Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20054L755 + (ML20054L755)
- ML20054L757 + (ML20054L757)
- IR 05000266/1982014 + (ML20054L759)
- ML20054L760 + (ML20054L760)
- ML20054L761 + (ML20054L761)
- IR 05000361/1982020 + (ML20054L762)
- ML20054L763 + (ML20054L763)
- ML20054L764 + (ML20054L764)
- ML20054L767 + (ML20054L767)
- IR 05000267/1982015 + (ML20054L768)
- ML20054L769 + (ML20054L769)
- ML20054L771 + (ML20054L771)
- IR 05000327/1981028 + (ML20054L772)
- ML20054L773 + (ML20054L773)
- ML20054L775 + (ML20054L775)
- ML20054L776 + (ML20054L776)
- ML20054L777 + (ML20054L777)
- 05000259/LER-1982-038-03, /03L-0:on 820601,pressure Switches PS-3-74B Switch 1 & 2 Found Operating Out of Calibr.Caused by Calibr Drift. Switches Recalibr,Returned to Svc & Replaced 820622 + (ML20054L778)
- ML20054L779 + (ML20054L779)
- IR 05000206/1982018 + (ML20054L780)
- ML20054L781 + (ML20054L781)
- ML20054L782 + (ML20054L782)
- IR 05000275/1982016 + (ML20054L783)
- 05000312/LER-1982-013, Forwards LER 82-013/04T-0.Detailed Event Analysis Submitted + (ML20054L784)
- ML20054L786 + (ML20054L786)
- 05000259/LER-1982-037, Forwards LER 82-037/03L-0 + (ML20054L788)
- ML20054L790 + (ML20054L790)
- ML20054L792 + (ML20054L792)
- ML20054L793 + (ML20054L793)
- ML20054L795 + (ML20054L795)
- ML20054L796 + (ML20054L796)
- 05000312/LER-1982-013-04, /04T-0:on 820607,during Chlorination of Nuclear Svc Spray Pond,Spray Pond Filters Went Into Backwash Mode. Cause Not Stated.Several Fish in Discharge Stream Killed Due to Excessive Chlorine.Chlorine Injection Point to Be Mov + (ML20054L797)
- ML20054L798 + (ML20054L798)
- ML20054L799 + (ML20054L799)
- ML20054L800 + (ML20054L800)
- 05000259/LER-1982-037-03, /03L-0:on 820528,pressure Switches 1-PS-1-8A & B Found Operating Out of Calibr.Caused by Calibr Drift.Switch 1-PS-18B Recalibr.Switch 1-PS-18A Replaced + (ML20054L801)
- ML20054L802 + (ML20054L802)
- ML20054L803 + (ML20054L803)
- ML20054L805 + (ML20054L805)
- ML20054L806 + (ML20054L806)
- ML20054L807 + (ML20054L807)
- ML20054L809 + (ML20054L809)
- IR 05000333/1980020 + (ML20054L811)
- ML20054L813 + (ML20054L813)
- IR 05000301/1982010 + (ML20054L815)
- ML20054L817 + (ML20054L817)
- ML20054L819 + (ML20054L819)
- ML20054L820 + (ML20054L820)
- ML20054L821 + (ML20054L821)
- ML20054L822 + (ML20054L822)
- JAFP-82-0478, Responds to NRC Re Violations Noted in IE Health Physics Appraisal Rept 50-333/80-20.Corrective Actions:Major Functions of Radiological & Environ Svc Dept Reassigned & Acceptable Personnel Neutron Dosimetry Presently in Use + (ML20054L824)