Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005E189 + (ML20005E189)
- ML20005E190 + (ML20005E190)
- ML20005E191 + (ML20005E191)
- ML20005E192 + (ML20005E192)
- ST-HL-AE-3329, Final Rept for South Texas Project City of Austin Vs Houston Light & Power Litigation Record Review Program (Phase III) + (ML20005E193)
- ML20005E194 + (ML20005E194)
- ML20005E195 + (ML20005E195)
- ML20005E197 + (ML20005E197)
- ML20005E198 + (ML20005E198)
- 05000327/LER-1989-029, :on 891121,spurious Train B Control Room Isolation Occurred.Caused by Accidental Bumping of Relays & Degraded Fuse in Circuit.Fuses Replaced & Relays Removed & Replaced + (ML20005E199)
- ML20005E200 + (ML20005E200)
- ML20005E201 + (ML20005E201)
- ML20005E203 + (ML20005E203)
- ML20005E204 + (ML20005E204)
- ML20005E205 + (ML20005E205)
- ML20005E207 + (ML20005E207)
- ML20005E208 + (ML20005E208)
- ML20005E209 + (ML20005E209)
- AECM-89-0232, Certifies Implementation of fitness-for-duty Program That Meets Requirements of 10CFR26,effective 900103.Only Marijuana Metabolites Will Be Tested at Present + (ML20005E210)
- ML20005E211 + (ML20005E211)
- NLS8900469, Responds to NRC Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. Approx 6 Addl Months,Beyond Allotted 5-yr Schedule,Will Be Required to Complete All Required Valve Testing + (ML20005E212)
- ML20005E213 + (ML20005E213)
- ML20005E215 + (ML20005E215)
- ML20005E216 + (ML20005E216)
- ML20005E217 + (ML20005E217)
- ML20005E218 + (ML20005E218)
- ML20005E219 + (ML20005E219)
- ML20005E220 + (ML20005E220)
- ML20005E222 + (ML20005E222)
- ELV-01139, Responds to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Views Item 1 as Generic Backfit & Hesitant to Commit to Requirement Until After Impact Determined for Plant + (ML20005E224)
- ML20005E225 + (ML20005E225)
- ML20005E226 + (ML20005E226)
- ML20005E228 + (ML20005E228)
- ML20005E229 + (ML20005E229)
- ML20005E230 + (ML20005E230)
- ML20005E231 + (ML20005E231)
- ML20005E232 + (ML20005E232)
- ML20005E233 + (ML20005E233)
- ML20005E234 + (ML20005E234)
- ML20005E235 + (ML20005E235)
- ST-HL-AE-3327, Forwards 10CFR50.46 Annual Rept of ECCS Model Revs + (ML20005E236)
- ST-HL-AE-3324, Forwards Revised Correspondence Distribution List of Designated Recipients.Change Marked by Asterisk + (ML20005E237)
- ML20005E238 + (ML20005E238)
- 05000455/LER-1989-003-02, :on 890227,area Radiation Monitor 2RT-AR012 Failed Automatic Checksource Test,Actuating Containment Ventilation Isolation Alarm.Caused by Faulty Detector. Detector Replaced & Monitor Returned to Svc + (ML20005E239)
- 05000354/LER-1989-024-01, :on 891129,determined That Surveillance Frequency for Safety Auxiliaries Cooling Sys Valve EG-HV-2302B Should Have Been Increased.Caused by Data Recording Error.Personnel Counseled + (ML20005E240)
- ML20005E241 + (ML20005E241)
- 05000354/LER-1989-021, :on 891013,concluded That Class 1E Electrical Separation Criteria Not Met in Reactor Protection Sys Panel. Caused by Inadequate Review of 1986 Design Change Package. Nonconforming Power Supplies Removed + (ML20005E242)
- ML20005E243 + (ML20005E243)
- IR 05000456/1989030 + (ML20005E245)
- 05000443/LER-1989-014, :on 891129,auxiliary Transformer Supply Breaker to Vital Bus E5 Tripped When Remote Manual Override Relay Energized.Caused by Procedure Inadequacies in Procedure 0S1048.01.Procedure Revised + (ML20005E246)
- 05000499/LER-1989-028, :on 891130,control Room Ventilation Sys Actuated to Recirculation Mode as Result of Spurious Signal. Caused by Memory Error Causing Microprocessor to Energize Relay Incorrectly.Troubleshooting Planned + (ML20005E247)