Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18093A076 + (ML18093A076)
- Press Release-I-18-005, NRC to Hold Open House to Discuss 2017 Performance of Calvert Cliffs Nuclear Power Plant + (ML18093A077)
- Press Release-I-18-006, NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss 2017 Millstone Station Performance + (ML18093A078)
- Press Release-III-18-008, NRC to Hold Open House to Discuss 2017 Performance of Duane Arnold Nuclear Power Plant + (ML18093A079)
- Press Release-III-18-009, NRC to Hold Open House to Discuss 2017 Performance of Perry Nuclear Power Plant + (ML18093A080)
- Press Release-III-18-010, NRC to Conduct Open House to Discuss 2017 Performance of Palisades Nuclear Power Plant + (ML18093A081)
- Press Release-III-18-011, NRC Names New Senior Resident Inspector at LaSalle Nuclear Power Plant + (ML18093A082)
- ML18093A091 + (ML18093A091)
- PMNS20180430, Notice of Meeting with Entergy Nuclear Operations, Inc. (Entergy) + (ML18093A093)
- RBG-47846, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 12 + (ML18093A099)
- PMNS20180424, Annual Assessment Meeting + (ML18093A101)
- PMNS20180423, Annual Assessment Meeting + (ML18093A103)
- ML18093A108 + (ML18093A108)
- ML18093A114 + (ML18093A114)
- ML18093A115 + (ML18093A115)
- ML18093A117 + (ML18093A117)
- ML18093A120 + (ML18093A120)
- ML18093A124 + (ML18093A124)
- ML18093A125 + (ML18093A125)
- ML18093A127 + (ML18093A127)
- ML18093A128 + (ML18093A128)
- ML18093A129 + (ML18093A129)
- ML18093A130 + (ML18093A130)
- ML18093A133 + (ML18093A133)
- ML18093A134 + (ML18093A134)
- 05000272/LER-1987-005-02, :on 870423,knife Switch for Group 1F Bus Underfrequency Reactor Coolant Pump Protection Found Open. Cause Unknown.Action Statement Entered & Situation Discussed W/Personnel Responsible for Maint on Switches + (ML18093A135)
- ML18093A139 + (ML18093A139)
- ML18093A140 + (ML18093A140)
- ML18093A142 + (ML18093A142)
- ML18093A143 + (ML18093A143)
- IR 05000272/1987012 + (ML18093A145)
- 05000311/LER-1987-006-01, :on 870506,individual Established to Act as Fire Watch for Continuous Monitoring of Ek & DC Areas Provided Inadequate Fire Watch.Caused by Personnel Error. Administrative Controls for Work Reviewed + (ML18093A146)
- 05000311/LER-1987-007-01, :on 870511,unsealed Penetration Between 84 Ft Elevation Switchgear Room & 100 Ft Elevation Relay Room Discovered.All Fire Barrier Penetration Seals Will Be Reviewed & Fire Watch Will Be Maintained + (ML18093A162)
- ML18093A163 + (ML18093A163)
- ML18093A164 + (ML18093A164)
- ML18093A166 + (ML18093A166)
- ML18093A168 + (ML18093A168)
- ML18093A171 + (ML18093A171)
- 05000311/LER-1987-008-01, :on 870519,discovered That Tech Spec Surveillance 4.5.2.b Partially Completed for Previous Month. Caused by Personnel Error.Surveillance Completed & Individual Responsible Counseled + (ML18093A172)
- 05000272/LER-1987-007-02, :on 870602,Unit 1 Experienced Turbine Trip/ Reactor Trip from 100% Power.Caused by Lightning Strike Causing Actuation of Cross Trip Scheme.Cross Trip Scheme Will Be Removed Upon Return to Svc + (ML18093A173)
- ML18093A174 + (ML18093A174)
- ML18093A175 + (ML18093A175)
- ML18093A179 + (ML18093A179)
- ML18093A180 + (ML18093A180)
- ML18093A181 + (ML18093A181)
- 05000272/LER-1987-006-02, :on 870525,observed Spring Charging Motor for Centrifugal Charging Pump 11 4 Kv Breaker Not Attached to Breaker Framework.Caused by Loosening of 4 Inch Bolts. Breakers Visually Examined for Loose Bolts + (ML18093A182)
- ML18093A183 + (ML18093A183)
- ML18093A185 + (ML18093A185)
- ML18093A188 + (ML18093A188)
- ML18093A189 + (ML18093A189)
- IR 05000272/1987013 + (ML18093A190)