Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19345A611 + (ML19345A611)
- ML19345A612 + (ML19345A612)
- ML19345A614 + (ML19345A614)
- 05000029/LER-1977-027, Forwards LER 77-027/03L-0 + (ML19345A616)
- ML19345A618 + (ML19345A618)
- 05000029/LER-1977-027-03, /03L-0:on 770524,biannual Recalibr Performed on Two LPIS Accumulator Channels.Instruments Below Tech Specs Limit.Recalibr Adjustments Made to Bring Channels within Tech Specs Limit + (ML19345A619)
- 05000029/LER-1977-028, Forwards LER 77-028/03L-0 + (ML19345A620)
- 05000029/LER-1977-028-03, /03L-0:on 770530,noble Gas Monitor of Primary Vent Stack Radiation Detection Sys Failed.Cause Could Not Be Ascertained as Trouble Could Not Be Repeated After Alarm Reset + (ML19345A622)
- 05000029/LER-1977-026, Forwards LER 77-026/03L-0 + (ML19345A623)
- 05000029/LER-1977-026-03, /03L-0:on 770518,control Room Received Low Flow Alarm on Primary Vent Stack Particulate Radiation Monitor Channel.Caused by Paper in Util Being Slightly Oversized & Boundup.New Roll of Paper Installed + (ML19345A625)
- 05000029/LER-1977-024, Forwards LER 77-024/03L-0 + (ML19345A626)
- 05000029/LER-1977-024-03, /03L-0:on 770428,loop Seal Discharge Radioactive Gaseous Monitor Indication Went to Zero.Caused by Drift in RM-40 Power Supply High Voltage.High Voltage Adjusted + (ML19345A628)
- 05000029/LER-1977-020, Forwards LER 77-020/03L-0 + (ML19345A629)
- 05000029/LER-1977-020-03, /03L-0:on 770415,during Paper Replacement in Main Coolant Leakage Vapor Container Air Particulate Monitor Paper Drive Found Inoperative.Caused by Deterioration of Reduction Gears.Reduction Gears Rebuilt & Lubricated + (ML19345A631)
- 05000029/LER-1976-008, Updated LER 76-008/010-0:on 760730,review of Rod Ejection Accident Analysis Revealed Error in Method Used for Core 11 Analysis.Caused by Error in Methods & Application of Analysis Codes.Sys of Documentation Control Initiated + (ML19345A634)
- ML19345A637 + (ML19345A637)
- ML19345A639 + (ML19345A639)
- ML19345A641 + (ML19345A641)
- 05000029/LER-1977-032, Forwards LER 77-032/03L-0 + (ML19345A643)
- ML19345A645 + (ML19345A645)
- 05000029/LER-1977-032-03, /03L-0:on 770611,during Surveillance testing,TV- 209 Containment Drain Line Trip Isolation Valve Failed to Close.Caused by Excessively Tightened Packing.Packing Probably Overtightened During Recent Containment Leak Insp + (ML19345A646)
- ML19345A647 + (ML19345A647)
- ML19345A649 + (ML19345A649)
- ML19345A650 + (ML19345A650)
- 05000029/LER-1977-034, Forwards Updated LER 77-034/03L-0 + (ML19345A651)
- 05000029/LER-1977-034-03, Testing of Pressurizer Code Safety valves,PR-SV-181 & 182 Found Open at Pressure Higher than Allowable.Caused by Setpoint Drift.Valves Adjusted & Retested to Verify Lifting Pressure + (ML19345A653)
- ML19345A654 + (ML19345A654)
- ML19345A656 + (ML19345A656)
- ML19345A657 + (ML19345A657)
- ML19345A658 + (ML19345A658)
- ML19345A659 + (ML19345A659)
- ML19345A662 + (ML19345A662)
- ML19345A663 + (ML19345A663)
- ML19345A664 + (ML19345A664)
- ML19345A665 + (ML19345A665)
- ML19345A666 + (ML19345A666)
- ML19345A667 + (ML19345A667)
- ML19345A668 + (ML19345A668)
- ML19345A669 + (ML19345A669)
- ML19345A670 + (ML19345A670)
- ML19345A671 + (ML19345A671)
- ML19345A672 + (ML19345A672)
- ML19345A673 + (ML19345A673)
- ML19345A674 + (ML19345A674)
- ML19345A675 + (ML19345A675)
- ML19345A676 + (ML19345A676)
- ML19345A677 + (ML19345A677)
- ML19345A678 + (ML19345A678)
- ML19345A680 + (ML19345A680)
- ML19345A681 + (ML19345A681)
- ML19345A682 + (ML19345A682)