Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19329B822 + (ML19329B822)
- ML19329B823 + (ML19329B823)
- ML19329B825 + (ML19329B825)
- ML19329B826 + (ML19329B826)
- ML19329B827 + (ML19329B827)
- ML19329B828 + (ML19329B828)
- ML19329B829 + (ML19329B829)
- ML19329B830 + (ML19329B830)
- ML19329B831 + (ML19329B831)
- ML19329B832 + (ML19329B832)
- ML19329B833 + (ML19329B833)
- ML19329B834 + (ML19329B834)
- ML19329B835 + (ML19329B835)
- ML19329B836 + (ML19329B836)
- ML19329B837 + (ML19329B837)
- ML19329B838 + (ML19329B838)
- ML19329B841 + (ML19329B841)
- ML19329B843 + (ML19329B843)
- 05000346/LER-1977-111-03, /03L-0:on 771212,standby Component Cooling Water Loop 1-2 Heat Exchanger Found Closed,Placing Unit in Action Statement of Tech Spec 3.7.3.1.Caused by Personnel Error. Unit Removed from Action Statement After Lineup of Loop 1 + (ML19329B844)
- ML19329B845 + (ML19329B845)
- 05000346/LER-1977-112-03, /03L-0:on 771216,reactor Startup Performed W/O Functional Test on Nuclear Instrumentation 3 & 4.Caused by Inadequate Trip Recovery Procedure.Facility Change Request Prepared for Tech Spec Requirement + (ML19329B846)
- 05000346/LER-1977-019-01, /01T-0:on 771117,auxiliary Feedwater Valves AF 599 & AF 608 Found Closed,Rendering Steam & Feedwater Rupture Control Sys Pressure Switch Inputs Inoperable.Caused by Procedural Deficiency.Tests Revised + (ML19329B847)
- ML19329B848 + (ML19329B848)
- 05000346/LER-1978-017-03, /03L-0:on 780126,all Meteorological Channels Became Inoperable During Blizzard.Caused by Instrumentation Power Loss Due to Tripped Breaker at Meteorological Tower. Breaker Reset on 780128 + (ML19329B849)
- ML19329B851 + (ML19329B851)
- 05000346/LER-1977-018-01, /01T-0:on 771108,station Review Board Found Auxiliary Feed Pump Turbine Governor Valve Vibrational Closure Design Deficiency.Caused by Lack of Force to Hold Valve Open.Requests Design Mod for Pump Turbines + (ML19329B852)
- ML19329B855 + (ML19329B855)
- ML19329B857 + (ML19329B857)
- 05000346/LER-1978-018-03, /03L-0:on 780208,diesel Generator 1-1 Making Unusual Noises During Monthly Test.Unusual Noise Traced to Turbocharger.Exact Cause Undetermined.Turbocharger Replaced & Diesel Generator Monthly Test Completed + (ML19329B858)
- ML19329B859 + (ML19329B859)
- ML19329B860 + (ML19329B860)
- 05000346/LER-1978-020-03, /03L-0:on 780210,reactor Protection Sys Channel 3 Hot Leg Temp String TI-RC3B4 Declared Inoperable.Caused by Loose Wire Connection.Loose Terminal at Temp Element Tightened,Rendering TI-RC3B4 Operable + (ML19329B861)
- ML19329B862 + (ML19329B862)
- ML19329B864 + (ML19329B864)
- ML19329B865 + (ML19329B865)
- 05000346/LER-1978-023-03, /03L-0:on 780224,temp Indication for Reactor Protection Sys Channel 2 Spiked Tripping Channel & Shut Down Reactor.Caused by Faulty Connector Due to Dirt on Contacts. Channel 2 Temp String Modules Removed & Connectors Cleaned + (ML19329B866)
- ML19329B867 + (ML19329B867)
- ML19329B869 + (ML19329B869)
- ML19329B871 + (ML19329B871)
- ML19329B872 + (ML19329B872)
- 05000346/LER-1978-022-03, /03L-0:on 780223,flow Transmitter FTRC1A3 Found Inoperable.Caused by Defective Flow Transmitter Amplifier. Amplifier Replaced & Flow Transmitter FTRC1A3 Returned to Svc on 780226 + (ML19329B873)
- ML19329B874 + (ML19329B874)
- ML19329B875 + (ML19329B875)
- 05000346/LER-1977-116, Forwards LER 77-116/03L-0 + (ML19329B876)
- ML19329B878 + (ML19329B878)
- ML19329B879 + (ML19329B879)
- ML19329B882 + (ML19329B882)
- 05000346/LER-1977-116-03, /03L-0:on 771228,during Auxiliary Feed Pump Monthly Surveillance Test,Turbine 1-2 Speed Control Lost & Declared Inoperable.Caused by Design Deficiency.Blown Control Power Fuse & Both Relays Replaced & Modified + (ML19329B884)
- ML19329B885 + (ML19329B885)
- ML19329B887 + (ML19329B887)
- ML19329B888 + (ML19329B888)