Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064F428 + (ML20064F428)
- ML20064F429 + (ML20064F429)
- ML20064F437 + (ML20064F437)
- ML20064F438 + (ML20064F438)
- 05000366/LER-1982-112-02, /02X-3:on 821009,while Operating at 75% Power, Discovered Plant Procedures Did Not Adequately Test Automatic Initiation Logic of Several Plant Sys.Cause Not Stated.New Procedures Written & Performed to Test Logic + (ML20064F439)
- 05000387/LER-1982-064, Forwards LER 82-064/03L-0 + (ML20064F444)
- ML20064F449 + (ML20064F449)
- 05000395/LER-1982-016, Forwards Revised LER 82-016/03L-1.Detailed Event Analysis Encl + (ML20064F453)
- ML20064F455 + (ML20064F455)
- 05000416/LER-1982-152, Forwards LER 82-152/03L-0 + (ML20064F459)
- ML20064F460 + (ML20064F460)
- ML20064F464 + (ML20064F464)
- 05000387/LER-1982-064-03, /03L-0:on 821127,as Power Increased Above 30%, Rod Block Monitor Did Not Activate.Caused by Circuitry Error in Design Package to Modify Average Power Range Monitor Gain Adjustment.Mod (Pmr 82-790) Implemented to Correct Logi + (ML20064F466)
- 05000416/LER-1982-152-03, /03L-0:on 821130,required Diesel Fuel Oil Insolubles Test Not Performed.Test Overlooked & Required Equipment Not on Hand.Caused by Personnel Error.Necessary Equipment Ordered & Received & Test Completed on 820909 + (ML20064F478)
- ML20064F479 + (ML20064F479)
- 05000395/LER-1982-016-03, Main Control Board Indicator for Reactor Bldg Pressure (PI-950) Failed Low. Cause Still Under Investigation.Surveillance Test Procedure 303.001 Performed Satisfactorily.Channel Returned to Svc + (ML20064F485)
- 05000387/LER-1982-062-01, /01P-0:on 821223,during Performance of Loss of Offsite Power Test,Both Standby Gas Treatment Sys Trains Failed.Caused by High Radiation Trip Due to Heater Not Raising Proper Air Temp within Time Limit.Mods Initiated + (ML20064F494)
- ML20064F497 + (ML20064F497)
- ML20064F503 + (ML20064F503)
- ML20064F508 + (ML20064F508)
- ML20064F513 + (ML20064F513)
- ML20064F515 + (ML20064F515)
- ML20064F520 + (ML20064F520)
- ML20064F522 + (ML20064F522)
- L-78-339, Ack Receipt of IE Inspec Repts 50-250/78-17 & 50-251/78-17. Does Not Consider Any Info Therein to Be Proprietary + (ML20064F525)
- 05000311/LER-1982-150-03, /03L-0:on 821203,rod Position Indicator 2B4 Read 14 Steps Lower than Bank Demand Position Indicator. Caused by Channel Indicator Drift.Indicator Recalibr + (ML20064F538)
- L-78-342, Responds to 781016 NRC Ltr Re Violations Noted in Inspec Repts 50-250/78-16 & 50-251/78-16.Corrective Actions:Aerial Survey Will Be Performed Over Subj Facil,Procedural Requirements Will Be Established for Ci/Sec Rate + (ML20064F552)
- ML20064F560 + (ML20064F560)
- 05000461/LER-1994-002, :on 940201,MSIV Leakage Control Sys Dilution Air Flow Transmitter Making Transmitter Inoperable.Caused by Personnel Error.Instrument Valves for Transmitter 1E32-NO59 Labled & All Labling for Valves Enhanced + (ML20064F561)
- ML20064F567 + (ML20064F567)
- ML20064F569 + (ML20064F569)
- ML20064F578 + (ML20064F578)
- ML20064F582 + (ML20064F582)
- ML20064F596 + (ML20064F596)
- 05000348/LER-1978-079, Forwards LER 78-079/01T-0 + (ML20064F603)
- ML20064F616 + (ML20064F616)
- ML20064F619 + (ML20064F619)
- ML20064F621 + (ML20064F621)
- ML20064F623 + (ML20064F623)
- ML20064F624 + (ML20064F624)
- ML20064F625 + (ML20064F625)
- ML20064F635 + (ML20064F635)
- ML20064F641 + (ML20064F641)
- ML20064F644 + (ML20064F644)
- ML20064F647 + (ML20064F647)
- RBG-40305, Annual Occupational Radiation Exposure 10CFR20 Rept, Personnel Whole Body Exposure for CY93 + (ML20064F649)
- ML20064F653 + (ML20064F653)
- ML20064F654 + (ML20064F654)
- ML20064F659 + (ML20064F659)
- NRC-94-4076, Responds to RAI Re AP600 Core Makeup Tank Tests.Changes Reflected in Recent Rev to WCAP-13345,Rev 2,which Was Transmitted to NRC Via Ltr NTD-NRC-94-4068 + (ML20064F660)