Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18030A033 + (ML18030A033)
- ML18030A034 + (ML18030A034)
- ML18030A036 + (ML18030A036)
- PMNS20180078, Meeting Announcement - Category 1 Meeting + (ML18030A038)
- ML18030A039 + (ML18030A039)
- ML18030A040 + (ML18030A040)
- ML18030A042 + (ML18030A042)
- ML18030A043 + (ML18030A043)
- ML18030A044 + (ML18030A044)
- ML18030A045 + (ML18030A045)
- ML18030A046 + (ML18030A046)
- ML18030A047 + (ML18030A047)
- ML18030A048 + (ML18030A048)
- ML18030A049 + (ML18030A049)
- ML18030A050 + (ML18030A050)
- ML18030A051 + (ML18030A051)
- ML18030A052 + (ML18030A052)
- ML18030A053 + (ML18030A053)
- ML18030A054 + (ML18030A054)
- ML18030A055 + (ML18030A055)
- ML18030A060 + (ML18030A060)
- ML18030A064 + (ML18030A064)
- ML18030A065 + (ML18030A065)
- ML18030A066 + (ML18030A066)
- PLA-1030, Forwards Addl Info Re Valve Accelerations Per Seismic Qualification Review Team Audit of Util 811229 Submittal + (ML18030A067)
- PLA-1075, Revises Paragraph I.B.4 of Util Re Preservice/ Inservice Exam.Augmented Preservice & Inservice Insp Programs Have Been Established in Accordance w/NUREG-0619 + (ML18030A069)
- PLA-3336, Responds to NRC Re Violations Noted in Insp Repts 50-387/89-33 & 50-388/89-31.Corrective Actions:Rhr Svc Water Pump 2P506B Remains in Inoperable Status Until Cause of Deviation Determined & Condition Corrected + (ML18030A070)
- PLA-3359, Responds to Questions Delineated in Re Diesel Generator Events That Occurred During Sept & Oct 1989.Draft Procedures for Proposed Intake Air Temp Test Program Transmitted to NRC on 900205.Revised Procedures Encl + (ML18030A071)
- PLA-3396, Forwards Rev 1 to SEA-EE-183, Evaluation of Unit 1 Computer Class 1E - Non-Class 1E Interfaces & Rev 1 to SEA-EE-184, Evaluation of Unit 1 Annunciator Class 1E - Non-Class 1E Interfaces + (ML18030A072)
- PLA-3409, Responds to Violations Noted in Insp Repts 50-387/90-80 & 50-388/90-80.Corrective Actions:Util Conducted Operator Training on How to Implement EOPs If Suppression Chamber Pressure Not Available + (ML18030A074)
- PLA-3499, Discusses Util Current Approach Re Reportability of Design Issues & Regulatory Analysis + (ML18030A075)
- PLA-3660, Forwards Calculations to Support Available Valve Factors,Per Commitment Made During Insp of Generic Ltr 89-10,Suppl 3 During Wk of 910923 + (ML18030A077)
- PLA-3663, Transmits Powerplex Response Data Comparisons to Support Approval of Topical Rept PL-NF-90-001, Application of Reactor Analysis Methods for BWR Design & Analysis Dtd Aug 1990.Encl Data Comparisons Withheld (Ref 10CFR2.790)(b)) + (ML18030A078)
- PLA-3766, Responds to NRC Re Violations Noted in Insp Repts 50-387/90-81 & 50-388/90-81.Corrective actions:AD-QA-101, Procedure Program Revised to Require Periodic Review of Procedure Format & Content & Industry Experience + (ML18030A079)
- PLA-3772, Provides Response to Violations Noted in Insp Repts 50-387/92-12 & 50-388/92-12.Corrective Actions:Informational Postings Added at Barricade to High Rad Areas Inside Drywell + (ML18030A080)
- PLA-3874, Requests Waiver of Compliance from TS 3.3.2 Action B for Table 3.3.2-1 Trip Function 4f in Order to Restore RWCU While RWCU Isolation Channel Being Restored to Operable Status + (ML18030A081)
- ML18030A082 + (ML18030A082)
- PLA-4145, Responds to RAI Re Loss of Spent Fuel Pool Cooling Initiated by Design Basis Seismic Event + (ML18030A083)
- PLA-4211, Responds to NRC Re Violations Noted in Insp Repts 50-387/94-16 & 50-388/94-16.Corrective Actions:Stand Used to Block Fire Door 44 Removed & Fusible Link Assembly Verified to Hold Door Open + (ML18030A085)
- ML18030A086 + (ML18030A086)
- PLA-4317, Provides Core Shroud Insp Scope & Schedule for SSES Unit 2 in Response to Requirements of GL 94-03 & as Committed to in Util + (ML18030A088)
- PLA-4344, Forwards Rev 22 to Emergency Plan.Changes Do Not Decrease Effectiveness of Plan & Changes Continue to Satisfy Requirements of 10CFR50,App E + (ML18030A091)
- PLA-4555, Forwards Rev 25 to Susquehanna Steam Electric Station Emergency Plan.Changes Have Been Made W/O Commission Approval as They Do Not Decrease Effectiveness of Plan. Changes,Listed + (ML18030A092)
- PLA-4565, Forwards Request for Amend to ITS Approving Use During Susquehanna Ses Unit 2 Eighth Refueling & Insp Outage Scheduled for 970315 + (ML18030A093)
- PLA-4570, Responds to NRC Re Violations Noted in Insp Repts 50-387/96-13 & 50-388/96-13.Corrective Actions:Closed HELB Doors,Issued Ltr Re HELB Door Violations & Assigned HELB Door Responsibility Under Site Engineering Organization + (ML18030A094)
- PLA-4791, Responds to NRC Re Violations Noted in Insp Repts 50-387/97-80 & 50-388/97-80.Corrective Actions:Tsis 1/2-94-007 Were Deleted on 971002.PP&L Will Submit Change to Improved TSs to Delete Ref to Svc Platform Hoist Interlock + (ML18030A096)
- PLA-4841, Forwards Proprietary Response to RAI Re Proposed License Amend 209 to TS Supporting Cycle 11 Reload.Proprietary Info Withheld,Per 10CFR2.790 + (ML18030A097)
- PLA-4975, Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved + (ML18030A099)
- PLA-4982, Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs + (ML18030A100)
- PLA-5015, Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs + (ML18030A102)
- ML18030A103 + (ML18030A103)