Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000311/LER-1998-011-01, :on 980803,ESFA During a 4KV Automatic Transfer Test Was Noted.Caused by Premature Release of Control Console Pushbutton Due to Inadequate Procedural Step.Revised Procedure + (ML18106A852)
- 05000311/LER-1998-007-01, :on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Cause of Event Has Not Yet Been Determined.Assembled Root Cause Team & Replaced Affected Tubing + (ML18106A853)
- LR-N980409, Forwards FFD Performance Data Rept for Six Month Period Ending 980630,IAW Requirements of 10CFR26.71(d) + (ML18106A854)
- ML18106A857 + (ML18106A857)
- LR-N980422, Special Rept:On 980816,RMS Channel 1R15 Inoperable for Greater than Seven Days.Cause Is Under Investigation. Replacement of Detector Assembly W/Higher Temperature Rated Detector to Mitigate Effects to Be Completed by 981019 + (ML18106A859)
- ML18106A861 + (ML18106A861)
- LR-N980419, Forwards for NRC Approval,Request Change to Nuclear Business Unit Emergency Plan for Hope Creek & Salem Generating Stations.Pse&G Requests Approval of Change by 981015 + (ML18106A862)
- ML18106A865 + (ML18106A865)
- ML18106A866 + (ML18106A866)
- IR 05000272/1998099 + (ML18106A868)
- ML18106A870 + (ML18106A870)
- ML18106A872 + (ML18106A872)
- ML18106A873 + (ML18106A873)
- LR-N98-0435, Monthly Operating Rept for Aug 1998 for Salem Unit 1.With + (ML18106A874)
- LR-N98-0436, Monthly Operating Rept for Aug 1998 for Salem Generating Station,Unit 2.With + (ML18106A875)
- LR-N980358, Application for Amends to Licenses DPR-70 & DPR-75,modifying TSs 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity + (ML18106A876)
- ML18106A877 + (ML18106A877)
- ML18106A878 + (ML18106A878)
- 05000311/LER-1996-006-01, :on 960717,determined That non-radioactive Liquid Basin Radwaste Monitor Inoperable During Low Head Conditions.Caused by Inadequate Design Change Package.Design Change 1EC3663-01 Has Been Installed.With + (ML18106A879)
- 05000272/LER-1998-013, :on 980806,operation with TS Required Equipment OOS Was Noted.Caused by Human Error.Reviewed Processes & Practices Re Safety Sys Status Control,Procedure Rev & Extra Training.With + (ML18106A880)
- LR-N980448, Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide as Protective Action During Severe Reactor Accidents. Believes That Discussion Contained in SECY-98-061 Should Be Included in Draft NUREG + (ML18106A881)
- 05000311/LER-1998-013-01, :on 980820,noted Surveillance of Containment Penetration Overcurrent Protection Devices Missed.Caused by Human Error.Satisfactorily Tested Apprpriate Breakers & Disciplined Involved Personnel.With + (ML18106A882)
- LR-N980450, Forwards Response to 980803 RAI Re Proposed Amend to Modify TS 3/4 7.7, Auxiliary Building Exhaust Air Filtration Sys + (ML18106A883)
- ML18106A884 + (ML18106A884)
- ML18106A886 + (ML18106A886)
- LR-N980415, Application for Amends to Licenses DPR-72 & DPR-75,modifying TS 3/4.9.4 to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch + (ML18106A892)
- ML18106A893 + (ML18106A893)
- ML18106A894 + (ML18106A894)
- 05000311/LER-1998-012, :on 980725,noted That Afs Was Operated with Less than Required Number of Operable AFW Pumps.Caused by Improper Procedure Implementation.Runout Protection Pressure Device for 22 AFW Pumps Was Returned to Svc.With + (ML18106A895)
- ML18106A898 + (ML18106A898)
- IR 05000272/1998302 + (ML18106A900)
- ML18106A901 + (ML18106A901)
- ML18106A902 + (ML18106A902)
- ML18106A904 + (ML18106A904)
- ML18106A906 + (ML18106A906)
- 05000311/LER-1998-014, :on 980918,discovered That Fire Barrier Matl for HVAC Ducts Does Not Meet Required Level of Fire Resistance.Cause Indeterminate.Established Appropriate Compensatory Actions for Fire Barriers.With + (ML18106A907)
- ML18106A911 + (ML18106A911)
- LR-N98-0478, Monthly Operating Rept for Sept 1998 for Salem,Unit 1.With + (ML18106A913)
- LR-N98-0479, Monthly Operating Rept for Sept 1998 for Salem,Unit 2.With + (ML18106A915)
- LR-N980452, Application for Amend to License DPR-75,requesting one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10.Basis for Requested Changes,Analysis Supporting No Significant Hazards Determination & Marked Up TS Pages,Encl + (ML18106A916)
- ML18106A917 + (ML18106A917)
- ML18106A918 + (ML18106A918)
- LR-N980469, Forwards Proposed Tech Spec Action Requirements & Proposed TS Bases That Incorporate Staff Comments + (ML18106A921)
- ML18106A922 + (ML18106A922)
- ML18106A923 + (ML18106A923)
- LR-N980467, Informs That Util Committed to re-evaluate Auxiliary Spray Line Approximately Three Yrs Prior to Exceeding 24-yr Limit. Util Committed to re-evaluating Unit 1 Piping Prior to 981231 & Unit 2 Prior to Dec 31,2002 + (ML18106A924)
- LR-N980493, Forwards Rev 17 to UFSAR for Salem Generating Station,Units 1 & 2. Rev 17 to Salem UFSAR Contains Identified Text,Table & Figure Changes Required to Reflect Plant Configuration as of 980416,six Months Prior to Submittal.Details Attached + (ML18106A925)
- LR-N980486, Forwards Response to NRC 980701 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions + (ML18106A928)
- ML18106A929 + (ML18106A929)
- 05000272/LER-1998-014-01, :on 980725,noted Improper Calibr of Liquid Radwaste Effluent Line Radiation Monitor.Caused by Inattention to Detail by Maint Personnel.Channel Calibr Was Successfully Performed on 1R18 on 980821.With + (ML18106A930)
- LR-N980154, Submits Request to Change QA Program for Hope Creek & Salem Generating Stations,Per Section 17.2 of Respective Ufsars. Changes to Section 17.2 of Hope Creek & Salem Ufsars, Respectively & Description of Proposed Changes Encl + (ML18106A931)