Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20066G769 + (ML20066G769)
- 05000334/LER-1982-047, Forwards LER 82-047/03L-0 + (ML20066G771)
- ML20066G775 + (ML20066G775)
- ML20066G776 + (ML20066G776)
- ML20066G778 + (ML20066G778)
- TXX-3590, Discusses Intention to Perform Reactor Vessel Insp Per Westinghouse Contract W/O Implementation of Reg Guide 1.150 During Latter Part of First Quarter 1983 + (ML20066G779)
- 05000334/LER-1982-047-03, /03L-0:on 821013,pressurizer Level Channel I Indicator LI-RC-459 Recorded to Be Out of 4% Tolerance Band. Caused by Leaking Instrument Valve Resulting in Loss of Level in Ref Leg of LT-RC-459.Valve Internals Replaced + (ML20066G782)
- ML20066G790 + (ML20066G790)
- ML20066G795 + (ML20066G795)
- L-82-507, Interim Deficiency Rept 82-021 Re Incorrect RPS Low Flow Input Signals.Initially Reported on 821013.Problem Still Being Reviewed.Final Rept Will Be Provided by 821212 + (ML20066G797)
- ML20066G800 + (ML20066G800)
- ML20066G805 + (ML20066G805)
- ML20066G807 + (ML20066G807)
- ML20066G808 + (ML20066G808)
- ML20066G809 + (ML20066G809)
- ML20066G811 + (ML20066G811)
- ML20066G814 + (ML20066G814)
- ML20066G816 + (ML20066G816)
- ML20066G818 + (ML20066G818)
- ML20066G820 + (ML20066G820)
- ML20066G821 + (ML20066G821)
- ML20066G822 + (ML20066G822)
- ML20066G824 + (ML20066G824)
- ML20066G826 + (ML20066G826)
- ML20066G828 + (ML20066G828)
- 05000374/LER-1990-014-06, :on 901222,smoke Discovered Coming from Front Area of turbine-driven Reactor Feedwater Pump.Caused by Oil Leak on Insulation.Pump Taken off-line for Repair & Vibration Probe Flange Machined + (ML20066G839)
- ML20066G842 + (ML20066G842)
- JAFP-82-0981, Responds to NRC Re Violations Noted in IE Insp Rept 50-333/82-13.Corrective Actions:Work Halted,Whole Body Counts Taken,Mpc Hours Calculated & Recorded,Personnel Briefed & Followup Pair Samples Taken + (ML20066G846)
- ML20066G848 + (ML20066G848)
- ML20066G853 + (ML20066G853)
- 05000219/LER-1982-047-03, /03L-0:on 821004,loss of Power to Reactor Protection Sys Motor Generator Set 1 Caused Half Scram. Caused by Burned & Scarred Relay Contacts.Relay Replaced & Sys Returned to Svc.Spare Relays on Order + (ML20066G854)
- ML20066G857 + (ML20066G857)
- 05000328/LER-1982-122, Forwards LER 82-122/03L-0 + (ML20066G861)
- ML20066G867 + (ML20066G867)
- 05000328/LER-1982-122-03, /03L-0:on 821021,during Mode 1 Operation, Pressurizer Pressure Channel 2-PS-68-323B Declared Defective Due to Loss of Ac Power to Channel.Caused by Defective Fuse Holder Cap.Cap Replaced & Channel Returned to Svc + (ML20066G869)
- ML20066G879 + (ML20066G879)
- 1CAN029111, Monthly Operating Rept for Jan 1991 for Arkansas Nuclear One Unit 1 + (ML20066G880)
- 05000366/LER-1982-117, Forwards LER 82-117/03L-0 + (ML20066G881)
- ML20066G884 + (ML20066G884)
- ML20066G890 + (ML20066G890)
- 05000277/LER-1982-037-03, /03L-0:on 821012,control Rod Drive Area Smoke Detector Circuit Set Off False Alarm.Caused by Stripped Terminal Screw in Auto Code Box & Loose Connection from Circuitry.Screw Replaced & Connection Tightened + (ML20066G891)
- ML20066G893 + (ML20066G893)
- ML20066G896 + (ML20066G896)
- 05000366/LER-1982-117-03, /03L-0:on 821017,instrument a of Channel a Did Not Trip at Greater than or Equal to 100 Psig During Ft&C Procedure.Caused by Setpoint Drift in Core Spray Pump Discharge Pressure Instrument.Instrument Calibr + (ML20066G897)
- ML20066G900 + (ML20066G900)
- ST-HL-AE-3692, Monthly Operating Repts for Jan 1991 for South Texas Project Electric Generating Station Units 1 & 2 + (ML20066G901)
- ML20066G904 + (ML20066G904)
- ND-20-0204, Enclosure 1 - Vogtle Electric Generating Plant (VEGP) Unit 4, Exemption Request 10 CFR Part 50, Appendix E Exercise Requirements + (ML20066G906)
- ELV-02388, Application for Amends to Licenses NPF-68 & NPF-81,revising Tech Spec 6.4.1.2.Amend Revises Composition of Plant Review Board by Adding Technical Support Dept in Place of Quality Control & Nuclear Safety & Compliance Depts + (ML20066G907)
- NG-82-2348, Responds to NRC Re Violations Noted in IE Insp Rept 50-331/82-11.Corrective Actions:Operability Test Procedures for HPCI & RCIC Revised & Instruments Used to Measure Inservice Test Quantities Reviewed + (ML20066G908)