Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20062N860 + (ML20062N860)
- PY-CEI-NRR-1733, Monthly Operating Rept for Dec 1993 for Perry Nuclear Power Plant,Unit 1 + (ML20062N861)
- ML20062N863 + (ML20062N863)
- ML20062N869 + (ML20062N869)
- ML20062N873 + (ML20062N873)
- ML20062N880 + (ML20062N880)
- ML20062N883 + (ML20062N883)
- 05000249/LER-1982-030, Forwards LER 82-030/03L-0 + (ML20062N885)
- ML20062N887 + (ML20062N887)
- ML20062N890 + (ML20062N890)
- 05000249/LER-1982-030-03, /03L-0:on 820716,transient in-core Probe Ball Valve 3A Failed to Reclose After Opening.Cause Will Be Resolved During Next Outage.Valve Will Be Replaced & Supplemental LER Submitted When Cause Determined + (ML20062N900)
- ML20062N901 + (ML20062N901)
- BSEP-94-0005, Provides Info Discussed W/Nrc During 931221 Telcon Re Unit 1 Shroud Clamp Bolt Bending Stresses & Max Allowable Bolt pre- Load + (ML20062N903)
- ML20062N912 + (ML20062N912)
- ML20062N917 + (ML20062N917)
- ML20062N925 + (ML20062N925)
- ML20062N946 + (ML20062N946)
- 05000261/LER-1981-008, Forwards LER 81-008/03L-0 + (ML20062N965)
- 05000261/LER-1981-008-03, /03L-0:on 810225 While Performing Monthly Periodic Test CPL-PT-5.5,Hagan Signal Comparator Module Found Inoperable.Cause Not Stated.Comparator Replaced + (ML20062N969)
- NG-93-5376, Forwards DAEC ASME Section XI ISI Summary Rept RFO 12 for Period from 920428-931013 + (ML20062N984)
- ML20062N991 + (ML20062N991)
- ML20062P011 + (ML20062P011)
- ML20062P033 + (ML20062P033)
- ML20062P044 + (ML20062P044)
- ML20062P058 + (ML20062P058)
- RBG-13-211, Interim Deficiency Rept Re HPCS Diesel Generator Radioactive Heat Loss Value.Initially Reported on 820212.Util Awaiting Info from GE Re Cause of Deficiency & Necessary Corrective Actions.Next Rept Expected by 821028 + (ML20062P062)
- JSP-006-94, Part 21 Rept Re Westinghouse 4160 Volt Alternating Current Breakers Incorrectly Configured & Poorly Constructed. Initially Reported on 931111.Affected Assemblies Placed on Hold Pending Disposition + (ML20062P066)
- ML20062P070 + (ML20062P070)
- 05000267/LER-1982-030, Forwards LER 82-030/03L-0.Detailed Event Analysis Encl + (ML20062P071)
- 05000267/LER-1982-030-03, /03L-0:on 820719,total Primary Coolant Oxidants Exceeded Tech Specs Twice.Caused by Offgassing of Moisture Due to Increasing Temp During Recovery from Reactor Scram + (ML20062P079)
- RBG-13-205, Final Deficiency Rept DR-31 Re Loose Mounting Screws or Fasteners Used to Assemble or Mount Position Switch Assembly on Limitorque Valve Motor Operators.Initially Reported on 811211.Limit Switches to Be Restored + (ML20062P088)
- ML20062P090 + (ML20062P090)
- ML20062P094 + (ML20062P094)
- ML20062P097 + (ML20062P097)
- ML20062P099 + (ML20062P099)
- 05000267/LER-1982-029, Forwards LER 82-029/03X-1.Detailed Event Analysis Encl + (ML20062P103)
- 05000267/LER-1982-029-03, /03X-1:on 820712,20 & 21,emergency Feedwater Headers to Helium Circulator Pelton Wheel Drives Isolated to Perform Maint on Leaking Header Safety Valves.Cause of Leakage Not Stated + (ML20062P110)
- ML20062P120 + (ML20062P120)
- ML20062P121 + (ML20062P121)
- ML20062P154 + (ML20062P154)
- 05000331/LER-1982-048, Forwards LER 82-048/03L-0 + (ML20063A006)
- ML20063A011 + (ML20063A011)
- ML20063A021 + (ML20063A021)
- ML20063A034 + (ML20063A034)
- ML20063A036 + (ML20063A036)
- ML20063A041 + (ML20063A041)
- ML20063A044 + (ML20063A044)
- ML20063A050 + (ML20063A050)
- AECM-82-345, Forwards Details of Cooling Tower Drift Sampling & Analytical Procedures Per Environ Protection Program Requirements + (ML20063A054)
- ML20063A067 + (ML20063A067)
- ML20063A068 + (ML20063A068)