Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005E175 + (ML20005E175)
- ML20005E176 + (ML20005E176)
- ML20005E177 + (ML20005E177)
- ML20005E178 + (ML20005E178)
- ML20005E179 + (ML20005E179)
- NRC-89-0300, Submits Three Phase Accountability Action Plan to Correct Recent Increase in Personnel Errors Per 891221 Meeting.Phase I Involves Verifying Possible Problems W/Surveillance Testing or Return to Svc of safety-related Equipment + (ML20005E180)
- ML20005E181 + (ML20005E181)
- ML20005E182 + (ML20005E182)
- ML20005E184 + (ML20005E184)
- 05000366/LER-1989-009-03, :on 891129,reactor Protection Sys Actuation Occurred from Scram Discharge Vol High Level Condition. Caused by Equipment Failure.Backup Temporary Air Compressor Placed Into Svc & Blown Fuse Replaced + (ML20005E185)
- ST-HL-AE-3328, Requests Extension of Discretionary Enforcement Through 891228,to Allow Unit to Enter Mode 1 W/Two Items Inoperable Due to state-wide Energy Emergency Caused by Cold Weather. Mode 1 Expected by Midnight of 891226 + (ML20005E186)
- ST-HL-AE-3326, Special Rept:On 891128,valid Failure of Diesel Generator Occurred.Caused by Improperly Drilled Oil Passage on Master Rod.Remedial Actions to Restore Standby Diesel Generator 22 Includes Crankshaft Straightening & Remachining + (ML20005E188)
- ML20005E189 + (ML20005E189)
- ML20005E190 + (ML20005E190)
- ML20005E191 + (ML20005E191)
- ML20005E192 + (ML20005E192)
- ST-HL-AE-3329, Final Rept for South Texas Project City of Austin Vs Houston Light & Power Litigation Record Review Program (Phase III) + (ML20005E193)
- ML20005E194 + (ML20005E194)
- ML20005E195 + (ML20005E195)
- ML20005E197 + (ML20005E197)
- ML20005E198 + (ML20005E198)
- 05000327/LER-1989-029, :on 891121,spurious Train B Control Room Isolation Occurred.Caused by Accidental Bumping of Relays & Degraded Fuse in Circuit.Fuses Replaced & Relays Removed & Replaced + (ML20005E199)
- ML20005E200 + (ML20005E200)
- ML20005E201 + (ML20005E201)
- ML20005E203 + (ML20005E203)
- ML20005E204 + (ML20005E204)
- ML20005E205 + (ML20005E205)
- ML20005E207 + (ML20005E207)
- ML20005E208 + (ML20005E208)
- ML20005E209 + (ML20005E209)
- AECM-89-0232, Certifies Implementation of fitness-for-duty Program That Meets Requirements of 10CFR26,effective 900103.Only Marijuana Metabolites Will Be Tested at Present + (ML20005E210)
- ML20005E211 + (ML20005E211)
- NLS8900469, Responds to NRC Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. Approx 6 Addl Months,Beyond Allotted 5-yr Schedule,Will Be Required to Complete All Required Valve Testing + (ML20005E212)
- ML20005E213 + (ML20005E213)
- ML20005E215 + (ML20005E215)
- ML20005E216 + (ML20005E216)
- ML20005E217 + (ML20005E217)
- ML20005E218 + (ML20005E218)
- ML20005E219 + (ML20005E219)
- ML20005E220 + (ML20005E220)
- ML20005E222 + (ML20005E222)
- ELV-01139, Responds to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Views Item 1 as Generic Backfit & Hesitant to Commit to Requirement Until After Impact Determined for Plant + (ML20005E224)
- ML20005E225 + (ML20005E225)
- ML20005E226 + (ML20005E226)
- ML20005E228 + (ML20005E228)
- ML20005E229 + (ML20005E229)
- ML20005E230 + (ML20005E230)
- ML20005E231 + (ML20005E231)
- ML20005E232 + (ML20005E232)
- ML20005E233 + (ML20005E233)
- ML20005E234 + (ML20005E234)