including Site Specific Weather Calculation & Control Room Temp Rise Calculation,Per NRC 910116 Telcon + (ML20067B881)
- ML20067B883 + (ML20067B883)
- ML20067B887 + (ML20067B887)
- ML20067B890 + (ML20067B890)
- ML20067B893 + (ML20067B893)
- ML20067B909 + (ML20067B909)
- ML20067B912 + (ML20067B912)
- ML20067B932 + (ML20067B932)
- ML20067B937 + (ML20067B937)
- ML20067B946 + (ML20067B946)
- ML20067B968 + (ML20067B968)
- ML20067B971 + (ML20067B971)
- ML20067B975 + (ML20067B975)
- ML20067B977 + (ML20067B977)
- BECO-94-016, Confirms Verbal Approval to Utilize Modified Firewater Sys (Untreated Plymouth Town Water) at Plant for Sea Foam Suppression & Suppl Screenwash Flow During Storm Periods + (ML20067B993)
- ML20067B997 + (ML20067B997)
- ML20067C003 + (ML20067C003)
- ML20067C005 + (ML20067C005)
- ML20067C007 + (ML20067C007)
- ML20067C008 + (ML20067C008)
- ML20067C013 + (ML20067C013)
- ML20067C014 + (ML20067C014)