- TXX-3366, Advises That Const Schedule Is Under Detailed Review.Fuel Load Date of Dec 1981 Is Jeopardized Due to Inability to Achieve Critical Milestone Dates.Evaluation Will Be Sufficiently Complete by Sept 1981 to Meet W/Nrc + (ML20009C190)
- ML20009C191 + (ML20009C191)
- 05000316/LER-1981-009, Confirms 810710 Verbal Rept to Region 3 Providing Correction to LER 81-09/03L-0.Written Revision to Be Submitted Under Separate Cover + (ML20009C192)
- ML20009C193 + (ML20009C193)
- ML20009C194 + (ML20009C194)
- 05000369/LER-1981-088, Forwards LER 81-088/03L-0 + (ML20009C196)
- ML20009C197 + (ML20009C197)
- ML20009C198 + (ML20009C198)
- ML20009C199 + (ML20009C199)
- ML20009C201 + (ML20009C201)
- ML20009C202 + (ML20009C202)
- 05000369/LER-1981-088-03, /03L-0:on 810521,during Calibr of Catalytic Hydrogen Recombiner,While in Mode 5 Initial Fuel Loading, Gaseous Waste Was Released to Environ.Caused When Exhaust Isolation Valve on Hydrogen Inlet Analyzer Was Left Open + (ML20009C203)
- ML20009C205 + (ML20009C205)
- 05000369/LER-1981-053, Forwards LER 81-053/03L-0.Detailed Event Analysis Encl + (ML20009C206)
- ML20009C207 + (ML20009C207)
- 05000270/LER-1981-006, Forwards LER 81-006/03L-0.Detailed Event Analysis Encl + (ML20009C208)
- ML20009C209 + (ML20009C209)
- 05000369/LER-1981-053-03, /03L-0:on 810413,during Mode 3 Initial Fuel Loading,Liquid from Ventilation Unit Condensation Drain Tank Was Released Into Condenser Discharge W/O Prior Analysis. Caused by Deficient Procedure.Procedure Has Been Rewritten + (ML20009C210)
- 05000339/LER-1981-002, Forwards LER 81-002/03L-0 + (ML20009C211)
- ML20009C212 + (ML20009C212)
- 05000270/LER-1981-006-03, /03L-0:on 810409,valve 2PR-8 Failed to Open During on-line Insp.Caused by Faulty Valve Operator Diaphragm.Valve Repaired & Verified Operable + (ML20009C213)
- ML20009C215 + (ML20009C215)
- 05000280/LER-1981-067-01, /01X-1:on 810225,radiographic Test of Loops B & C Main Steam Piping,Revealed Linear Indications in Welds 36 & 22.Cause of Defects Under Investigation.Repairs Planned + (ML20009C216)
- 05000339/LER-1981-002-03, /03L-0:on 801230,w/unit in Mode 1,steam Flow Channel III Became Erratic W/O Any Annunciators or Computer Alarms.Cause Unknown.Channel Placed in Trip Condition, Calibr & Returned to Svc + (ML20009C217)
- 05000369/LER-1981-057-03, /03L-0:on 810417,during Mode 3,upper Head Injection Surge Tank Low Pressure Alarm Received in Control Room.Sys Determined Inoperable.Caused by Various Safety Injection Valves Found Leaking.Tank Filled.Valves Repaired + (ML20009C219)
- ML20009C221 + (ML20009C221)
- ML20009C223 + (ML20009C223)
- ML20009C224 + (ML20009C224)
- 05000369/LER-1981-046, Forwards LER 81-046/01T-0.Detailed Event Analysis Encl + (ML20009C225)
- ML20009C226 + (ML20009C226)
- 05000369/LER-1981-051, Forwards LER 81-051/03L-0.Detailed Event Analysis Encl + (ML20009C227)
- ML20009C228 + (ML20009C228)
- 05000369/LER-1981-051-03, /03L-0:on 810412,while in Mode 3,initial Fuel Loading,Train a of Solid State Protection Sys Declared Inoperable Due to Indications on Status Panel.Caused by Two Defective Circuit Boards.Boards Replaced + (ML20009C229)
- ML20009C230 + (ML20009C230)
- 05000369/LER-1981-046-01, /01T-0:on 810423,insp/leak Detection Measures Assumed for Postulated Breaks in Loop B 10-inch Accumulator Injection Line in Lieu of Structural Restraints to Prevent Unacceptable Interactions.Design Will Be Revised + (ML20009C231)
- ML20009C233 + (ML20009C233)
- 05000270/LER-1981-008-03, /03L-0:on 810508,solenoid Valve for 2FDW-316 Stuck in Manual Position,Disabling Automatic Level Control of B Steam Generator from Emergency Feedwater Sys.Valve Replaced Per Procedure + (ML20009C234)
- 05000369/LER-1981-052, Forwards LER 81-052/03L-0.Detailed Event Analysis Encl + (ML20009C235)
- ML20009C237 + (ML20009C237)
- 05000369/LER-1981-049, Forwards LER 81-049/03L-0.Detailed Event Analysis Encl + (ML20009C238)
- ML20009C239 + (ML20009C239)
- ML20009C241 + (ML20009C241)
- ML20009C242 + (ML20009C242)
- 05000369/LER-1981-052-03, /03L-0:on 810412,while in Mode 3,upper Head Injection Diaphragm Between water-filled & Nitrogen Bearing Accumulators Was Ruptured.Caused by Procedural Deficiency. Procedure Modified.Diaphragm Will Be Replaced + (ML20009C243)