- ML18127B063 + (ML18127B063)
- L-77-116, Letter RWT Overflow + (ML18127B072)
- L-76-414, Letter Enclosure of Generic Report on Overpressure Protection for Operating CE Ness + (ML18127B074)
- L-77-111, Response to Request for Additional Information Steam Generator Operating History + (ML18127B086)
- ML18127B094 + (ML18127B094)
- ML18127B100 + (ML18127B100)
- ML18127B101 + (ML18127B101)
- ML18127B102 + (ML18127B102)
- ML18127B104 + (ML18127B104)
- ML18127B105 + (ML18127B105)
- ML18127B106 + (ML18127B106)
- ML18127B107 + (ML18127B107)
- ML18127B108 + (ML18127B108)
- ML18127B109 + (ML18127B109)
- ML18127B115 + (ML18127B115)
- L-76-437, Florida Power & Light Co.S Response to NRCs Letter of 8/1/1976 Concerning Anticipated Transients Without Scram + (ML18127B118)
- L-76-412, Correction for Fp&Ls Letter of 12/2/1976 + (ML18127B125)
- L-76-416, Response to Letter of 11/5/1976, Forwards Requested Additional Appendix I Information + (ML18127B126)
- L-76-415, Forwards Preoperational Test Procedure No. 0700080B,, Steam Generator Feedwater Hammer Test + (ML18127B127)
- ML18127B128 + (ML18127B128)
- ML18127B136 + (ML18127B136)
- L-76-401, Letter Supplements Information Repair Report CEN-38(f)-P, Rev. 1, and Documents Results of Recent Discussions with Staff. FP&L Concluded Additional Monitoring Using Traversing Incore Probes Would Not Be Appropriate + (ML18127B137)
- ML18127B139 + (ML18127B139)
- L-76-381, Response to Request of 9/30/1976 for Information on Operating Experience with Loose-Parts and Loose-Parts Monitoring System + (ML18127B141)
- ML18127B143 + (ML18127B143)
- L-76-376, Replacement of CEDM 44 During the Present Outage Is Complete, Fulfilling Condition J of Enclosure 1 to Operating License. FP&L Requests Condition J to Be Deleted + (ML18127B144)
- L-76-356, FP&L Wants to Withdraw Request of 8/3 and 10/7/1976 for Deletion of Section J of Enclosure 1 to Operating License. FP&L Will Renew Request for Deletion Upon Completion of Replacement of CEDM 44 + (ML18127B148)
- ML18127B149 + (ML18127B149)
- L-76-352, FP&L Does Not Plan to Replace CEDM 44 During the Present Outage. FP&L Requests Section J Be Deleted from Enclosure 1 to Operation License + (ML18127B150)
- ML18127B151 + (ML18127B151)
- ML18127B154 + (ML18127B154)
- ML18127B156 + (ML18127B156)
- L-76-326, Response to Letter of 8/13/1976 to Evaluate Reactor Coolant System Design and Provide Certain Information Regarding Susceptibility to Overpressurization Events, FP&L Will Report the Results by 10/15/1976 + (ML18127B157)
- ML18127B164 + (ML18127B164)
- ML18127B167 + (ML18127B167)
- ML18127B168 + (ML18127B168)
- IR 05000458/2018011 + (ML18127B169)
- ML18127B172 + (ML18127B172)
- ML18127B175 + (ML18127B175)
- ML18127B178 + (ML18127B178)
- DT-18-12, Management Directive 8.1, Abnormal Occurrence Reporting Procedure + (ML18127B179)
- ML18127B181 + (ML18127B181)
- ML18127B184 + (ML18127B184)
- L-77-392, Combustion Engineering Reported Potential CEA-to-Guide-Tube Interaction That Lead to Deterioration of Guide Tube. FP&L Implemented Weekly Cycling of CEAs as Requested by NRC Per Phone Conversation on 12/23/1977. Will Prepare . + (ML18127B185)
- L-77-276, Proposed Amendment to Facility Operating License DPR-67, Supplemental Information. Requests That Extension of Due Date for Specification 4.4.5 Be Deleted from Proposed Amendment + (ML18127B193)
- L-77-164, Letter Forwarding Copies of a Supplementary Startup Report Covering the Remainder of the Test Program + (ML18127B196)
- ML18127B206 + (ML18127B206)
- L-77-333, Letter Regarding Inservice Inspection Program. Expects to Complete Response in About 30 Days & Plan to Forward by 11/30/1977 + (ML18127B210)
- L-77-314, Letter Advising That FP&L Is in Compliance with the Physical Search Requirements of 10 CFR 73.55 + (ML18127B213)
- PMNS20180523, Design Certification Review Discussions - Response to RAI 9092, 9196 and 9128 + (ML18127B214)
- L-77-305, Submittal of Drawings for Inservice Inspection and Testing Program + (ML18127B216)