Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20006B179 + (ML20006B179)
- ML20006B184 + (ML20006B184)
- ML20006B185 + (ML20006B185)
- ML20006B188 + (ML20006B188)
- ML20006B190 + (ML20006B190)
- ML20006B193 + (ML20006B193)
- ML20006B199 + (ML20006B199)
- ML20006B201 + (ML20006B201)
- 05000456/LER-1989-019-04, :on 891219,discovered That Procedure Did Not Adequately Test Response Times for High Steamline Pressure Rate Steamline Isolation Signal.Caused by Deficient Procedure.Procedures Re Response Time Revised + (ML20006B208)
- ML20006B209 + (ML20006B209)
- ML20006B216 + (ML20006B216)
- ML20006B217 + (ML20006B217)
- ML20006B218 + (ML20006B218)
- ML20006B220 + (ML20006B220)
- 05000498/LER-1989-023-01, :on 891216,standby Diesel Generator 11 Failed Tech Spec Required Operability Test & Attempt to Secure Essential Chiller 12C Resulted in Trip.Caused by Failure of Voltage Regulator.Regulator Returned to Mfg + (ML20006B222)
- ML20006B223 + (ML20006B223)
- ML20006B226 + (ML20006B226)
- ML20006B227 + (ML20006B227)
- ML20006B229 + (ML20006B229)
- ML20006B230 + (ML20006B230)
- ML20006B232 + (ML20006B232)
- PNO-IV-90-005, on 900122,solenoid Valve Failure Caused in-plant Spill of 10,000 to 20,000 Lb of Depleted UF4 Powder.One Worker Inhaled or Ingested Small Amount of Matl. Analysis of Urine & Fecal Samples Underway + (ML20006B235)
- ML20006B238 + (ML20006B238)
- ML20006B239 + (ML20006B239)
- ML20006B244 + (ML20006B244)
- 05000498/LER-1989-022-01, :on 891205,discovered That ASME Section XI Pressure Test of Train C of Component Cooling Water Sys Not Performed Prior to Returning Sys to Svc.Sys Inoperable from 890909-1206.Test Control Procedures Revised + (ML20006B255)
- ML20006B256 + (ML20006B256)
- ML20006B258 + (ML20006B258)
- B13437, Responds to NRC Re Violations Noted in Insp Rept 50-213/89-22 Re Health Physics Training Requirement. Violation Contested Based on NRC Misinterpretation of Tech Spec 6.4.1 Re Training/Replacement Training Program + (ML20006B259)
- ML20006B260 + (ML20006B260)
- ML20006B263 + (ML20006B263)
- ML20006B266 + (ML20006B266)
- ML20006B267 + (ML20006B267)
- ML20006B272 + (ML20006B272)
- ML20006B277 + (ML20006B277)
- 05000416/LER-1989-017, :on 890718,determined That Isolation for Postulated RWCU Blowdown Line Breaks in Piping Cold Rooms Was 80 S,Causing Plant to Operate in Unanalyzed Condition. Tech Spec Change Request Will Be Submitted + (ML20006B278)
- ML20006B288 + (ML20006B288)
- ML20006B296 + (ML20006B296)
- ML20006B299 + (ML20006B299)
- ML20006B316 + (ML20006B316)
- ML20006B328 + (ML20006B328)
- ML20006B333 + (ML20006B333)
- ML20006B337 + (ML20006B337)
- ST-HL-AE-3346, Forwards Rev 4 to Pump & Valve Inservice Test Plan. Rev Includes Addition of Component Cooling Water Valves FV-0864,FV-0862 & FV-0863 & Containment Sys Valves FV-1025, FV-1026,FV-1027 & FV-1028 + (ML20006B355)
- ML20006B356 + (ML20006B356)
- ML20006B361 + (ML20006B361)
- ML20006B378 + (ML20006B378)
- ML20006B380 + (ML20006B380)
- ML20006B381 + (ML20006B381)
- ML20006B382 + (ML20006B382)
- ML20006B384 + (ML20006B384)