Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065S182 + (ML20065S182)
- ML20065S184 + (ML20065S184)
- ML20065S185 + (ML20065S185)
- ML20065S190 + (ML20065S190)
- ML20065S192 + (ML20065S192)
- ML20065S194 + (ML20065S194)
- ML20065S196 + (ML20065S196)
- ML20065S199 + (ML20065S199)
- RBG-40570, Monthly Operating Rept for Apr 1994 for River Bend Station + (ML20065S200)
- ML20065S202 + (ML20065S202)
- ML20065S203 + (ML20065S203)
- ML20065S207 + (ML20065S207)
- 2CAN059404, Provides Listed Info Re Fire Barrier Penetration Testing Program,Hydrogen Monitoring Mod & Electrical Power Sys,Per NRC Request + (ML20065S208)
- ML20065S209 + (ML20065S209)
- 0CAN059403, Provides Summary of Recent Mgt Changes as follow-up to Earlier Telcons + (ML20065S210)
- ML20065S212 + (ML20065S212)
- ML20065S214 + (ML20065S214)
- ML20065S216 + (ML20065S216)
- ML20065S217 + (ML20065S217)
- ML20065S219 + (ML20065S219)
- ML20065S220 + (ML20065S220)
- ML20065S223 + (ML20065S223)
- ML20065S225 + (ML20065S225)
- ML20065S228 + (ML20065S228)
- ML20065S229 + (ML20065S229)
- ML20065S232 + (ML20065S232)
- ML20065S233 + (ML20065S233)
- BSEP-90-0795, Forwards Monthly Status Rept on Integrated Action Plan + (ML20065S236)
- ML20065S239 + (ML20065S239)
- ML20065S241 + (ML20065S241)
- ML20065S245 + (ML20065S245)
- HL-1382, Forwards Results of Radiochemical Analyses of Liquid Samples Sent to Util in Oct 1990 as Part of NRC Confirmatory Measurements Program.Samples Analyzed for tritium,Fe-55, Sr-89 & Sr-90 + (ML20065S246)
- 05000237/LER-1982-028-03, /03L-0 Has Been Canceled + (ML20065S247)
- BSEP-90-0813, Submits Final Results of NRC Test Samples Received at Facility on 901009.Results Decay Corrected to 901001 Per Encl Instructions.W/O Instructions + (ML20065S248)
- ML20065S249 + (ML20065S249)
- BECO-90-154, Forwards Results of LOCA Analysis for Facility Performed Using GE SAFER/GESTR-LOCA Application Methodology Approved by NRC in .Results Withheld (Ref 10CFR2.790(b)(1)) + (ML20065S252)
- ML20065S255 + (ML20065S255)
- BVY-90-122, Submits 30-day Response to Suppl 3 to Generic Ltr 89-10, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves. Plant Design Does Not Include Isolation Condenser + (ML20065S260)
- ML20065S264 + (ML20065S264)
- ML20065S266 + (ML20065S266)
- 3F0594-06, Monthly Operating Rept for Apr 1994 for Crystal River Unit 3 + (ML20065S267)
- 05000317/LER-1989-023, :on 891220,design Deficiency Noted Which Could Result in Unavailability of Both safety-related Svc Water Subsystems.Caused by Design Deficiency.Leak Rate Monitoring Increased + (ML20065S268)
- PY-CEI-NRR-1803, Monthly Operating Rept for Apr 1994 for Perry Nuclear Power Plant + (ML20065S270)
- 05000293/LER-1982-003, Forwards Updated LER 82-003/99X-2 + (ML20065S271)
- ML20065S277 + (ML20065S277)
- ML20065S278 + (ML20065S278)
- JAFP-94-0259, Monthly Operating Rept for Apr 1994 for Ja FitzPatrick Nuclear Power Plant + (ML20065S285)
- NRC-94-0040, Monthly Operating Rept for Apr 1994 for Fermi 2 + (ML20065S288)
- 05000298/LER-1982-020, Forwards LER 82-020/03L-0.Detailed Event Analysis Submitted + (ML20065S291)
- RC-94-0133, Monthly Operating Rept for Apr 1994 for VC Summer Nuclear Station,Unit 1 + (ML20065S294)