Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-1115, Forwards Response to Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & Surveillance.Each motor- Operated Valve Will Be Stroke Tested to Verify Valve Operability at no-pressure & no-flow Conditions + (ML20005E139)
- ML20005E140 + (ML20005E140)
- ML20005E141 + (ML20005E141)
- ML20005E142 + (ML20005E142)
- ML20005E144 + (ML20005E144)
- ML20005E146 + (ML20005E146)
- ML20005E148 + (ML20005E148)
- IR 05000482/1989029 + (ML20005E150)
- 05000271/LER-1989-025, :on 891128,primary Containment Isolation Sys Group III & Standby Gas Treatment Sys Initiation Occurred. Caused by Failure of Reactor Bldg Ventilation Radiation Monitor/Sensor Converter.Converter Replaced + (ML20005E151)
- ML20005E152 + (ML20005E152)
- ML20005E153 + (ML20005E153)
- ML20005E154 + (ML20005E154)
- ML20005E155 + (ML20005E155)
- IR 05000302/1989029 + (ML20005E157)
- ML20005E158 + (ML20005E158)
- ML20005E159 + (ML20005E159)
- ML20005E160 + (ML20005E160)
- ML20005E161 + (ML20005E161)
- ML20005E162 + (ML20005E162)
- 05000029/LER-1989-015, :on 891126,steam Generator Blowdown Continuous Composite Sampler Declared Inoperable & Analysis Not Done within 24 H.Caused by Failure to Follow Chemistry Procedures Correctly.Chemistry Personnel Counseled + (ML20005E163)
- ML20005E164 + (ML20005E164)
- ML20005E166 + (ML20005E166)
- ML20005E167 + (ML20005E167)
- ML20005E168 + (ML20005E168)
- ML20005E169 + (ML20005E169)
- ML20005E170 + (ML20005E170)
- ML20005E171 + (ML20005E171)
- GO2-89-228, Forwards Response to Regulatory Effectiveness Review,Per 891108 Request.Encl Withheld (Ref 10CFR73.21) + (ML20005E172)
- ML20005E173 + (ML20005E173)
- ML20005E174 + (ML20005E174)
- ML20005E175 + (ML20005E175)
- ML20005E176 + (ML20005E176)
- ML20005E177 + (ML20005E177)
- ML20005E178 + (ML20005E178)
- ML20005E179 + (ML20005E179)
- NRC-89-0300, Submits Three Phase Accountability Action Plan to Correct Recent Increase in Personnel Errors Per 891221 Meeting.Phase I Involves Verifying Possible Problems W/Surveillance Testing or Return to Svc of safety-related Equipment + (ML20005E180)
- ML20005E181 + (ML20005E181)
- ML20005E182 + (ML20005E182)
- ML20005E184 + (ML20005E184)
- 05000366/LER-1989-009-03, :on 891129,reactor Protection Sys Actuation Occurred from Scram Discharge Vol High Level Condition. Caused by Equipment Failure.Backup Temporary Air Compressor Placed Into Svc & Blown Fuse Replaced + (ML20005E185)
- ST-HL-AE-3328, Requests Extension of Discretionary Enforcement Through 891228,to Allow Unit to Enter Mode 1 W/Two Items Inoperable Due to state-wide Energy Emergency Caused by Cold Weather. Mode 1 Expected by Midnight of 891226 + (ML20005E186)
- ST-HL-AE-3326, Special Rept:On 891128,valid Failure of Diesel Generator Occurred.Caused by Improperly Drilled Oil Passage on Master Rod.Remedial Actions to Restore Standby Diesel Generator 22 Includes Crankshaft Straightening & Remachining + (ML20005E188)
- ML20005E189 + (ML20005E189)
- ML20005E190 + (ML20005E190)
- ML20005E191 + (ML20005E191)
- ML20005E192 + (ML20005E192)
- ST-HL-AE-3329, Final Rept for South Texas Project City of Austin Vs Houston Light & Power Litigation Record Review Program (Phase III) + (ML20005E193)
- ML20005E194 + (ML20005E194)
- ML20005E195 + (ML20005E195)
- ML20005E197 + (ML20005E197)
- ML20005E198 + (ML20005E198)