Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000461/LER-1993-001-01, :on 930226,requirements of TS 3.3.7.5 Were Not Met Due to Vendor Failure to Design Flywheel & Unexplained Capped Constant Bleed Drain on Air Tank Resulting in High Compressor Current.Labels Installed.W/Undated Ltr + (ML20035E674)
- ML20035E675 + (ML20035E675)
- ML20035E677 + (ML20035E677)
- ML20035E678 + (ML20035E678)
- ML20035E679 + (ML20035E679)
- ML20035E680 + (ML20035E680)
- ML20035E681 + (ML20035E681)
- ML20035E682 + (ML20035E682)
- ET-NRC-93-3861, Requests That Encl NRC-Requested Catawba Unit 1 SG Leakage Evaluation Be Withheld.Vendor Will Comply W/Requirements of 10CFR2.790 to Provide Proprietary & Nonproprietary Versions of Subj Evaluation W/Affidavit When Matl Prepared + (ML20035E683)
- TXX-9315, Advises That Util Has Completed Testing of ERDS Sys W/ Halliburton Nus.Requirements of 10CFR50,App E,VI(3)(a) & (B) to Notify NRC of Changes to Plant Attribute Library & Data Point Library Incorporated Into Station Documents + (ML20035E685)
- RBG-38328, Monthly Operating Rept for Mar 1993 for River Bend Station, Unit 1 + (ML20035E691)
- ML20035E693 + (ML20035E693)
- ML20035E694 + (ML20035E694)
- ML20035E695 + (ML20035E695)
- NRC-93-0045, Monthly Operating Rept for Mar 1993 for Fermi 2 + (ML20035E699)
- ML20035E700 + (ML20035E700)
- SNRC-2045, Forwards Response to Request for Addl Info Re Decommissioning Project Termination Survey Plan for Unit 1 + (ML20035E701)
- 2CAN049304, Monthly Operating Rept for Mar 1993 for Ano,Unit 2 + (ML20035E702)
- ML20035E703 + (ML20035E703)
- 1CAN049304, Monthly Operating Rept for Mar 1993 for Ano,Unit 1 + (ML20035E705)
- ML20035E706 + (ML20035E706)
- B14433, Informs That Rev 23 to Haddam Neck Plant Emergency Plan Was Implemented 930412.Rev Does Not Decrease Effectiveness of Plan + (ML20035E707)
- ML20035E708 + (ML20035E708)
- ML20035E710 + (ML20035E710)
- ML20035E713 + (ML20035E713)
- ML20035E714 + (ML20035E714)
- ML20035E715 + (ML20035E715)
- ML20035E718 + (ML20035E718)
- ML20035E720 + (ML20035E720)
- ML20035E721 + (ML20035E721)
- BVY-93-042, Addresses Concerns Delineated in GL 92-08 Re Thermo-Lag 330 Fire Barriers,Per NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier to Perform Specified Fire.... Util Will Continue to Monitor NUMARCs Efforts on Subj + (ML20035E722)
- ML20035E723 + (ML20035E723)
- ML20035E724 + (ML20035E724)
- ML20035E725 + (ML20035E725)
- ML20035E726 + (ML20035E726)
- ML20035E728 + (ML20035E728)
- ML20035E730 + (ML20035E730)
- ML20035E731 + (ML20035E731)
- ML20035E732 + (ML20035E732)
- ML20035E733 + (ML20035E733)
- ML20035E735 + (ML20035E735)
- ML20035E736 + (ML20035E736)
- ML20035E737 + (ML20035E737)
- ML20035E739 + (ML20035E739)
- ML20035E740 + (ML20035E740)
- 05000293/LER-1993-004, :on 930313,automatic Scram Occurred Resulting from Load Rejection During Severe Coastal Storm While at 100% Power.Caused by Environ Effects of Storm.Trip Settings of Main Input Circuit Breakers Increased + (ML20035E741)
- 05000327/LER-1993-005, :on 930320,containment Isolation Valve Inadvertently Actuated When Mechanic Inadvertently Shorted Test Leads After Verification of Equipment Setup.Caused by Blown Fuse.Test Leads Correctly Reconnected + (ML20035E742)
- ML20035E744 + (ML20035E744)
- ML20035E746 + (ML20035E746)
- ML20035E747 + (ML20035E747)
- ML20035E748 + (ML20035E748)