Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20003F118 + (ML20003F118)
- ML20003F119 + (ML20003F119)
- ML20003F120 + (ML20003F120)
- ML20003F121 + (ML20003F121)
- ML20003F122 + (ML20003F122)
- ML20003F123 + (ML20003F123)
- ML20003F124 + (ML20003F124)
- ML20003F125 + (ML20003F125)
- W3P81-1083, Advises That NUREG-0588 Submittal for Harsh Environs Will Be Transmitted on or Before 811001.Discusses Two Sets of Source Terms Used in Analysis + (ML20003F130)
- ML20003F131 + (ML20003F131)
- ML20003F132 + (ML20003F132)
- ML20003F134 + (ML20003F134)
- ML20003F135 + (ML20003F135)
- ML20003F136 + (ML20003F136)
- ML20003F140 + (ML20003F140)
- ML20003F141 + (ML20003F141)
- ML20003F142 + (ML20003F142)
- ML20003F143 + (ML20003F143)
- ML20003F145 + (ML20003F145)
- 05000348/LER-1981-009, Forwards LER 81-009/03L-0 + (ML20003F146)
- ML20003F147 + (ML20003F147)
- ML20003F148 + (ML20003F148)
- ML20003F149 + (ML20003F149)
- 05000348/LER-1981-009-03, /03L-0:on 810317,determined That Diesel Generator 1-2A Had Been Inoperable for 35-minute Period Following Entry Into Mode 4.Caused by Personnel Error.Personnel Instructed in Proper Procedures + (ML20003F150)
- PNO-III-81-036, on 810327,IE Authorized Resumption of All safety-related Work Including Concrete Placement.Decision Based on Favorable Insp Findings,Confirming That Appropriate Corrective Actions Were Taken by Util & Subcontractors + (ML20003F151)
- 05000348/LER-1981-008, Forwards LER 81-008/03L-0 + (ML20003F153)
- ML20003F154 + (ML20003F154)
- W3P81-1090, Forwards Conceptual Design of Operational Phase Meteorological Monitoring Sys Discussed During 810409 Telcon.Comments Requested.Diagrams Encl + (ML20003F155)
- 05000260/LER-1981-015, Forwards LER 81-015/03L-0 + (ML20003F156)
- ML20003F158 + (ML20003F158)
- 05000348/LER-1981-008-03, /03L-0:on 810313,surveillance Tests for Tech Spec 4.3.3.1 for Radiation Monitors R25 a & B Not Performed within Required Period.Caused by Personnel Not Properly Assessing Conditions for Surveillance.Test Schedule Revised + (ML20003F159)
- PNO-III-81-038, on 810406,reactor Shut Down to Repair Tube Leaks in Steam Generator 2 Due to Leakage Above Tech Specs. Plant Will Remain Shutdown for Three Wks + (ML20003F160)
- 05000364/LER-1981-004, Forwards LER 81-004/03L-0 + (ML20003F161)
- ML20003F162 + (ML20003F162)
- 05000260/LER-1981-015-03, /03L-0:on 810325,HPCI Turbine Was Removed from Svc to Repair Defective Switch 2-LS-73-5.Caused by Steam Leak Which Prevented Repair While Turbine Was Operational.Switch Repaired + (ML20003F163)
- 05000364/LER-1981-004-03, /03L:on 810314,audible Count Rate in Containment Was Lost in Mode 6.Caused by Blown Fuse in 2D Inverter. Blown Inverter Fuse Replaced + (ML20003F165)
- 05000364/LER-1981-003, Forwards LER 81-003/03L-0 + (ML20003F166)
- ML20003F168 + (ML20003F168)
- 05000320/LER-1981-007, Forwards LER 81-007/01L-0 + (ML20003F169)
- 05000364/LER-1981-003-03, /03L-0:on 810311,radiation Monitor R5 in Fuel Storage Pool Area Failed Low & Was Declared Inoperable. Caused by Loose Connector Pin.Connector Repaired + (ML20003F171)
- 05000320/LER-1981-007-01, /01L-0:on 810311,EPICOR-II Bldg Radiation Monitor Removed from Svc for Maint W/O Initiating Air Grab Samples Per Ets.Caused by Insufficient Communication Between Personnel & Foreman + (ML20003F172)
- ML20003F173 + (ML20003F173)
- ML20003F174 + (ML20003F174)
- W3P81-1089, Submits Results & Conclusions of Archeological Investigation of Backswamp Area of Util Waterford Property for Addl Cultural Resources Per 810403 Telcon Request.Survey Involved Field & Infrared Photograph Investigation + (ML20003F175)
- ML20003F176 + (ML20003F176)
- ML20003F178 + (ML20003F178)
- ML20003F179 + (ML20003F179)
- AECM-81-144, Interim Deficiency Rept 2 Re Discrepant Slopes in Instrument Process Tubing,Initially Reported on 801230.Reinsp of Instrument Process Tubing in Progress.Slope Requirements Revised.Final Rept to Be Submitted by 810812 + (ML20003F180)
- W3P81-1087, Informs That Preservice Insp Program Contract Will Be Awarded by 810615 + (ML20003F181)
- ML20003F182 + (ML20003F182)
- PNO-III-81-037, on 810402,util Announced Deferral Until 1990 Re Inservice Date for Facility.Caused by Economic Considerations + (ML20003F183)