Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000366/LER-1982-101-03, /03L-0:on 820829,inboard MSIV in Loop C Failed Closed.Caused by Improper Stem to Disk Thread Engagement. Disk & Stem Assembly Replaced in Both C Loop Msivs.Valves Tested & Returned to Svc + (ML20063P205)
- ML20063P207 + (ML20063P207)
- ML20063P208 + (ML20063P208)
- ML20063P210 + (ML20063P210)
- 05000254/LER-1982-030, Forwards LER 82-030/03L-0 + (ML20063P211)
- ML20063P213 + (ML20063P213)
- 05000244/LER-1982-019, Forwards LER 82-019/03L-0 + (ML20063P214)
- 05000254/LER-1982-030-03, /03L-0:on 820905,while Testing RHR Svc Water Pump 1-1001-65D,packing Found Burned.Caused by Excessive Tightening in Packing to Limit Leakage.Mods Installed to Protect Bearings from Seal Leakage + (ML20063P216)
- 05000249/LER-1982-034, Forwards LER 82-034/03L-0 + (ML20063P217)
- 05000244/LER-1982-019-03, /03L-0:on 820901,while Performing PT-2.9, Containment Particulate/Gas Radiation Monitor R11/12 Return Line Isolation Check Valve CV-1599 Found Leaking Excessively.Caused by Graphite in Valve & Valve Disc Wear + (ML20063P219)
- ML20063P220 + (ML20063P220)
- 05000249/LER-1982-034-03, /03L-0:on 820901,investigation Revealed That Substandard Electromatic Relief Valve Main Valve Disc Guide Sleeve Utilized on ERV 3-203-3C.Caused by Personnel Error in Ordering Sleeve.Sleeve Will Be Replaced + (ML20063P222)
- ML20063P226 + (ML20063P226)
- ML20063P229 + (ML20063P229)
- ML20063P234 + (ML20063P234)
- 05000313/LER-1982-027, Forwards LER 82-027/03L-0 + (ML20063P236)
- 05000280/LER-1982-096-03, /03L-0:on 820916,w/unit at 99% power,PT-27C Revealed That Amp Readings for Heat Tracing Panel 9,circuit 19,was Below Acceptance Criteria.Caused by Excessive Heat. Defective Heat Tracing Replaced & Tested + (ML20063P238)
- 05000313/LER-1982-027-03, /03L-0:on 820714,RCS Leak Rate Calculated at 3.4 Gpm,In Excess of Tech Spec.Caused by Low Breakway Torque Valves,Deteriorated Gasket & Eroded Manway Cover.All Defective Parts Repaired or Replaced + (ML20063P239)
- ML20063P240 + (ML20063P240)
- 05000280/LER-1982-095-03, /03L-0:on 820911,w/unit at Full Power,Steam Generator C Level Indication LI-1-495 Drifted High.Caused by body-bonnet Leak on Transmitter Ref Leg Root Valve.Repairs Will Be Performed During Next Outage + (ML20063P241)
- GO2-82-807, Final Deficiency Rept Re High Resistance Cable Grounding of 4.16 Kv Diesel Generators.Initially Reported on 820506. Manufacturers Advised That Equipment Can Operate for Indefinite Period w/line-to-ground Fault W/O Damage + (ML20063P242)
- 05000311/LER-1982-097, Forwards LER 82-097/03L-0.Detailed Event Analysis Encl + (ML20063P245)
- 05000366/LER-1982-110, Forwards LER 82-110/03L-0 + (ML20063P247)
- 05000366/LER-1982-110-03, /03L-0:820909,during steady-state Operation, Performance of Monthly Drywell Procedure Disclosed Integrator Output Outside Acceptable Range.Caused by Instrument Drift.Drywell Equipment Drain Sump Pumps Secured + (ML20063P252)
- 05000278/LER-1982-017-03, /03L-0:on 820902,during Heavy Rainstorm,Operator Observed That Vent Stack Flow Recorder Indicated Downscale on Both Channels.Caused by Pilot Tubes Filling W/Water During Severe Storm.Indication Returned When Storm Subsided + (ML20063P256)
- 05000311/LER-1982-097-03, /03L-0:on 820910,RCS Water Inventory Not Performed within Specified Time Interval.Caused by Failure of Surveillance to Make Allowance for Routine Unavoidable Transients Precluding Inventory Performance + (ML20063P257)
- 05000336/LER-1982-037, Forwards LER 82-037/03L-0 + (ML20063P258)
- ML20063P264 + (ML20063P264)
- 05000373/LER-1982-107, Forwards LER 82-107/03L-0 + (ML20063P265)
- 05000373/LER-1982-107-03, /03L-0:on 820812,control Rod Drive Pump a Tripped Off on Low Suction Pressure & Control Rod Drive Pump B Failed to Start.Caused by Low Cy Storage Tank Level & Valve 1CD109 Condensate/Crd Reject Being Abnormally Closed + (ML20063P268)
- ML20063P272 + (ML20063P272)
- ML20063P273 + (ML20063P273)
- ML20063P275 + (ML20063P275)
- ML20063P276 + (ML20063P276)
- ML20063P277 + (ML20063P277)
- ML20063P278 + (ML20063P278)
- ML20063P279 + (ML20063P279)
- ML20063P280 + (ML20063P280)
- ML20063P282 + (ML20063P282)
- 05000254/LER-1982-031, Forwards LER 82-031/03L-0 + (ML20063P283)
- 05000254/LER-1982-031-03, /03L-0:on 820905,RCIC Sys Taken Out of Svc to Uncouple Turbine from Pump.Caused by Need to Perform Scheduled Turbine Overspeed Surveillance Test + (ML20063P287)
- 05000321/LER-1982-074, Forwards LER 82-074/03L-0 + (ML20063P289)
- 05000321/LER-1982-074-03, /03L-0:on 820901,HPCI Steam Pressure Contact Switches A,C & D Actuated at Less than 107.3 Psig.Caused by Component Failure Due to Setpoint Drift.Switches Calibr & Function Tested + (ML20063P291)
- ML20063P293 + (ML20063P293)
- ML20063P294 + (ML20063P294)
- ML20063P297 + (ML20063P297)
- ML20063P299 + (ML20063P299)
- ML20063P300 + (ML20063P300)
- ML20063P302 + (ML20063P302)
- 05000361/LER-1982-099, Forwards LER 82-099/01T-0.Detailed Event Analysis Submitted + (ML20063P303)
- ML20063P306 + (ML20063P306)