Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20066D995 + (ML20066D995)
- ML20066D998 + (ML20066D998)
- ML20066E001 + (ML20066E001)
- ML20066E011 + (ML20066E011)
- ML20066E013 + (ML20066E013)
- ML20066E014 + (ML20066E014)
- ML20066E016 + (ML20066E016)
- ML20066E018 + (ML20066E018)
- 05000373/LER-1982-115, Forwards LER 82-115/03L-0 + (ML20066E020)
- 05000311/LER-1982-123, Forwards LER 82-123/03L-0.Detailed Event Analysis Encl + (ML20066E024)
- 05000373/LER-1982-115-03, /03L-0:on 821005,HPCS Valves IE22-F005 & F354 Failed to Indicate Closed After Being Cycled Open During Performance of LOS-HP-Q1.Caused by Insufficient Preload on Actuator 1E22-F354 & Dried Lubricant on Moving Parts + (ML20066E030)
- 05000311/LER-1982-123-03, /03L-0:on 821010,svc Water Flow to Containment Fan Coil Unit Was 2,400 Gpm Rather than Required 2,500 Gpm. Caused by Low Setpoint on Flow Control.Controller Tested & Setpoint Readjusted to Proper Flow + (ML20066E032)
- FVY-82-115, Informs of Delays in Scheduling Installation of Redundant Containment Atmospheric Monitoring Equipment.Installation & Preoperational Testing of Equipment Will Be Completed by End of Dec 1982 + (ML20066E036)
- 05000255/LER-1982-035, Forwards LER 82-035/03L-0 + (ML20066E038)
- ML20066E040 + (ML20066E040)
- ML20066E043 + (ML20066E043)
- ML20066E047 + (ML20066E047)
- ML20066E054 + (ML20066E054)
- 05000255/LER-1982-035-03, /03L-0:on 821005,wrong Data Inserted Into in-core Alarm Setpoints.Caused by Transmittal of Old Data to I&C Supervisor Instead of Reactor Engineer.Error Immediately Recognized & Correct Data Entered + (ML20066E056)
- ML20066E059 + (ML20066E059)
- ML20066E062 + (ML20066E062)
- ML20066E063 + (ML20066E063)
- ML20066E067 + (ML20066E067)
- ML20066E070 + (ML20066E070)
- ML20066E073 + (ML20066E073)
- 05000373/LER-1982-123, Forwards LER 82-123/03L-0 + (ML20066E078)
- ML20066E079 + (ML20066E079)
- ML20066E088 + (ML20066E088)
- 05000373/LER-1982-123-03, /03L-0:on 821006,mechanical Snubber HP09-1036S Found Inoperable.Caused by Missing Load Pin Due to Improper Field Installation &/Or Maint Practices.Snubber Repinned + (ML20066E093)
- ML20066E103 + (ML20066E103)
- 0CAN118205, Application for Amend to Licenses DPR-51 & NPF-6 Authorizing Expansion of Storage Capacity of Spent Fuel Pools.Rept Addressing Safety & Environ Considerations Encl.Tech Spec Will Be Submitted at Later Date + (ML20066E108)
- ML20066E112 + (ML20066E112)
- ML20066E113 + (ML20066E113)
- ML20066E117 + (ML20066E117)
- ML20066E125 + (ML20066E125)
- ML20066E127 + (ML20066E127)
- ML20066E133 + (ML20066E133)
- ML20066E134 + (ML20066E134)
- 05000272/LER-1982-079, Forwards LER 82-079/03L-0.Detailed Event Analysis Encl + (ML20066E135)
- ML20066E139 + (ML20066E139)
- 05000373/LER-1982-117, Forwards LER 82-117/03L-0 + (ML20066E145)
- ML20066E146 + (ML20066E146)
- ML20066E150 + (ML20066E150)
- ML20066E151 + (ML20066E151)
- 05000272/LER-1982-079-03, /03L-0:on 821006,following Satisfactory Completion of Maint Procedure M3M,discovered That Procedure Not Performed During Preceding Wk.Caused by Oversight on Part of Electrical Supervisor.Order Written for Weekly Surveillance + (ML20066E152)
- 05000373/LER-1982-120, Forwards LER 82-120/03L-0 + (ML20066E154)
- 05000373/LER-1982-117-03, /03L-0:on 821008,Div 1 125-volt Dc Battery Charger Failed.Caused by Failure of Amplifier Circuit Board.Bus Crosstied to Unit 2 Supply.Amplifier Board Replaced & Circuit Board Returned to Manufacturer for Repair + (ML20066E156)
- ML20066E157 + (ML20066E157)
- ML20066E158 + (ML20066E158)
- ML20066E159 + (ML20066E159)
- ML20066E161 + (ML20066E161)