Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19325E086 + (ML19325E086)
- B13357, Application for Amend to License NPF-49,changing Tech Specs Re Reactor Vessel Pressure/Temp Limits + (ML19325E087)
- ML19325E088 + (ML19325E088)
- ML19325E089 + (ML19325E089)
- ML19325E092 + (ML19325E092)
- ML19325E094 + (ML19325E094)
- ML19325E096 + (ML19325E096)
- ML19325E097 + (ML19325E097)
- BECO-89-153, Responds to NRC Re Violations Noted in Insp Rept 50-293/89-07.Corrective Actions:Terminal Block Replaced, post-work Functional Test of Ref Temp Switches Performed & Procedure Tp 88-78 Revised to Correct Relay Numbers + (ML19325E098)
- ML19325E099 + (ML19325E099)
- ML19325E101 + (ML19325E101)
- ML19325E102 + (ML19325E102)
- ML19325E105 + (ML19325E105)
- ML19325E106 + (ML19325E106)
- ML19325E107 + (ML19325E107)
- ML19325E108 + (ML19325E108)
- ML19325E110 + (ML19325E110)
- ML19325E111 + (ML19325E111)
- ML19325E112 + (ML19325E112)
- NUREG/CR-5404, Forwards Draft NUREG/CR-5404, Auxiliary Feedwater Sys Aging Study Vol 1:Operating Experience & Current Monitoring Practices & Final Shoreham Nuclear Power Station PRA-Based Sys Insp Plans. W/O Shoreham Nuclear Power Station.. + (ML19325E113)
- ML19325E114 + (ML19325E114)
- ST-HL-AE-3187, Responds to Generic Ltr 83-28,Action Item 2.2.1, Equipment Classification & Vendor Interface (Programs for All Safety-Related Components). Contractor Work Requests Used to Initiate Contractor Work + (ML19325E116)
- ML19325E117 + (ML19325E117)
- ML19325E118 + (ML19325E118)
- ML19325E119 + (ML19325E119)
- ST-HL-AE-3078, Proposed Tech Spec Table 4.3-1 Re Reactor Trip Sys Instrumentation Surveillance Requirements + (ML19325E120)
- ML19325E121 + (ML19325E121)
- ML19325E122 + (ML19325E122)
- ML19325E123 + (ML19325E123)
- ML19325E124 + (ML19325E124)
- ML19325E126 + (ML19325E126)
- ML19325E128 + (ML19325E128)
- ML19325E129 + (ML19325E129)
- ML19325E130 + (ML19325E130)
- BSEP-89-0970, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-324/89-20 & 50-325/89-20.Corrective Actions:Appropriate & Timely Action Plan Established Once Mgt Became Aware of Significance of Corrosion Beneath Horne Flex + (ML19325E131)
- LIC-89-1001, Withdraws 890727 Application for Amend to License DPR-40 Re Turbine Bldg Fire Water Curtain + (ML19325E132)
- ML19325E135 + (ML19325E135)
- ML19325E136 + (ML19325E136)
- ML19325E138 + (ML19325E138)
- ML19325E140 + (ML19325E140)
- ML19325E141 + (ML19325E141)
- LIC-89-1020, Forwards Suppl to 890908 Application for Amend to License DPR-40,revising Tech Spec Section 2.12 Re Control Room Air Treatment Sys + (ML19325E142)
- ML19325E143 + (ML19325E143)
- ML19325E144 + (ML19325E144)
- ML19325E145 + (ML19325E145)
- AECM-89-0198, Requests Insp Rept 50-416/89-21 Be Revised to Reflect Commitment to Conduct Unannounced Augmentation Drill Prior to 891231 + (ML19325E146)
- ML19325E147 + (ML19325E147)
- ML19325E149 + (ML19325E149)
- ML19325E150 + (ML19325E150)
- TXX-8977, Discusses Proposed Changes to Plant Emergency Plan.Figure 1.3 in Emergency Plan Will Be Revised to Be More Consistent W/Then Current FSAR Figure 13.1-2.Changes Will Be Incorporated in Emergency Plan by 900831 + (ML19325E153)
- ML19325E155 + (ML19325E155)