Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000325/LER-1982-060-03, /03L-0:on 820528,while Performing Channel Functional Test of HPCI Sys Suction Low Water Level Instrumentation,Cst Instrument 1-E41-LSL-N002 Did Not Actuate within Specs.Caused by Organic Deposit + (ML20063D137)
- 05000296/LER-1982-031-03, /03L-0:on 820716,two Degraded Voltage Relay Timers on 4-kV Sdb 3EC & 3ED Found Set at 0.26-s.Caused by Timer Setpoints Change in 820329 Tech Spec Revision,But Not Incorporated Into SI 4.9.A.4.c.Timers Recalibr + (ML20063D138)
- 05000334/LER-1980-027, Forwards Updated LER 80-027/03L-1 + (ML20063D140)
- ML20063D141 + (ML20063D141)
- 05000324/LER-1982-093, Forwards LER 82-093/03L-0 + (ML20063D144)
- ML20063D145 + (ML20063D145)
- 05000334/LER-1980-027-03, During Maint of Diesel Generator Lube Oil Cooler,Internals of River Water Check Valve Discovered in Cooler.Caused by Flutter Due to High Flow Conditions Eroding Hinge Pin Guide.Valve Replaced + (ML20063D150)
- 05000259/LER-1982-048, Forwards LER 82-048/03L-0 + (ML20063D151)
- 05000280/LER-1982-030-03, /03L-0:on 820526,during Cold Shutdown,Preparations for Filling Reactor Coolant Loop a Resulted in RCS Boron Dilution.Caused by Temporary Malfunction of Boric Acid Flow Controller.Controller Functioning Properly + (ML20063D161)
- ML20063D162 + (ML20063D162)
- ML20063D167 + (ML20063D167)
- 05000280/LER-1982-064-03, /03L-0:on 820530,w/unit at 100% Power,Charging Pump Svc Water Pump 1-SW-P-10B Failed to Develop Sufficient Discharge Pressure.Caused by Insufficient Npsh.Svc Water to Chillers Throttled + (ML20063D172)
- ML20063D174 + (ML20063D174)
- ML20063D177 + (ML20063D177)
- 05000280/LER-1982-033-03, /03L-0:on 820530,w/unit at 96% Power,Charging Pump Svc Water Pump 2-SW-P-10B Failed to Develop Sufficient Discharge Pressure.Caused by Insufficient Npsh.Svc Water to Chillers Throttled + (ML20063D178)
- ML20063D182 + (ML20063D182)
- ML20063D190 + (ML20063D190)
- 05000259/LER-1982-048-03, /03L-0:on 820718,coil for Relay 16A-K37 Failed, Resulting in Partial Primary Containment Isolation.Caused by Burned Out GE Type CR 120A,Model 5000001G002 Coil.Relay Coil Replaced + (ML20063D192)
- W3P82-1733, Forwards Proprietary & Nonproprietary Versions of Waterford 3,Cycle 1 Cpc/Ceac Phase 1 Software Verification Test Rept & Waterford 3,Cycle 1 Cpc/Ceac Phase II Software Verification Test Rept. Affidavit Encl + (ML20063D193)
- ML20063D197 + (ML20063D197)
- 05000259/LER-1982-049, Forwards LER 82-049/03L-0 + (ML20063D198)
- ML20063D201 + (ML20063D201)
- ML20063D205 + (ML20063D205)
- ML20063D209 + (ML20063D209)
- 05000325/LER-1982-088, Forwards LER 82-088/03L-0 + (ML20063D229)
- 05000259/LER-1982-049-03, /03L-0:on 820721 & 23,SI 4.1.A-11 (MSIV Closure Functional Test) & SI 4.5.E.1.c (HPCI Motor Operated Valve Operability Test) & SI 4.5.E.1.d & E (HPCI Flow Rate) Not Performed.Caused by Defective Procedure + (ML20063D239)
- ML20063D253 + (ML20063D253)
- ML20063D262 + (ML20063D262)
- ML20063D264 + (ML20063D264)
- 05000366/LER-1982-072, Forwards LER 82-072/03L-0 + (ML20063D270)
- ML20063D281 + (ML20063D281)
- 05000366/LER-1982-072-03, /03L-0:on 820715,HPCI Turbine Exhaust Discharge Pressure Hi & HPCI Turbine Trip Solenoid Energized Alarms Activated.Caused by Component Failure Due to Fouled Contacts on HPCI Turbine Exhaust Pressure Switch.Switch Cleaned + (ML20063D286)
- ML20063D287 + (ML20063D287)
- ML20063D291 + (ML20063D291)
- 05000259/LER-1982-047, Forwards LER 82-047/03L-0 + (ML20063D306)
- ML20063D310 + (ML20063D310)
- 05000346/LER-1982-025, Forwards LER 82-025/03L-0 + (ML20063D313)
- ML20063D320 + (ML20063D320)
- 05000259/LER-1982-047-03, /03L-0:on 820721,while Performing SI 4.2.A-3 (Reactor Water Level Indicating Switch) LIS-3-56D,switches 1 & 2 Operated at 454.56 Inches.Caused by Sticking Pointer on Indicator.Pointer Adjusted + (ML20063D321)
- ML20063D322 + (ML20063D322)
- 05000336/LER-1982-020, Forwards LER 82-020/03L-0 + (ML20063D324)
- 05000346/LER-1982-025-03, /03L-0:on 820527,test Interval for Boration Flowpath Heat Trace Test ST 5011.01 Exceeded.Caused by Personnel Error.Event Reviewed W/Responsible Individuals & Memo Issued to Operators + (ML20063D328)
- ML20063D330 + (ML20063D330)
- 05000336/LER-1982-020-03, /03L-0:on 820528,inservice Insp Test EN 21136 Not Completed within Required Time.Caused by Rescheduling Due to Operational Problems.Operations Supervisor Will Ensure That Future Testing Completed as Required + (ML20063D332)
- 05000368/LER-1982-018, Forwards LER 82-018/03L-0 + (ML20063D339)
- ML20063D352 + (ML20063D352)
- ML20063D353 + (ML20063D353)
- 05000255/LER-1982-016, Forwards LER 82-016/03L-0 + (ML20063D358)
- 05000368/LER-1982-019, Forwards LER 82-019/03L-0 + (ML20063D364)
- ML20063D374 + (ML20063D374)
- ML20063D382 + (ML20063D382)