- 05000369/LER-1981-097-03, /03L-0:on 810612,in Mode 5,routine Surveillance Discovered That Quantity of Fire Detection Equipment Installed in Five Fire Zones Did Not Comply W/Tech Specs. Caused by Typographical Error & Incorrect Blueprints + (ML20009G036)
- 05000369/LER-1981-091, Forwards LER 81-091/03L-0.Detailed Event Analysis Encl + (ML20009G037)
- ML20009G038 + (ML20009G038)
- 05000338/LER-1981-034-03, /03L-0:on 810627,quadrant Power Tilt Ratio Indicated Tilt in Excess of 1.02 During Power Escalation. Caused by Control Rods Being Inserted Lower in Core than Desired While Increasing Reactor Power to 100% + (ML20009G039)
- ML20009G040 + (ML20009G040)
- L-81-316, Final Deficiency Rept Re Protuberance on Local Control Station Switches Supplied by Gould Rundel,Initially Reported 810625.Purchase Spec Revised to Specify Contact Maint During Position Change + (ML20009G041)
- 05000369/LER-1981-091-03, /03L-0:on 810530,peak Shock Annuciator Amber Light Observed On.Caused by Light Reed Switch from Triaxial response-spectrum Recorder Making Contact.Reed Switch Adjusted,Tested & Delared Operable + (ML20009G042)
- ML20009G043 + (ML20009G043)
- 05000259/LER-1981-031, Forwards LER 81-031/03L-0 + (ML20009G044)
- ML20009G045 + (ML20009G045)
- ML20009G046 + (ML20009G046)
- 05000259/LER-1981-031-03, /03L-0:on 810610,discovered That Eight Level Switches Would Not Operate During Maint on Scram Accumulator.Caused by Excessive Amounts of Substance on Switch Float & Guide Stem,Causing Float to Stick + (ML20009G047)
- ML20009G049 + (ML20009G049)
- ML20009G051 + (ML20009G051)
- ML20009G052 + (ML20009G052)
- ML20009G053 + (ML20009G053)
- ML20009G054 + (ML20009G054)
- ML20009G057 + (ML20009G057)
- ML20009G058 + (ML20009G058)
- ML20009G061 + (ML20009G061)
- BSEP-81-1271, Confirms 810625 Conversation Between CS Bohanan & R Butcher Re United Engineers & Constructors,Inc Notification That 38 Control Rod Driveline Gang Pipe Supports Would Fail in as-built Condition During Design Seismic Event + (ML20009G062)
- BSEP-81-0945, Ro:On 810506,investigation on RHR Heat Exchangers Determined That B Heat Exchanger Baffle Was Deformed at Bottom Allowing Bypass Flow.Cause Being Evaluated.Repairs on 2B RHR Heat Exchanger in Progress + (ML20009G063)
- ML20009G064 + (ML20009G064)
- IR 05000412/1981005 + (ML20009G065)
- ML20009G066 + (ML20009G066)
- ML20009G069 + (ML20009G069)
- AECM-81-232, First Status Rept on Potentially Reportable Deficiency Re Failure of Test Connection Pipe Off HPCS Injection Line on Containment Side of Injection Valve,Initially Reported on 810527.Investigation Ongoing.Final Rept Expected by 811029 + (ML20009G070)
- ML20009G071 + (ML20009G071)
- TXX-3373, Forwards Test Procedure to Qualify Protective Envelope Sys to Protect Redundant Essential Electrical Cables at Comanche Peak Steam Electric Station + (ML20009G073)
- ML20009G074 + (ML20009G074)
- IR 05000213/1981007 + (ML20009G075)
- ML20009G076 + (ML20009G076)
- 05000369/LER-1981-080-03, /03L-0:on 810508,while in Mode 5,initial Fuel Loading,Both Trains of RHR Sys Were Inoperable.Caused by Failure of Personnel to Prevent Entering of Mode 5 W/O RHR Train B Operable.Operating Procedure Will Be Written + (ML20009G077)
- 05000287/LER-1981-013, Forwards LER 81-013/03L-0.Detailed Event Analysis Encl + (ML20009G078)
- ML20009G079 + (ML20009G079)
- ML20009G080 + (ML20009G080)
- 05000324/LER-1981-056, Forwards LER 81-056/01T-0 + (ML20009G081)
- ML20009G082 + (ML20009G082)
- 05000309/LER-1981-081, Forwards LER 81-081/03L-0.Detailed Event Analysis Encl + (ML20009G083)
- ML20009G085 + (ML20009G085)
- ML20009G086 + (ML20009G086)
- 05000287/LER-1981-013-03, /03L-0:on 810528,1-inch Breach Discovered in 3-h Fire Barrier in Floor of Control Room Outside Shift Supervisor Ofc.Cause Undefined Due to Breach Being Covered Since Const of Control Room + (ML20009G087)
- 05000369/LER-1981-081-03, /03L-0:on 810508,while in Mode 5,control Room Received High Groundwater Alarm.Caused by Localized Temporary High Groundwater Level at 0.25 Ft Above Slab Elevation.Level Checked & Alarm Cleared + (ML20009G088)
- 05000324/LER-1981-056-01, /01T-0:on 810624,notification Received That 38 Pipe Supports Would Have Failed During Design Basis Seismic Event.Caused by Higher than Normal Slenderness Ratio. Identified Supports Upgraded + (ML20009G089)
- ML20009G090 + (ML20009G090)
- 05000311/LER-1981-037, Forwards LER 81-037/03L-0.Detailed Event Analysis Encl + (ML20009G091)
- ML20009G092 + (ML20009G092)
- 05000324/LER-1981-055, Forwards LER 81-055/03L-0 + (ML20009G093)
- ML20009G094 + (ML20009G094)
- ML20009G095 + (ML20009G095)