Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000282/LER-1979-024, Forwards LER 79-024/03L-0 + (ML19276G902)
- ML19276G903 + (ML19276G903)
- 05000282/LER-1979-024-03, /03L-0 on 790731:safety Injection Pump Test Sp 1088 Was Not Completed During Hot Shutdown as Required. Caused by Personnel Error + (ML19276G906)
- ML19276G908 + (ML19276G908)
- ML19276G909 + (ML19276G909)
- ML19276G910 + (ML19276G910)
- 05000271/LER-1979-017, Forwards LER 79-017/03L-0 + (ML19276G911)
- ML19276G912 + (ML19276G912)
- ML19276G913 + (ML19276G913)
- ML19276G914 + (ML19276G914)
- ML19276G915 + (ML19276G915)
- ML19276G916 + (ML19276G916)
- 05000271/LER-1979-017-03, /03L-0 on 790731:during Normal Operations, Containment Air Monitor Pump Found Inoperable. Caused by Corrosion Seizure of Vanes.Spare Pump Installed & Failed Pump Overhauled.Engineering Review in Progress + (ML19276G917)
- 05000317/LER-1979-027, Forwards LER 79-027/03L-0 + (ML19276G920)
- ML19276G921 + (ML19276G921)
- ML19276G922 + (ML19276G922)
- ML19276G923 + (ML19276G923)
- 05000317/LER-1979-027-03, /03L-0 on 790719:metrascope Position of Control Element Assemblies Was Lost.Caused by Faulty Metrascope Power Supply.Faulty Components Replaced,Setpoints Calibr & Alarms Cleared + (ML19276G924)
- ML19276G925 + (ML19276G925)
- ML19276G926 + (ML19276G926)
- ML19276G927 + (ML19276G927)
- 05000280/LER-1979-011-03, /03X-1 on 790828:process & Ventilation Particulates & Gaseous Monitors Were W/O Power on Two Occasions.Caused by Loose Lug Connection on Power Supply Cable.Loose Connection Repaired & Plants Restored to Svc + (ML19276G928)
- 05000346/LER-1979-086, Forwards LER 79-086/03L-0 + (ML19276G931)
- ML19276G932 + (ML19276G932)
- 05000346/LER-1979-086-03, /03L-0 on 790725:while Performing Routine Preventative Maint,Condensing Unit Train 2 of Control Room Emergency Ventilation Sys Would Not Start.Caused by Failure of Thermistor in Compressor Motor Winding + (ML19276G933)
- 05000260/LER-1979-018, Forwards LER 79-018/03L-0 + (ML19276G934)
- ML19276G935 + (ML19276G935)
- ML19276G936 + (ML19276G936)
- 05000338/LER-1979-094, Forwards LER 79-094/03L-0 + (ML19276G937)
- ML19276G938 + (ML19276G938)
- ML19276G939 + (ML19276G939)
- ML19276G940 + (ML19276G940)
- ML19276G941 + (ML19276G941)
- 05000338/LER-1979-094-03, /03L-0 on 790726:ventilation Stack Particulate Radiation Monitor RM-VG112 Failed & Was Inoperable for 10-h. Caused by Faulty Power Supply.New Power Supply Ordered. Temporary Power Supply Now in Use + (ML19276G942)
- IR 05000326/1979002 + (ML19276G943)
- ML19276G944 + (ML19276G944)
- L-79-186, Forwards Final Rept Responding to IE Bulletins 79-02 & 02,Revision 1,re Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts.Table Encl W/Results of Insp & Testing,Nonconformances & Deficiencies + (ML19276G945)
- ML19276G946 + (ML19276G946)
- ML19276G947 + (ML19276G947)
- ML19276G948 + (ML19276G948)
- ML19276G949 + (ML19276G949)
- ML19276G950 + (ML19276G950)
- ML19276G952 + (ML19276G952)
- ML19276G958 + (ML19276G958)
- ML19276G961 + (ML19276G961)
- ML19276G962 + (ML19276G962)
- IR 05000445/1979016 + (ML19276G964)
- ML19276G965 + (ML19276G965)
- ML19276G967 + (ML19276G967)
- ML19276G968 + (ML19276G968)
- ML19276G969 + (ML19276G969)